Kerja Praktek
Kerja Praktek
No | Nim | Nama | Perusahaan | Alamat |
---|---|---|---|---|
1 | I0721058 | PRIMA RENANDA | PT. Pertamina EP Zona 11 Field Cepu | Jl. Gajah Mada PO.BOX 1 Cepu, Blora, Jawa Tengah – 58312 |
2 | I0721019 | Fachrizal Ihsan Anugerah Akbar | PT. Telkom Indonesia Tbk (persero) | Graha Merah Putih lt-9, Jl. Gatot Subroto kav. 52, Jakarta |
3 | I0721053 | Muhammad Ilham Alghifari | PT Dirgantara Indonesia | No. 154, Jalan Pajajaran, Husen Sastranegara, Kec. Cicendo, Kota Bandung, Jawa Barat 40174 |
4 | I0721020 | FADHIL YANUAR | PT. Telkom Indonesia Tbk (persero) | Graha Merah Putih lt-9, Jl. Gatot Subroto kav. 52, Jakarta |
5 | I0721011 | AZRI NAZHIIF MUSYAFFA' | CV. CYBER OLYMPUS & CROG INTERNATIONAL ROBOTICS | Jl. Walter Monginsidi No. 14 Yogyakarta, 55241 |
6 | I0721028 | Guntur Naufal Razaqa | PT. CYBER OLYMPUS dan CROG INTERNATIONAL ROBOTICS | Jl. Walter Monginsidi No. 14 Yogyakarta, 55241 |
7 | I0721032 | IKRAR GAWANUSA BHAKTI | PT. Pertamina EP Zona 11 Field Cepu | Jl. Gajah Mada PO.BOX 1 Cepu, Kab. Blora, Jawa Tengah, 58312 |
8 | I0721002 | AFLAHAL FAHMI | PT. Pertamina EP Zona 11 Field Cepu | Jl. Gajah Mada PO.BOX 1 Cepu, Kab. Blora, Jawa Tengah, 58312 |
9 | I0721051 | MUHAMMAD FAUZAN AULIA BAHARI | PT. PLN INDONESIA POWER MRICA PGU | Raya Bonorong, Mrica, Gumiwang, Kec. Purwanegara, Kab. Banjarnegara, Jawa Tengah 53472 |
10 | I0721018 | Erena Puspita Zein | PT. Kilang Pertamina Internasional | Graha Pertamina, Gedung Fastron Lt.7-9, Jl.Medan Merdeka Timur Kav 11-13, Jakarta Pusat |
11 | I0721060 | RAHMAT DWI FEBRIYANSYAH | PT Sumber Segara Primadaya | Jl. Lingkar Timur, Desa Karang Kandri, Kecamatan Kesugihan, Kabupaten Cilacap |
12 | I0721057 | PANDU JATI NUGROHO | PT GALANUSA TEKNIK KREASITAMA | Jl. Bangka II C No. 5 - Jakarta Selatan 12720 |
13 | I0721071 | RYANDANU WAHYU ERSATAMA | PT PLN Indonesia Power Mrica PGU | Jl. Raya Banyumas - Banjarnegara No.KM 8, Mrica, Bawang, Kec. Bawang, Kab. Banjarnegara, Jawa Tengah 53471 |
14 | I0721054 | Muhammad Wijdan Muyassar | PT Galanusa Teknik Kreasitama | Jl Bangka IIC No.2 Mampang Prapatan Jakarta Selatan 12720 |
15 | I0721059 | RAFIF MAULANA HAMDI | PT Volta Indonesia Semesta Motor | Kawasan Industri Candi Blok K No 18E-18F, Purwoyoso, Kec. Ngaliyan, Kota Semarang, Jawa Tengah 50184 |
16 | I0721009 | Arjuna Ragil Burhannudin | PT Volta Indonesia Semesta | Kawasan Industri Candi Blok K no 18E&F. Kel. Purwoyoso. Kec. Ngaliyan. Semarang. |
17 | I0721073 | SHOFFIN MUHAMMAD ZAKY | PT Dirgantara Indonesia | No. 154, Jalan Pajajaran, Husen Sastranegara, Kec. Cicendo, Kota Bandung, Jawa Barat 40174 |
18 | I0721048 | MUHAMMAD FARHAN | PT Dirgantara Indonesia | No. 154, Jalan Pajajaran, Husen Sastranegara, Kec. Cicendo, Kota Bandung, Jawa Barat 40174 |
19 | I0721079 | Wisnu Pradana Aji Syahputra | PT. PLN Indonesia Power Bali PGU | Jl. Bypass Ngurah Rai Jl. Pesanggaran No.535, Pedungan, Denpasar Selatan, Kota Denpasar, Bali |
20 | I0721080 | ARYA AL FATH ANDIARY PUTRA SURYA ALAM | PT Galanusa Teknik Kreasitama | Jl Bangka IIC No.2 Mampang Prapatan Jakarta Selatan 12720 |
21 | I0721012 | Bayu Dwi Prasetyo | PT. PLN Indonesia Power Bali PGU | Jl. Bypass Ngurah Rai Jl. Pesanggaran No. 535, Pedungan, Denpasar Selatan, Kota Denpasar, Bali |
22 | I0721041 | MUHAMAD MIFTHA HAKIM | PT. Badak LNG | Jl. Raya Kutai Badak LNG Bontang-Kalimantan Timur |
23 | I0721045 | Muhammad Aqil Athaullah | PT. BADAK LNG | Jl. Kutai Raya Training Section, HRD Department, PT Badak LNG Bontang, Kalimantan Timur |
24 | I0721006 | ANANDA PUTRA KANIEZA | PT. Industri Kereta Api | JL. Yos Sudarso No.71 Madiun Lor, Kec. Mangunharjo, Kota Madiun, Jawa Timur 63122 |
25 | I0721025 | GANANG ARIS SETIAWAN | PT. Industri Kereta Api | Jl. Yos Sudarso No.71, Madiun Lor, Kec. Mangunharjo, Kota Madiun, Jawa Timur 63122 |
26 | I0721003 | ALFIANA RAMADHANI | Beehive Drone (PT. Aerotek Global Inovasi) | Jalan Arjuna 4B Wirobrajan Yogyakarta 55252 |
27 | I0719059 | Pramesta Tigris | PT Pakuwon Jati Tbk | East Coast Center 5th Floor Jl. Kejawan Putih Mutiara No. 17 Pakuwon City Surabaya 60112 |
28 | I0720074 | YUSUF FIRMANSAH | PT. Manxi Image Perkasa | Jl. Nangka II No.13, Kerten, Kec. Laweyan, Kota Surakarta, Jawa Tengah 57143 |
29 | I0720054 | Naufal Qolbu Majid | PT. Manxi Image Perkasa | Jl. Nangka II No.13, Kerten, Kec. Laweyan, Kota Surakarta, Jawa Tengah 57143 |
30 | I0720021 | FAUZAN WAKHID MUKHTAROM | PT. Manxi Image Perkasa | Jl. Mojo, Karangasem, Laweyan, Surakarta 57144 |
31 | I0720005 | ARYA ZIFA MUHARMAN | PUI - PT. Teknologi Penyimpanan Energi Listrik | Jalan Slamet Riyadi No.435, Purwosari, Laweyan, Pajang, Kec. Laweyan, Kota Surakarta, Jawa Tengah 57146 |
32 | I0720075 | Zahra Fadilla Ekasuci | PUI - PT. Teknologi Penyimpanan Energi Listrik | Jalan Slamet Riyadi No.435, Purwosari, Laweyan, Pajang, Kec. Laweyan, Kota Surakarta, Jawa Tengah 57146 |
33 | I0720059 | Rafli Sholheqin Armantya Putra | PT. Kondang Impor Ekspor (Konimex) | Jl. Mantung, Dusun II, Manang, Kec. Grogol, Kabupaten Sukoharjo, Jawa Tengah 57552 |
34 | I0720048 | Muhammad Iksan Bima Aria Pratama | PUI-PT. Teknologi Penyimpanan Energi Listrik | Jalan Slamet Riyadi No.435, Purwosari, Laweyan, Pajang, Kec. Laweyan, Kota Surakarta, Jawa Tengah 57146 |
35 | I0720031 | ISNANDARU PRASETYO | PT. Kondang Impor Ekspor (Konimex) | Jl. Mantung, Dusun II, Manang, Kec. Grogol, Kabupaten Sukoharjo, Jawa Tengah 57552 |
36 | I0719068 | Serafim Lemuel Riwibowo | PT Duniatex | Jl. Raya Palur No.Km. 7,1, Turisari, Dagen, Kec. Jaten, Kabupaten Karanganyar, Jawa Tengah 57111 |
37 | I0719032 | Hayyan Yusuf | Pusat Studi DIfabilitas LPPM UNS | Gedung LPPM UNS Lt. 2 Jl. Ir. Sutami 36A Jebres Surakarta Jawa Tengah 57126 |
38 | I0720061 | RAKHLI DIAN PRAMUDYO | PT. Geo Dipa Energi (Persero) Unit Dieng | Jl. Dieng RT.01/RW.01, Area Industri, Sikunang, Banjarnegara, Kabupaten Wonosobo, Jawa Tengah 56354 |
39 | I0720064 | REVA SETIABUDI | PT. Dirgantara Indonesia (Persero) | Jalan Pajajaran No. 154 Bandung 40174 Jawa Barat |
40 | 1234567891011 | 1234567891011 | aaaa | aaaaa |
41 | I0720047 | Muhammad Hernawan Choiri | PT. Charoen Pokphand Indonesia | Jl. Semarang – Demak, Kab. Demak, Jawa Tengah. |
42 | I0720026 | Hendrawan Purnomoaji | PT. Telkom Indonesia (Persero) Tbk | Jalan Gegerkalong Hilir No.47 Bandung 40512, Kecamatan Sukasari, Kota Bandung, Jawa Barat |
43 | I0720007 | AULIA RAHMAT TSANI WIBISONO | PT Telkom Indonesia (Persero) Tbk | Jalan Gegerkalong Hilir No.47 Kecamatan Sukasari, Kota Bandung, Jawa Barat, 40512 |
44 | I0720068 | SETYA ACHMAD YANUAR PAMUNGKAS | PT. Charoen Pokphand Indonesia | Jl. Semarang - Demak No.KM. 8, Sriwulan, Banjardowo, Kec. Genuk, Kabupaten Demak, Jawa Tengah 50117 |
45 | I0720014 | Bima Ekanto Putra | PT Galanusa Teknik Kreasitama | Jl Bangka IIC No.2 Mampang Prapatan Jakarta Selatan |
46 | I0720034 | Kaleb Nathan Zebua | PT Pindad (Persero) | Jl. Gatot Subroto, No 517, Bandung, Indonesia, 40285. |
47 | I0720077 | Ahmad Yudistira | PT Charoen Pokphand | Jl. Semarang - Demak No.KM. 8, Sriwulan, Banjardowo, Kec. Genuk, Kabupaten Demak, Jawa Tengah 50117 |
48 | I0720023 | Ferry Indrawan | PT Galanusa Teknik Kreasitama | Jl Bangka IIC No.2 Jakarta Selatan 12720 |
49 | I0720018 | DHEANERA FAIRUZ HASNA | PT PLN Unit Pelaksana Transmisi Purworejo | SUMBERAN LOR DESA SUMBER SARI KEC. BANYUURIP KAB. PURWOREJO |
50 | I0720017 | DEWANGGA SURYA HERAWAN | PT. Dirgantara Indonesia (Persero) | Jl. Pajajaran No.154, Husen Sastranegara, Kec. Cicendo, Kota Bandung, Jawa Barat, 40174 |
51 | I0720058 | RAFAEL BADRAYOGA PINARINGAN | PT. PLN (Persero) Unit Pelaksana Pelayanan Pelanggan (UP3) Surakarta | Jl. Slamet Riyadi No. 468, Purwosari, Kec. Laweyan, Kota Surakarta, Jawa Tengah 57142 |
52 | I0720049 | Muhammad Nur Hidayat | PT Sumber Segara Primadaya PLTU Cilacap | Jl. Lingkar Timur, Desa Karang Kandri, Kecamatan Kesugihan, Kabupaten Cilacap |
53 | I0719065 | Ricky Aston Susetyo | Imperial Healthtech | Jl. Gunung Sawo No. 17, Semarang, Central Java, Indonesia. |
54 | I0720022 | FELIA DINA ANGGRAINI | PT Galanusa Teknik Kreasitama | Jl Bangka IIC No.2 Mampang Prapatan Jakarta Selatan 12720 |
55 | I0720052 | NAFA ZUYYINALIA | PT. Bakoel Nusantara | Jl. Dian Nusantara 3 No.149, Kledokan, Caturtunggal, Kec. Depok, Kabupaten Sleman, Daerah Istimewa Yogyakarta 55281 |
56 | I0720051 | Muhammad Yusuf Za`imal Khunafai | PT. PLN (Persero) UP3 Surakarta | Jl. Slamet Riyadi No.468, Purwosari, Kec. Laweyan, Kota Surakarta, Jawa Tengah 57142 |
57 | I0720056 | Omar Bismantaka | PT. Bakoel Nusantara | Jl. Dian Nusantara 3 No.149, Kledokan, Caturtunggal, Kec. Depok, Kabupaten Sleman, Daerah Istimewa Yogyakarta 55281 |
58 | I0720028 | ILYAS ABDUL JALIL | PT Sumber Segara Primadaya | Jl. Lingkar Timur Karang Kandri Kecamatan Kesugihan Cilacap, Central Java Indonesia |
59 | I0720035 | Mahendra Adi Nugroho | PT Sumber Segara Primadaya | Jl. Lingkar Timur Karang Kandri Kecamatan Kesugihan Cilacap, Central Java Indonesia |
60 | I0720020 | Enggar Nurcahyo | PT Solusi Bangun Indonesia Tbk. | Jl. Insinyur Haji Juanda, Cilacap, Jawa Tengah, 53234 |
61 | I0720055 | NOFA ARSYADANA SYAUQUS SYAHID | PT Bakoel Nusantara | Perum Deppen Seturan, Jl. Dian Nusantara 3 No.149, Kledokan, Caturtunggal, Kec. Depok, Kabupaten Sleman, Daerah Istimewa Yogyakarta |
62 | I0720012 | Bagus Putra Nugraha | Dinas Komunikasi dan Informasi Kabupaten Wonogiri | Jl. Kab., Sabggrahan, Giripurwo, Kec. Wonogiri, Kabupaten Wonogiri, Jawa Tengah 57612 |
63 | I0720063 | Raymond Subianto | PT PLN (Persero) UP3 Klaten | Jl. Perintis Kemerdekaan No.3A, Peraksangkal, Jonggrangan, Kec. Klaten Utara, Kabupaten Klaten, Jawa Tengah 57435 |
64 | I0720070 | Theodore Aditya Putranto | PT PLN (Persero) UP3 Klaten | Jl. Perintis Kemerdekaan No.3A, Peraksangkal, Jonggrangan, Kec. Klaten Utara, Kabupaten Klaten, Jawa Tengah 57435 |
65 | I0720053 | Najya Anastasya | PT SOLUSI BANGUN INDONESIA TBK | Jl. Ir. H. Juanda Cilacap - 53234, Jawa Tengah |
66 | I0720072 | UMAR AHZAMY ASHHABUL KAHFI | PT PLN (Persero) UP3 Klaten | Jl. Perintis Kemerdekaan No.3A, Peraksangkal, Jonggrangan, Kec. Klaten Utara, Kabupaten Klaten, Jawa Tengah 57435 |
67 | I0720073 | Yesreel Andre Barasa | PT. Ekolektrik Konversi Mandiri Surakarta | Jl. Ki Mangun Sarkoro No. 14, Nusukan, Kec. Banjarsari, Kota Surakarta, Jawa Tengah, 57315 |
68 | I0720062 | Raoul Kennan | PT. Ekolektrik Konversi Mandiri | Jl. Ki Mangun Sarkoro No.14, Nusukan, Kec. Banjarsari, Kota Surakarta, Jawa Tengah 57135 |
69 | I0720009 | AYATULLAH SHIDDIQ | PT Wira Insani | Jl. Raya Duri-Dumi Km 8 Kota Duri-Riau (28784) |
70 | I0720013 | BAHARUDDIN DIAS SAPUTRA | PT. Indonesia Satu Tujuh | Jl. Garuda No.4A, RT.9/RW.3, Bintaro, Kec. Pesanggrahan, Kota Jakarta Selatan, Daerah Khusus Ibukota Jakarta 12330 |
71 | I0720060 | RAGATA IZZAN SHAFA | PT. Setia Kawan Makmur Sejahtera | Pabrik Kertas Setia Kawan Jayeng Kusuma VII no 12 Tulungagung, Jawa Timur, 66215 |
72 | I0720057 | PRIASTOMO INDRA BULAN | PPSDM Migas Cepu | Jl. Sorogo No.1, Kampungbaru, Karangboyo, Kec. Cepu, Kabupaten Blora, Jawa Tengah 58315 |
73 | I0719037 | Kresna Pandu Pratama | Sogy Energi Indonesia | Jl. Karonsih Utara V No. 3, Ngaliyan, Semarang |
74 | I0720037 | Mario Alfandi Wirawan | PT. Indonesia Satu Tujuh | Jl. Garuda No. 4A, Kota Jakarta Selatan, DKI Jakarta 12330 |
75 | I0720027 | ILHAM ARISWANTO | PT. PLN (PERSERO) GARDU INDUK 150k RAWALO | Banjar Parakan, Menganti, Kec. Rawalo, Kabupaten Banyumas, Jawa Tengah 53173 |
76 | I0720065 | RIDHO PRIAMBODO | PT. Indonesia Satu Tujuh | Jl. Garuda No.4A, RT.9/RW.3, Bintaro, Kec. Pesanggrahan, Kota Jakarta Selatan, Daerah Khusus Ibukota Jakarta 12330 |
77 | I0720032 | IVAN DERRY | PT. PLN (PERSERO) GARDU INDUK 150k RAWALO | Banjar Parakan, Menganti, Kec. Rawalo, Kabupaten Bayumas, Jawa Tengah 53173 |
78 | I0716029 | Royani Aulia Ihsanti | Lab. Telekomunikasi dan Pengolahan Sinyal Teknik Elektro UNS | Lt. 2 Gedung III Fakultas Teknik UNS Jl. Ir. Sutami No. 36A Surakarta |
79 | I0718021 | Muhamad Miftahus Surur | PT EKOLEKTRIK KONVERSI MANDIRI | Jl. Brigjen Sudiarto, Joyosuran, Kec. Ps. Kliwon, Kota Surakarta, Jawa Tengah |
80 | I0718015 | Ilham Gilang Pradana | PT EKOLEKTRIK KONVERSI MANDIRI | Jl. Brigjen Sudiarto, Joyosuran, Kec. Ps. Kliwon, Kota Surakarta, Jawa Tengah |
81 | I0720030 | IRFAN MAHARDIKA | PT. PLN (persero) Gardu Induk 150KV Rawalo | Jalan H. M. Bachroen, Banjar Parakan, Menganti, Kec. Rawalo, Kabupaten Banyumas, Jawa Tengah 53173 |
82 | I0720079 | AMMAR 'ALIM MUSTOFA | PT Dirgantara Indonesia | No.154, Jalan Pajajaran, Husen Sastranegara, Kec. Cicendo, Kota Bandung, Jawa Barat 40174 |
83 | I0720050 | Muhammad Shiddiq | PT. Dirgantara Indonesia | No.154, Jalan Pajajaran, Husen Sastranegara, Kec. Cicendo, Kota Bandung, Jawa Barat 40174 |
84 | I0720039 | Muhamad Isya Rizky Fauzan | PT. PLN( PERSERO) GARDU INDUK 150KV RAWALO | Jalan H. M. Bachroen, Banjar Parakan, Menganti, Kec. Rawalo, Kab. Banyumas, Jawa Tengah. Kode POS 53173 |
85 | I0720011 | Bagas Setiawan | PUI PT. PENYIMPANAN ENERGI LISTRIK | Jalan Slamet Riyadi No.435, Purwosari, Laweyan, Pajang, Kec. Laweyan, Kota Surakarta, Jawa Tengah 57146 |
86 | I0720066 | RYAN RAMADHANA | Pusat Pengembangan Sumber Daya Manusia Minyak dan Gas Bumi (PPSDM MIGAS) | Jl. Sorogo No.1, Karangboyo, Kec. Cepu, Kabupaten Blora, Jawa Tengah 58315, Indonesia |
87 | I0720033 | Jesslyn Zaneta | PT. PLN (PERSERO) UP3 GRESIK | Jl. DR. Wahidin Sudiro Husodo No.134, Karangturi, Kec. Gresik, Kabupaten Gresik, Jawa Timur 61121 |
88 | I0720019 | Dian Eka Febriyanti Adz Zahra | PT. PLN( PERSERO) UP3 GRESIK | Jl. DR. Wahidin Sudiro Husodo No.134, Karangturi, Kec. Gresik, Kabupaten Gresik, Jawa Timur 61121 |
89 | I0720003 | Anna Mayyah Soraya | PT. PLN (PERSERO) UP3 GRESIK | Jl. DR. Wahidin Sudiro Husodo No.134, Karangturi, Kec. Gresik, Kabupaten Gresik, Jawa Timur 61121 |
90 | I0720078 | ALKA ADI NUGROHO | PT PLN (Persero) Unit Pelaksana Transmisi (UPT) Salatiga | Jl. Diponegoro No.149, Sidorejo Lor, Kec. Sidorejo, Kota Salatiga, Jawa Tengah 50714 |
91 | I0720038 | MUHAMAD FAIZ ADZKIA | PT. PJB Unit Pembangkitan (UP) Gresik | Jalan Harun Thohir No. 1 Singosari, Sidorukun, Kec. Gresik, Kabupaten Gresik, Jawa Timur 61112 |
92 | I0720015 | BINTANG RAMADHAN | PT Industri Kereta Api (Persero) | Jl. Yos Sudarso No.71, Madiun Lor, Kec. Manguharjo, Kota Madiun, Jawa Timur 63122 |
93 | I0720041 | Muhammad Affan Hibatullah Harsito | PT PLN (Persero) Unit Pelaksana Transmisi (UPT) Salatiga | Jl. Diponegoro No.149, Sidorejo Lor, Kec. Sidorejo, Kota Salatiga, Jawa Tengah 50714 |
94 | I0720024 | FIKRI SAEFUDIN | PT PLN Unit Pelaksana Transmisi (UPT) Salatiga | Jl. Diponegoro No.149, Sidorejo Lor, Kec. Sidorejo, Kota Salatiga, Jawa Tengah 50714 |
95 | I0720001 | Adhitya Fajar Rachmadi | Pusat Pengembangan Sumber Daya Manusia dan Gas (PPSDM Migas Cepu) | Jl. Sorogo No.1, Kampungbaru, Karangboyo, Kec. Cepu, Kabupaten Blora, Jawa Tengah 58315 |
96 | I0720002 | ANAS HIBATULLAH DJOKO SUSILO | PT INDUSTRI KERETA API (Persero) | Jl. Yos Sudarso No. 71 Madiun 63122, Jawa Timur |
97 | I0720036 | MAHESWARA KUMARAFAZA | PT. PJB Unit Pembangkitan (UP) Gresik | Jalan Harun Thohir No. 1 Singosari, Sidorukun, Kec. Gresik, Kabupaten Gresik, Jawa Timur 61112 |
98 | I0720029 | Immanuel Satrio Putro Sulistyoaji | PT.PLN (Persero) Unit Pelaksana Transmisi (UPT) Salatiga | Jl. Diponegoro No.149, Sidorejo Lor, Kec. Sidorejo, Kota Salatiga, Jawa Tengah 50714 |
99 | I0720080 | HASYIM IZZAN GHAUS | PT. PJB Unit Pembangkitan (UP) Gresik | Jalan Harun Thohir No. 1 Singosari, Sidorukun, Kec. Gresik, Kabupaten Gresik, Jawa Timur 61112 |
100 | I0720076 | Ahmad Syahrul Hasan | PT. Setia Kawan Makmur Sejahtera | Pabrik Kertas Setia Kawan Jayeng Kusuma VII no.12 Tulungagung, jawa Timur, 66215 |
101 | I0720045 | MUHAMMAD GUNTUR ALAMSYAH | PPSDM MIGAS | Jl. Sorogo No.1, Kampungbaru, Karangboyo, Kec. Cepu, Kabupaten Blora, Jawa Tengah 58315 |
102 | I0720044 | Muhammad Fiqih Al Faishal | PPSDM Migas Cepu | Jl. Sorogo No.1, Kampungbaru, Karangboyo, Kec. Cepu, Kabupaten Blora, Jawa Tengah 58315 |
103 | I0720006 | Asri Aziziyah | Dinas Komunikasi dan Informatika Kota Pekalongan | Jl. Majapahit No.5, Podosugih, Kec. Pekalongan Barat, Kota Pekalongan, Jawa Tengah 51111 |
104 | I0720040 | MUHAMAD SANDYA RAFIYATNA | PT Freeport Indonesia | PT Freeport Indonesia Plaza 89, Lt. 5 Jl. HR. Rasuna Said Kav. X-7 No. 6 Jakarta 12940 Indonesia |
105 | I0720010 | Azalia Ananta Firdaus | PT Industri Kereta Api (Persero) | Jl. Yos Sudarso No.71, Madiun Lor, Kec. Manguharjo, Kota Madiun, Jawa Timur 63122 |
106 | I0720046 | MUHAMMAD HAMMAM AL-CHOIRI SHOFIYULLOH | PT. Industri Kereta Api | Jl. Yos Sudarso No.71, Madiun Lor, Kec. Manguharjo, Kota Madiun, Jawa Timur 63122 |
107 | I0718033 | Roni Tamado | PT Pins Indonesia | Telkom Landmark Tower, 42th floor, Jl. Gatot Subroto No.Kav. 52, RT.6/RW.1, West Kuningan, Mampang Prapatan, South Jakarta City, Jakarta 12710 |
108 | I0719033 | Hilwan Hafidzsyah | PT. Industri Kereta Api | Jl. Yos Sudarso No. 71 Madiun 63122, Jawa Timur |
109 | I0718024 | Muhammad Ibnu Sina Abbas Parlin | PT. INDONESIA POWER POWER GENERATION UNIT (PGU) SURALAYA | Jalan Raya PLTU Suralaya. Merak, Cilegon - Banten |
110 | I0718017 | Khilalul Hanif | Lentera Bumi Nusantara | Jalan Raya Ciheras, Dusun Lembur Tengah, Kampung Sindang Asih, Desa Ciheras, Kecamatan Cipatujah, Kabupaten Tasikmalaya, Jawa Barat |
111 | I0718029 | Raihan Rafif Kautsar Priyanto | PT.PETROKIMIA GRESIK | JL.Jend. Ahmad Yani, Gresik 61119, Jawa Timur |
112 | I0718035 | Syaifullah Filard L | UNS | Jl. Ir. Sutami No.36, Kentingan, Kec. Jebres, Kota Surakarta, Jawa Tengah 57126 |
113 | I0719071 | Talib Sahdha Wibowo | PT. TEXCOMS WORLDWIDE | Jl. Cemara No. 77, Pasteur, Kec. Sukajadi, Kota Bandung, Jawa Barat 40161 |
114 | I0719015 | As'ad Syahrul Munir | TEXCOMS WORLDWIDE | Jalan Cemara, No. 77 Sukajadi, Bandung 40161. Indonesia |
115 | I0719028 | Ganesya Fajar Gumilang | PT Texcoms Worldwide Bandung | Jl. Cemara 77 Sukajadi, Bandung, Jawa Barat 40161 |
116 | I0719019 | Daffa Aminuddin | Life Media | Jl. Parangtritis 97, RT 57 RW 15, Brontokusuman, Mergangsan, DI Yogyakarta 55153 |
117 | I0719006 | Aji Ghanang Amurwabhumi | PT Hijau Makmur Energi (HME) | Jl. Solo - Jogja, Meger, Kec. Ceper, Kabupaten Klaten, Jawa Tengah 57465 |
118 | I0719058 | Oemar Dhani Er | PT Polytama Propindo | Jl. Raya Juntinyuat, Km. 13, Limbangan, Kec. Juntinyuat, Kabupaten Indramayu, Jawa Barat 45282 |
119 | 12345678 | palerian | Labkom | qqeasd |
120 | I0718020 | Mohammad Ravi Rachman | SIEMENS Indonesia Pulomas Factory | Jl. Jendral Ahmad Yani Kav 67-68, Pulomas, Jakarta 13210, Indonesia |
121 | I0719072 | Wahono Aji Warjono | PUI-PT. Teknologi Penyimpanan Energi Listrik UNS | Jl. Slamet Riyadi No. 435 Pajang, Surakarta 57142 |
122 | I0719038 | Luqman Hadi Dwi Satryo | PT Pelabuhan Indonesia (Persero) Regional 2 Cabang Panjang | Jl. Yos Sudarso No.337, Kec. Panjang, Kota Bandar Lampung, Lampung |
123 | I0719069 | Stefani Widyaningrum | PT. Angkasa Pura I (Persero) Kantor Cabang Bandar Udara Internasional Adi Soemarmo Surakarta | Bandar Udara Internasional Adi Sumarmo, Jl. Bandara Adi Sumarmo, Ngesrep, Ngemplak, Tanjungsari, Ngesrep, Kec. Ngemplak, Kota Surakarta, Jawa Tengah |
124 | I0715021 | Mohammad Izzul Mukhtar | Pemerintah Desa Nangsri (Rekognisi MBKM) | Desa Nangsri, Kecamatan Kebakkramat, Kabupaten Karanganyar |
125 | I0719043 | Muchsin Ismail | Laboratorium Komputer dan Jaringan | Jl. Ir. Sutami No.36, Kentingan, Kec. Jebres, Kota Surakarta, Jawa Tengah 57126 |
126 | I0719041 | Maulana Afif | Kementerian Energi dan Sumber Daya Mineral | Jl. Medan Merdeka Sel. No.18, RT.11/RW.2, Gambir, Kecamatan Gambir, Kota Jakarta Pusat, Daerah Khusus Ibukota Jakarta 10110 |
127 | I0719052 | Muhammad Shafiy Widi Kresno Wibisono | PT PLN (Persero) UIP KALBAGTIM | Jl. MT Haryono No.384, Gn. Bahagia, Kecamatan Balikpapan Selatan, Kota Balikpapan, Kalimantan Timur 76114 |
128 | I0719034 | Ibnu Qoyim Al-Hafidzh | Lentera Bumi Nusantara | Lentera Bumi Nusantara, Jalan Raya Ciheras, Dusun Lembur Tengah, Kampung Sindang Asih, Desa Ciheras, Kecamatan Cipatujah, Kabupaten Tasikmalaya |
129 | I0718006 | Catya Afif Kasudya | PT. Telekomunikasi Indonesia Witel Purwokerto | Jalan Gerilya, Bojong, Tanjung, Kec. Purwokerto Selatan, Kabupaten Banyumas, Jawa Tengah 53144 |
130 | I0719055 | Mukhlis Dwi Nugroho | Laboratorium Komputer dan Jaringan | Jl. Ir. Sutami No.36, Kentingan, Kec. Jebres, Kota Surakarta, Jawa Tengah 57126 |
131 | I0719008 | Aldin Wildan Razaqa | Laboraturium Komputer dan Jaringan Fakultkas Teknik Universitas Negeri Sebelas Maret | Jl. Ir. Sutami No.36, Kentingan, Kec. Jebres, Kota Surakarta, Jawa Tengah 57126 |
132 | I0719048 | Muhammad Haris Humaidi | Laboratorium Komputer dan Jaringan Fakultas Teknik UNS | Jl. Ir. Sutami No.36, Kentingan, Kec. Jebres, Kota Surakarta, Jawa Tengah 57126 |
133 | I0719016 | Attala Surya Prima Amanda | Laboratorium Komputer dan Jaringan | Jl. Ir. Sutami No.36, Kentingan, Kec. Jebres, Kota Surakarta, Jawa Tengah 57126 |
134 | I0719030 | Gustav Lukman Adhi Pradhityo | PT. Geo Dipa Energi (Persero) Unit Dieng | Jl. Dieng RT.01/RW.01, Area Industri, Sikunang, Banjarnegara, Kabupaten Wonosobo, Jawa tengah 56354. |
135 | I0719066 | Royyan Nurbiksa Jaka Pratama | Lentera Bumi Nusantara | Ciheras, Cipatujah, Tasikmalaya Regency, West Java 46189 |
136 | I0719007 | Akbar Dharmawan | PT Galanusa Teknik Kreasitama | Jl. Bangka II C No. 5 - Jakarta Selatan 12720 |
137 | I0719009 | Alexander Fajar Listianto Satrio Utomo | PT Industri Kereta Api (Persero) | Jl. Yos Sudarso No. 71 Madiun 63122, Jawa Timur |
138 | I0719045 | Muhammad Ariz Fakhruddin | PT Galanusa Teknik Kreasitama | Jl. Bangka II C No. 5 - Jakarta Selatan 12720 |
139 | I0719064 | Refansyah Basu Dewa | PT. Angkasa Pura II (Persero) | Soekarno-Hatta International Airport Building, RT.001/RW.010, 600, Pajang, Benda, Kota Tangerang, Banten 15126 |
140 | I0719051 | Muhammad Rifqi Bachtiar | PT Pertamina Geothermal Energy Area Karaha | Jl. Karaha Bodas, RT/03/03, Ciselang, Kecamatan Kadipaten, Kabupaten Tasikmalaya, Provinsi Jawa Barat 46157 |
141 | I0719047 | Muhammad Fikri Arifudin | PT. Galanusa Teknik Kreasitama | Jl. Bangka II C No. 5 - Jakarta Selatan 12720 |
142 | I0719076 | Zulfikar Juan Pramasta | Lentera Bumi Nusantara | Ciheras, Cipatujah, Tasikmalaya Regency, West Java 46189 |
143 | I0719075 | Zaidan Alvin Al Hanif | Lentera Bumi Nusantara | Lentera Bumi Nusantara. Ciheras, Cipatujah, Tasikmalaya Regency, West Java 46189 |
144 | I0719017 | Azis Surya Ananda | PT Pertamina Geothermal Energy Area Karaha | Jl. Karaha Bodas, RT/03/03, Ciselang, Kecamatan Kadipaten, Kabupaten Tasikmalaya, Provinsi Jawa Barat 46157 |
145 | I0719021 | Dika Kartika Oktaviani | PLN UPDK BENGKULU | Jl. Raya Bengkulu - Curup KM.72 Kecamatan Ujan Mas, Kabupaten Kepahiang, Bengkulu |
146 | I0719023 | Faiq Izzul Islami | PT Mulya Jatra | Jl. Kyai Nawawi No.51, Wadungasri, Kec. Waru, Kabupaten Sidoarjo, Jawa Timur 61256 |
147 | I0719044 | Muhammad Ardhana Gusti Syahputra | PT. Kayaba Indonesia | Jl. Jawa Blok II No.4 Kawasan Industri MM 2100, Jatiwangi, Kec. Cikarang Bar., Kabupaten Bekasi, Jawa Barat 17520 |
148 | I0719003 | Abdul Qodir Jaelani | PT. GEODIPA ENERGI | Jl.Dieng RT.01/RW.01, Area Industri,Sikunang,Banjarnegara,Kabupaten Wonosobo,Jawa Tengah |
149 | I0769001 | labkom | Labkom | Gd 6 Lt 4 |
150 | I0719014 | Arif | PT Petrokimia Gresik | Jl. Jenderal Ahmad Yani, Gresik 61119 |
151 | I0719062 | Rafi Panhardyansyah Dananjaya | PT Petrokimia Gresik | Jl. Jend. Ahmad Yani, Gresik 61119, Jawa Timur |
152 | I0719011 | Alloyus Bayu Hans Abram | PT Pelabuhan Indonesia Regional 2 | Jl. Yos Sudarso No.337, Panjang, Bandar Lampung, Indonesia |
153 | I0719025 | Fazlur Rahman Javier | PT PLN UNIT INDUK TRANSMISI JAWA BAGIAN TENGAH | Komp PLN/GI. Cigereleng, Jl. Moch. Toha No.KM 04, Ciseureuh, Regol, Kota Bandung, Jawa Barat 40255 Telepon: (022) 5201723 |
154 | I0719074 | Wisanggeni Titovandaru | PT. Pelabuhan Indonesia (Persero) Regional 2 Cabang Panjang | Jl. Yos Sudarso No.337, Kec. Panjang, Kota Bandar Lampung, Lampung 35241 |
155 | I0719026 | Fiqi Haiqal | PT Petrokimia Gresik | Jalan Jenderal Ahmad yani, Gresik |
156 | I0719046 | Muhammad Dhafier Mu'afa | PT. Angkasa Pura II (Persero) | Soekarno-Hatta International Airport Building, RT. 001/RW. 010, 600, Pajang, Benda, Kota Tangerang, Banten 15126 |
157 | I0719050 | Muhammad Raflie Pangestu | PT. Pelabuhan Indonesia (Persero) Regional 2 Cabang Panjang | Jl. Yos Sudarso No.337, Kec. Panjang, Kota Bandar Lampung, Lampung 35241 |
158 | I0719020 | Damaris Adi Waskitho | PT Geo Dipa Energi (Persero) Unit Dieng | Jl. Dieng RT. 01 / RW. 01, Area Industri, Sikunang, Banjarnegara, Kabupaten Wonosobo, Jawa Tengah 56354 |
159 | I0719070 | Stefanus Marcellindo | PT. INDONESIA POWER UNIT PLTU JAWA TENGAH 2 ADIPALA OMU | Bunton, Kec. Adipala, Kabupaten Cilacap, Jawa Tengah |
160 | I0719022 | Dina Mifika Sari | PT. INDONESIA POWER UNIT PLTU JAWA TENGAH 2 ADIPALA OMU | Bunton, Kec. Adipala, Kabupaten Cilacap, Jawa Tengah |
161 | I0719031 | Hanif Wisti Julitama | PT INKA (persero) | Jl. Yos Sudarso No. 71 Madiun 63122, Jawa Timur Telp. (0351) 452271-74, Fax (0351) 452275 |
162 | I0719063 | Rebekka Siswandina Sari | PT PLN (Persero) UPT Purwokerto | Jl Jend Gatot Subroto No 87 Purwokerto |
163 | I0719002 | Abdul Latif Priyadi | PT PLN (Persero) UPT Purwokerto | JL Jend Gatot Subroto No 87 Purwokerto |
164 | I0719027 | Fitroh Romadhon | PT. Pertamina Lubricants Production Unit Cilacap | 8253+RFM, Banyusrep, Lomanis, Kec. Cilacap Tengah, Kabupaten Cilacap, Jawa Tengah 53221 |
165 | I0719036 | Jihan Salsabila | Pertamina | Indramayu, Jawa Barat |
166 | I0719067 | Salsabila Ananda Putri | PT PLN (Persero) UPT Purwokerto | Jl Jend Gatot Subroto No 87 Purwokerto |
167 | I0719073 | Wahyu Kusumojati Sapardi | PT. Syntek Otomasi Indonesia | Jl. Mampang Prapatan Raya No.17, Blok G-H, Lt.2, Jakarta Selatan 12790 |
168 | I0719010 | Ali Ekatma Rendra | PT. PLN (Persero) Unit Induk Transmisi Jawa Bagian Tengah | Komp PLN/GI. Cigereleng, Jl. Moch. Toha No.KM 04, Ciseureuh, Regol, Kota Bandung, Jawa Barat 40255 |
169 | I0719053 | Muhammad Wildan Alfatih | PT Formulatrix | Jl. Sukarno Hatta No.121, Cebongan, Kec. Argomulyo, Kota Salatiga, Jawa Tengah |
170 | I0719040 | Mark Reindhard Joyakin Silalahi | PLTU Pangkalan Susu Operation and Maintenance Service Unit | Jl. Tanjung Pasir, Pangkalan Susu, Kabupaten Langkat, Sumatera Utara |
171 | I0719061 | Putra Maulana Yusuf | PT. Angkasa Pura II (Persero) | Soekarno-Hatta International Airport Building, RT.001/RW.010, 600, Pajang, Benda, Kota Tangerang, Banten 15126 |
172 | I0719001 | 'Izzuddin 'Ulwan | PT Solusi Bangun Indonesia Tbk | Jl. Ir. H. Juanda PO Box 272 Cilacap 53234 - Indonesia |
173 | I0719039 | Mahaputra Nur Muhammad | PT. HAGIHARA WEST JAVA INDUSTRIES | KIIC Block B-1 Jl.Tol.Jakarta-Cikampek Km47 Kawasan Industri KIIC Jl.Maligi I Lot B1 Karawang, West Java, Indonesia |
174 | I0719056 | Nadya Puteri Nur Utomo | PT Angkasa Pura 1 Cabang Adi Soemarmo Surakarta | Jl. Bandara Adi Sumarmo, Ngesrep, Ngemplak, Tanjungsari, Surakarta |
175 | I0719049 | Muhammad Hasya Nurfaizi | PLN UNIT INDUK TRANSMISI JAWA BAGIAN TENGAH | Komp PLN/GI. Cigereleng, Jl. Moch. Toha No.KM 04, Ciseureuh, Regol, Kota Bandung, Jawa Barat 40255 Telepon: (022) 5201723 |
176 | I0719005 | Ahmad Hanif Shalahuddin | PT. Selaras Daya Utama | PT Selaras Daya Utama (SEDAYU) Jalan Raya Kebayoran Lama 156, Jakarta Barat |
177 | I0719004 | Adriel Satrio Nugroho | PT PLN (Persero) UIT Jawa Bagian Tengah | Komplek PLN Jalan Moh. Toha, Km4 Bandung |
178 | I0719013 | Andika Sukma Pradana | PT XL Axiata Tbk | XL Axiata Tower JL. H. R. Rasuna Said X5 Kav. 11-12 Kuningan Timur, Setiabudi, Jakarta Selatan 12950 Indonesia |
179 | I0719029 | Geovani Rahmad Illahi | PT. Selaras Daya Utama | Jl. Raya Kby. Lama No.156, RT.1/RW.2, Sukabumi Sel., Kec. Kb. Jeruk, Kota Jakarta Barat, Daerah Khusus Ibukota Jakarta 11560 |
180 | I0718023 | Muhammad Ghozy Al Hakim | Laboratorium Komputer dan Jaringan Teknik Elektro | Jl. Ir. Sutami No.36, Kentingan, Kec. Jebres, Kota Surakarta, Jawa Tengah 57126 |
181 | I0717032 | Muhammad Rizqi Subeno | Pengembangan Resusitator Portable | Fakultas Teknik, UNS. Jalan Ir Sutami No.36, Kentingan, Kec. Jebres, Kota Surakarta, Jawa Tengah 57126 |
182 | I0717009 | Bakasrian Fericoari | Pengembangan Resusitator Portable | Fakultas Teknik, UNS. Jalan Ir Sutami No.36, Kentingan, Kec. Jebres, Kota Surakarta, Jawa Tengah 57126 |
183 | I0718027 | Nur Udin Galang Ga | PLN Unit Pelaksana Pelayanan Pelanggan (UP3) Yogyakarta | Jl. Gedongkuning No.3, Pringgolayan, Banguntapan, Kec. Banguntapan, Bantul, Daerah Istimewa Yogyakarta 55198 |
184 | I0718001 | Abraham Babtistio | PT. Indonesia Power Unit Pembangkit Semarang | Jl. Ronggowarsito Komplek Pelabuhan Tanjung Emas, Semarang, Jawa Tengah |
185 | I0718012 | Gibran Dzulfikar Ghaffara | PPSDM Migas Cepu | Jl. Sorogo No.1, Kampungbaru, Karangboyo, Kec. Cepu, Kabupaten Blora, Jawa Tengah 58315 |
186 | I0718002 | Ahmad Azzam Hafidz | PT. Siemens Indonesia | Jl. Pulo Mas Utara No.3, RW.13, Kayu Putih, Pulo Gadung, Jakarta Timur, Jakarta |
187 | 10011001 | Akun Contoh | Contoh | Contoh |
188 | I0718025 | Nada Syadza Azizah | PT. PERTAMINA (PERSERO) RU IV CILACAP | Jl. MT. Haryono No.77, Rawakeong, Lomanis, Kec. Cilacap Tengah, Kabupaten Cilacap, Jawa Tengah 53221 |
189 | I0718007 | Desi Sunyahni | PPSDM Migas Cepu | JI. Sorogo No.1, Kampungbaru, Karangboyo, Kec.Cepu, Kabupaten Blora, Jawa Tengah 58315 |
190 | I0718037 | Taufik Widyastama | PPSDM Migas Cepu | Jl. Sorogo No.1, Karangboyo, Kec. Cepu, Kabupaten Blora, Jawa Tengah 58315, Indonesia |
191 | I0718016 | Imam Arif | PT. PLN (persero) UP3 Yogyakarta | Jalan. Gedongkuning No. 3, Banguntapan, Bantul, Daerah Istimewa Yogyakarta 55198 |
192 | I0718034 | Slash Arthur Edi Sumawang | LENTERA BUMI NUSANTARA | Lentera Bumi Nusantara, Jalan Raya Ciheras, Dusun Lembur Tengah, Kampung Sindang Asih, Desa Ciheras, Kecamatan Cipatujah, Kabupaten Tasikmalaya 46189 |
193 | I0718003 | Alvian Aji Pangestu | LENTERA BUMI NUSANTARA | Lentera Bumi Nusantara, Jalan Raya Ciheras, Dusun Lembur Tengah, Kampung Sindang Asih, Desa Ciheras, Kecamatan Cipatujah, Kabupaten Tasikmalaya 46189 |
194 | I0718031 | Rizal Mujaddid Irsyad | LENTERA BUMI NUSANTARA | Lentera Bumi Nusantara, Jalan Raya Ciheras, Dusun Lembur Tengah, Kampung Sindang Asih, Desa Ciheras, Kecamatan Cipatujah, Kabupaten Tasikmalaya, 46189 |
195 | I0718022 | Muhammad Didin Kamaludin | Lentera Bumi Nusantara | Lentera Bumi Nusantara, Jalan Raya Ciheras, Dusun Lembur Tengah, Kampung Sindang Asih, Desa Ciheras, Kecamatan Cipatujah, Kabupaten Tasikmalaya 46189 |
196 | I0718018 | M. Fatkhi Futukhal Arifin | Lentera Bumi Nusantara | Lentera Bumi Nusantara, Jalan Raya Ciheras, Dusun Lembur Tengah, Kampung Sindang Asih, Desa Ciheras, Kecamatan Cipatujah, Kabupaten Tasikmalaya 46189 |
197 | I0718009 | Fandi Surya Adinata | SIAB Indonesia | Jalan Asoka no. 7 RT 01/18, Jaten, Karanganyar 57731 |
198 | I0718032 | Rois Hasan Muhammad | PT. Telekomunikasi Indonesia Pusat Surakarta | Jl. Mayor Kusmanto No.1, Kedung Lumbu, Ps. Kliwon, Kota Surakarta, Jawa Tengah 57133, Indonesia |
199 | I0718010 | Firmansyah Abada | PT Elektra Mega Mandiri | Jl.Raya Fatmawati Kav.20, Ruko Fatmawati Mas Blok I No.106 Lantai 4, Cilandak Barat - Cilandak, Kota Jakarta Selatan, DKI Jakarta |
200 | I0717031 | Muhammad Rifyal Abubakar | Laboratorium Instrumentasi dan Kendali | Jl. Ir. Sutami No. 36A, Kentingan, Kecamatan Jebres, Kota Surakarta 57126 - Jawa Tengah. |
201 | I0718005 | Annisa Larasati Febrianingrum | PLN Unit Pelaksana Pelayanan Pelanggan (UP3) Yogyakarta | Jl. Gedongkuning No.3, Pringgolayan, Banguntapan, Kec. Banguntapan, Bantul, Daerah Istimewa Yogyakarta 55198 |
202 | I0718013 | Hanandya Maya Shafira | PLN Unit Pelaksana Pelayanan Pelanggan (UP3) Yogyakarta | Jl. Gedongkuning No.3, Pringgolayan, Banguntapan, Kec. Banguntapan, Bantul, Daerah Istimewa Yogyakarta 55198 |
203 | I0718030 | Ramadhan Prihantono | PT. Nocola iOT Solution | Jalan Ir. Djuanda no. 117 Sidanegara Cilacap Tengah, Cilacap Jawa Tengah, Indonesia |
204 | I0718004 | Andhika Rizkita Putera | PT. Elektra Mega Mandiri | Jln. Fatmawati Raya Kav. 20. Ruko Fatmawati Mas blok i No. 106. Cilandak. Jakarta Selatan. Jakarta, Indonesia 12430 |
205 | I0717038 | Riski Rama Kusuma | Pusat Pengembangan Bisnis Universitas Sebelas Maret | Jalan Slamet Riyadi No.435, Purwosari, Laweyan, Pajang, Kec. Laweyan, Kota Surakarta, Jawa Tengah 57146 |
206 | I0717027 | Muhammad Al Hamid | Laboratorium Instrumentasi dan kendali Fakultas Teknik UNS | Jl. Ir Sutami No.36A, Kentingan, Kec. Jebres, Kota Surakarta, Jawa Tengah 57126 |
207 | I0717025 | M. Maulana Yusuf | Laboratorium Elektronika Universitas Sebelas Maret | Jl. Ir. Sutami No.36, Kentingan, Kec. Jebres, Kota Surakarta, Jawa Tengah 57126 |
208 | I0717022 | Ivan Robi Septian | Laboratorium Elektronika Teknik Elektro UNS | Jalan Ir. Sutami 36 Kentingan, Jebres, Surakarta, Jawa Tengah, Indonesia 57126 |
209 | I0715027 | Muhammad Wahid Hasyim | Glolingo And Vridom Education Digital Startup | Jl. Candi 2C, No. 555, Karangbesuki, Malang, Jawa Timur |
210 | I0717030 | Muhammad Rifai | Laboratorium Komputer dan Jaringan, Fakultas Teknik UNS | Jalan Ir. Sutami 36 Kentingan, Jebres, Surakarta, Jawa Tengah, Indonesia |
211 | I0717033 | Muhammad Wakhid Wardani | Laboratorium Komputer dan Jaringan, Fakultas Teknik UNS | Jalan Ir. Sutami 36 Kentingan, Jebres, Surakarta, Jawa Tengah, Indonesia |
212 | I0717013 | Bima Damar Jati | Laboratorium Telekomunikasi dan Pengolahan Sinyal Program Studi Teknik Elektro, Fakultas Teknik, Universitas Sebelas Maret | Gedung 3 lt. 2 Fakultas Teknik Universitas Sebelas Maret, Jl. Ir.Sutami No.36A, Jebres, Kec. Jebres, Kota Surakarta, Jawa Tengah 57126 |
213 | I0717035 | Nanda Hafidz Rivanda | Laboratorium Telekomunikasi FT UNS | Jalan Ir.Sutami 36 Kentingan, Jebres, Surakarta, Jawa Tengah, Indonesia 57126 |
214 | I0717021 | Hisbullah Ahmad Fathoni | Laboratorium Telekomunikasi dan Pengolahan Sinyal Program Studi Teknik Elektro Universitas Sebelas Maret | Jl. Ir. Sutami No.36 A, Jebres, Kec. Jebres, Kota Surakarta, Jawa Tengah 57126 |
215 | I0717015 | Fahmi Ismail | Laboratorium Telekomunikasi FT UNS | Jalan Ir. Sutami 36 Kentingan, Jebres, Surakarta, Jawa Tengah, Indonesia 57126 |
216 | I0717024 | M. Iqbal Zidny | Lab. Instrumentasi dan Kendali, FT UNS | Jl. Ir. Sutami No. 36, Surakarta, Jawa Tengah |
217 | I0717016 | Faishal Hanifan Ma`Ruf | Laboratorium Telekomunikasi FT UNS | Jalan Ir. Sutami 36 Kentingan, Jebres, Surakarta, Jawa Tengah, Indonesia 57126 |
218 | I0717005 | Arif Wibowo | Lab. Instrumentasi dan Kendali, FT UNS | Jl. Ir. Sutami 36A, Surakarta, Jawa Tengah |
219 | I0717002 | Agung Budi Utomo | Lab. Instrumentasi dan Kendali, FT UNS | Jalan Ir. Sutami 36 Kentingan, Jebres, Surakarta, Jawa Tengah, Indonesia 57126 |
220 | I0717029 | Muhammad Renaldy Darmawan | Lab. Instrumentasi dan Kendali, FT UNS | Jl. Ir. Sutami 36A, Surakarta, Jawa Tengah |
221 | I0717037 | Rifqi Paradisa | PT. Sarihusada Generasi Mahardika Plant Yogyakarta | Jl. Kusumanegara No.173, Muja Muju, Kec. Umbulharjo, Kota Yogyakarta, Daerah Istimewa Yogyakarta 55165 |
222 | I0717014 | Bintar Yudo Sadewo | PT. INDONESIA POWER- Maintenance Service Unit Semarang | Jl. Ronggowarsito Komplek Pelabuhan Tanjung Emas Semarang 50127, Indonesia |
223 | I0717018 | Hanifah Yulia | PT TRIMITRA CHITRAHASTA | Delta Silicon 2 Industrial Estate Jl. Damar Blok F1 - 06 Lippo Cikarang, Bekasi 17550 Jawa Barat - Indonesia |
224 | I0717012 | Berlianne Shanaza Andriany | PT Hino Motors Manufacturing Indonesia | Kawasan Industri Kota Bukit Indah. Jl. Damar Blok D1 No.1. Purwakarta. 41181. Jawa Barat - Indonesia |
225 | I0717039 | Sony Adyatama | PT. Bakti Nugraha Yuda Energy | Jalan Desa Terusan, Tanjung Kemala, Batu Raja Oku, Sumatera Selatan |
226 | I0717007 | Attar Al Mufashal Rasyid | PT.BAKTI NUGRAHA YUDA ENERGY | Jalan Desa Terusan, Tanjung Kemala, Bati Raja Oku, Sumatera Selatan |
227 | I0717028 | Muhammad Ikyu Arqie Ramadhan | PT Dirgantara Indonesia | Jalan Pajajaran No. 154 Bandung 40174 |
228 | I0717041 | Weldino Panji Kurniadi | B2TKE BPPT | Gd 620 Kawasan PUSPIPTEK, Setu, Tangerang Selatan 15314 |
229 | I0717010 | Banu Maheswara | PT. DIRGANTARA INDONESIA | Jalan Pajajaran No. 154 Bandung 40174 West Java - Indonesia |
230 | I0717023 | Kevin Dwiyanto Saputra | B2TKE BPPT | Gd 620 Kawasan PUSPIPTEK, Setu, Tangerang Selatan 15314 |
231 | I0717011 | Bayhaqi Irfani | Lentera Bumi Nusantara | Jalan Raya Ciheras, Kampung Sindang Asih, RT 02/RW 02, Dusun Lembur Tengah, Desa Ciheras, Cipatujuh, Jawa Barat, Indonesia 46189 |
232 | I0717006 | Athaya Cantia Putri | PT Indonesia Power UP Semarang | Jl. Coaster, Jl. Ronggowarsito Komplek Pelabuhan, Tj. Mas, Kecamatan Semarang Utara, Kota Semarang, Jawa Tengah 50174 |
233 | I0717008 | Aulia Vici Yunitasari | PT Indonesia Power UP Semarang | Jl. Coaster, Jl.Ronggowarsito Komplek Pelabuhan, Tj.Mas, Kec.Semarang Utara, Kota Semarang, Jawa Tengah 50174 |
234 | I0717004 | Alvin Ichwannur Ridho | PT PLN Persero UIW Unit Pelaksana Pengatur Distribusi Kalimantan Barat | Jl. Ismail Marzuki No. 15, Pontianak 78243 |
235 | I0717001 | Aditya Pratama | Lentera Bumi Nusantara | Jl. Raya Ciheras, Kp. Sindang Asih RT. 02/RW. 02 Dusun Lembur Tengah, Desa Ciheras Kec. Cipatujah, Tasikmalaya |
236 | I0717017 | Gilang Satria Ajie | PT Indonesia Power Unit Jasa Pemeliharaan | jl. Aipda KS Tubun no 8, Jakarta Barat |
237 | I0717026 | Mohammad Raihan H. | PT. Dirgantara Indonesia | Jalan Pajajaran No. 154 Bandung 40174 Jawa Barat - Indonesia |
238 | I0715006 | Aris Maulana Fauzan | P.T. Rekaindo Global Jasa | Jl. Candi Sewu No.30, Madiun Lor, Mangu Harjo, Kota Madiun, Jawa Timur |
239 | I0715011 | Febri Abdul Rohman | P.T. Rekaindo Global Jasa | Jl. Candi Sewu No.30, Madiun Lor, Mangu Harjo, Kota Madiun, Jawa Timur |
240 | I0715010 | Faris Izzaturrahman | P.T. Rekaindo Global Jasa | Jl. Candi Sewu No.30, Madiun Lor, Mangu Harjo, Kota Madiun, Jawa Timur 63122 |
241 | I0716017 | I Wayan Yoga K | Airnav Indonesia | Perum LPPNPI Kantor Cabang Surabaya Administration & Operational Building Lantai 2 Bandara Juanda |
242 | I0716016 | Henry Probo Santoso | PT UMG Idealab | Jl. Tangkas Baru No.2, RT.8/RW.2, Karet Semanggi, Setiabudi, Jakarta Selatan, Jakarta 12930 |
243 | I0716015 | Ghufron Husnan | PJB Academy Kampus Cirata | Jl. PLTA Cirata, Cadassari, Tegal Waru, Purwakarta Regency, West Java 41165 |
244 | I0716019 | Krisna Hakim | PT. Pembangkitan Jawa-Bali Unit Pembangkitan Cirata | Desa Cadas Sari, Kecamatan Tegal Waru, Plered Purwakarta 41162 |
245 | I0716026 | Musyaffa' Ahmad | PJB Academy Kampus Cirata | Desa Cerdas Sari, Kecamatan Tegal Waru, Plered Purwakarta 41165 |
246 | I0716009 | Azis Ubaidilah | PT. Pembangkitan Jawa Bali Unit Pembangkitan Cirata | Desa Cadas Sari, Kecamatan Tegal Waru, Plered, Kabupaten Purwakarta, Jawa Barat 41162 |
247 | I0716021 | Mohamad Nisman Falic | PT Indonesia Power Unit Pembangkitan Semarang | Jl. Ronggowarsito, Tj. Mas, Semarang Utara, Kota Semarang, Jawa Tengah 50174 |
248 | I0716027 | Oki Setiawan | PT. Indonesia Power UP Semarang | Jl. Ronggowarsito, Tj. Mas, Semarang Utara, Kota Semarang, Jawa Tengah 50174 |
249 | I0716028 | Rilo Pambudi Aditya Wardani | PT Angkasa Pura II | Bandara Internasional Halim Perdana Kusumah Jl. Protokol Halim Perdanakusuma Jakarta 13610 |
250 | I0716002 | Adrian Seta Ekananda | Airnav Indonesia | Perum LPPNPI Kantor Cabang Surabaya Administration & Operational Building Lantai 2 Bandara Juanda |
251 | I0716030 | Salman Al Farisi | PT PERTAMINA (PERSERO) REFINERY UNIT IV | Jl. MT. Haryono No.77, Rawakeong, Lomanis, Cilacap Tengah, Kabupaten Cilacap, Jawa Tengah 53221 |
252 | I0716004 | Ahmad Imam Rauyani | PT Pertamina (Persero) RU IV Cilacap | Jl. Mt. Haryono No.77, Rawakeong, Lomanis, Cilacap Tengah, Kabupaten Cilacap, Jawa Tengah |
253 | I0716012 | Daniel Aquino Purba | PT. PERTAMINA (Persero) Refinery Unit IV | Jl. Mt. Haryono No.77, Rawakeong, Lomanis, Cilacap Tengah, Kabupaten Cilacap, Jawa Tengah 53221 |
254 | I0716023 | Muhammad Fakhri Erri | PT. Sorik Marapi | Recapital Building, Jalan Adityawarman No.55 Jakarta Selatan, DKI Jakarta 12160 |
255 | I0716018 | Kevin Sebastian | PT. Telkomsel | Jl. Gatot Subroto No.Kav 52, RT.6/RW.1, Kuningan Bar., Mampang Prpt., Kota Jakarta Selatan, Daerah Khusus Ibukota Jakarta 12710 |
256 | I0716001 | Adip Safiudin | PT.Telkomsel | Jl. Gatot Subroto No.Kav. 52, RT.6/RW.1, Kuningan Bar., Mampang Prpt., Kota Jakarta Selatan, Daerah Khusus Ibukota Jakarta 12710 |
257 | I0716034 | Yudhi Prabowo Kusuma | PT Telkomsel | Jl. Gatot Subroto No.Kav. 52, RT.6/RW.1, Kuningan Bar., Mampang Prpt., Kota Jakarta Selatan, Daerah Khusus Ibukota Jakarta 12710 |
258 | I0716020 | Miftahuddin Irfani | PT. TELKOM AKSES SEMARANG | Jl. Singotoro No.20, Semarang, Jawa Tengah, 50256 |
259 | I0716006 | Annisa Hanifa | PT. TELKOM AKSES SEMARANG | Jl. Singotoro No.20, Semarang, Jawa Tengah, 50256 |
260 | I0716032 | Vernanda Sitorini Zul Hizmi | PT. DIRGANTARA INDONESIA | Jl. Pajajaran No. 154 Bandung 40174 |
261 | I0716014 | Fuad Nur Kuncoro | UPT Balai Yasa Yogyakarta PT KAI | Jl. Kusbini No.01, Klitren, Gondokusuman, Kota Yogyakarta, Daerah Istimewa Yogyakarta |
262 | I0716003 | Afif Yuhendrasmiko | PT. PERTAMINA (Persero) Refinery Unit IV | Jl. Mt. Haryono No.77, Rawakeong, Lomanis, Cilacap Tengah, Kabupaten Cilacap, Jawa Tengah 53221 |
263 | I0716033 | Wiwik Nur Winda | PT Pembangkitan Jawa Bali | Jl. PLTGU Muara Tawar No.1, Segaraja, Tarumajaya, Bekasi, Jawa Barat. 17212 |
264 | I0716011 | Bintang Sujatmiko | PT. Pembangkitan Jawa Bali | Jl. PLTGU Muara Tawar No. 1, Segarajaya, Tarumajaya, Bekasi, Jawa Barat |
265 | I0714033 | Zulhendra Hanif | PT Praja Ghupta Utama | Jalan Sultan Iskandar Muda 7 BC Kebayoran Lama, Jakarta Selatan |
266 | I0715013 | Hillga Richman Radhita | PT ASKI | Jl. Raya Mayor Oking Jaya Atmaja, Karang Asem Bar., Citeureup, Bogor, Jawa Barat 16810 |
267 | I0715007 | Arthur Joshua Titus | PT. ASKI | Jl. Raya Mayor Oking KM. 2.2 No. 1, Karang Asem Barat, Citeureup, Bogor, Jawa Barat 16810 |
268 | I0715008 | Cesarius Adi A K | PT ASKI | Jl. Raya Mayor Oking KM. 2.2 No. 1, Karang Asem Barat, Citeureup, Bogor, Jawa Barat 16810 |
269 | I0715040 | Yuana Ayub Sunarya | Badan Tenaga Nuklir Nasional (BATAN) | Jl. Babarsari - Kotak Pos 6101 YKBB, Yogyakarta 55281 |
270 | I0715009 | Dwiki Dimas Shidiq | PT Telkom Witel Yogyakarta | Jl. Yos Sudarso No.9, 001, Kotabaru, Gondokusuman, Kota Yogyakarta, Daerah Istimewa Yogyakarta 55224 |
271 | I0715005 | Arifian Trilaksita | PT PLN (Persero) Transmisi - Jawa Bagian Tengah APP Karawang | Jl. Raya Kosambi-Klari,Pancawati, Karawang, Jawa Barat |
272 | I0715014 | Johan Try Affandy | PT Telkom Witel Yogyakarta | Jl. Yos Sudarso no 9, Kotabaru, Gondokusuman, Yogyakarta 55224 |
273 | I0715032 | Ryoki Martfuadi | PT Telkom Witel Yogyakarta | Jl. Yos Sudarso no 9, 001, Kotabaru, Gondokusuman, Yogyakarta 55224 |
274 | I0715035 | Wahyu Kurniawan | PT. PLN APP Karawang | Jalan Raya Kosambi No.1, Rt.2/Rw.7, Pancawati, Karawang, Kabupaten Karawang, Jawa Barat 41371 |
275 | I0715026 | Muhammad Ramadhan Bagas Purnomo | PT PLN (Persero) Transmisi - Jawa Bagian Tengah APP Karawang | Jl. Raya Kosambi-Klari,Pancawati, Karawang, Jawa Barat |
276 | I0715025 | Muhammad Gunawan | . Indonesia Power Unit Pembangkit Mrica ( UP MRC ) | Jl. Raya Banyumas KM.8 Banjarnegara, Jawa Tengah |
277 | I0715024 | Muhammad Fajar Prakasa | PT INDONESIA POWER Unit Pembagkitan Mrica | Jl. Raya Banyumas KM. 8 Banjarnegara, Jawa Tengah 53471 |
278 | I0715016 | Kharis Akbar Baharizky | PT. Holcim Indonesia Tbk. Plant Cilacap | Jalan Ir. H. Juanda Cilacap, Jawa Tengah |
279 | I0715020 | Lia Anjarwati | PT PLN (PERSERO) APP Cawang | Jalan Cililitan Besar No 1, Cawang, Cililitan, Jakarta Timur 13640 |
280 | I0715037 | Yan Mahardhika Putra Perdana | PT. PLN (PERSERO) AREA MAGELANG | Jl. A. Yani No. 14, Magelang Utara , Magelang, Kota Magelang, Jawa Tengah |
281 | I0714008 | Bina Pangestu Nugroho | PT. Indonesia Power | Jalan Laba Terusan Panimbang Desa Sukamaju Kecamatan Labuan, Kabupaten Pandeglang, Banten |
282 | I0714005 | Anrico Gideon Alfano | PT. Indonesia Power | Jalan Laba Terusan Panimbang Desa Sukamaju Kecamatan Labuan, Kabupaten Pandeglang, Banten |
283 | I0715030 | Ramanda Fadhillah | PT. PLN (Persero) Pusat Sertifikasi | Jalan Laboratorium, Duren Tiga, Pancoran, RT.6/RW.1, Duren Tiga, Pancoran, Kota Jakarta Selatan, Daerah Khusus Ibukota Jakarta 12760 |
284 | I0715001 | Abyan Habibie | PT. Tiga Serangkai Pustaka Mandiri | Jalan Dr. Supomo No. 23 Solo 57141, Surakarta, Jawa Tengah |
285 | I0715015 | Jusuf Abimas Pratama | PT Garuda Maintenance Facility Aero Asia | Soekarno Hatta International Airport Cengkareng - Indonesia, PO. BOX 1303 BUSH 19100 |
286 | I0714004 | Andryawan Jaya Purnama | PT. Indonesia Power Sub Unit PLTA Mrica | Jl. Raya Banyumas KM 8 Banjarnegara 53471 |
287 | I0714034 | Dion Putra Anugrah | PT. INKA (Persero) | Jl Yos Sudarso No. 71 Madiun Jawa Timur – Indonesia |
288 | I0714007 | Bima Tri Prasetya | PT. Purimet Metropolitan | Jl. Majapahit No. 18, 20, 22 Blok A / 116 Kel. Petojo Selatan, Kec. Gambir, Jakarta Pusat |
289 | I0714021 | Muhamad Dzaky Ashidqi | PT. GMF Aeroasia | Bandara Soekarno-Hatta cengkareng, Indonesia |
290 | I0715022 | Muhammad Akmal | PT. PLN Persero Area Jawa Tengah | Jl. Pemuda No.93, Semarang Tengah, Kota Semarang, Jawa Tengah |
291 | I0715018 | Latif Nur Fauzi | PT. PLN Persero Area Jawa Tengah | Jl. Pemuda No.93, Semarang Tengah, Kota Semarang, Jawa Tengah |
292 | I0715002 | Aditya Nur Fauzi G | PT. PLN Persero Area Jawa Tengah | Jl. Pemuda No.93, Semarang Tengah, Kota Semarang, Jawa Tengah |
293 | I0715017 | Kirana Dyah Utari Kusumaputri | PT GS Battery | Kawasan Surya Cipta Swadaya, Jl. Surya Utama Kav. I3 - I4, Karawang Timur, Kutamekar, Ciampel, Kabupaten Karawang, Jawa Barat 41363 |
294 | I0714016 | Fransiskus Xaverius Rian Wicaksono | PT GS Battery | Kawasan Surya Cipta Swadaya, Jl. Surya Utama Kav. I3 - I4, Karawang Timur, Kutamekar, Ciampel, Kabupaten Karawang, Jawa Barat 41363 |
295 | I0715033 | Sifa`Us Wulaning Arsri | PT PLN (Persero) TJBB | Jl. JCC Krukut Limo, Cinere 16514, Jakarta Selatan |
296 | I0715001 | Abyan Habibie | PT PLN (Persero) TJBB | Jl. JCC Krukut Limo, Cinere 16514, Jakarta Selatan |
297 | I0715031 | Ratih Rachmatika | PLN APP KARAWANG | Jl. Raya Kosambi-Klari, Karawang, Jawa Barat |
298 | I0714031 | Rizal Nurhidayat | PT. INDONESlA POWER SUB UNIT PLTA WONOGIRI | Desa Donoharjo, Kec. Wonogiri Kab. Wonogiri, PO Box 5 |
299 | I0715028 | Mustofa Danang Ariyanto | PT Telekomunikasi Selular | Jl. Jend. Gatot Subroto Kav. 52 Jakarta Selatan 12710 |
300 | I0715012 | Ghea Faradiba | PT. Yodya Karya | Jalan Mayjen DI Panjaitan Kav 8 Cipinang Besar Selatan Jatinegara RT/RW 5/11, Jakarta Timur |
301 | I0715034 | Tony Febrianto | PT. Yodya Karya | Jalan Mayjen DI Panjaitan Kav 8 Cipinang Besar Selatan Jatinegara RT/RW 5/11, Jakarta Timur. |
302 | I0715004 | Arif Nuruddin | PLN APP KARAWANG | Jl. Raya Kosambi-Klari, Karawang, Jawa Barat |
303 | I0715029 | Oktavian Listiyanto | PT. Pelayanan Listrik Nasional Batam | Jl. Engku Putri No. 03 Batam Centre |
304 | I0715038 | Yasmine Afifah | PT XL Axiata Tbk. | Graha XL, Jl. Mega Kuningan Lot E4-7 No.1 Kawasan Mega Kuningan, Jakarta 12950, Indonesia |
305 | I0714013 | Fasda Ilhaq Robbani | PT INDONESlA POWER SUB UNIT PLTA WONOGIRI | Desa Donoharjo, Kec. Wonogiri Kab. Wonogiri, PO Box 5 |
306 | I0714020 | M Hakim Adhiguna | PT GMF AeroAsia | Soekarno-Hatta International Airport PO. BOX 1303 Cengkareng - Indonesia |
307 | I0714003 | Aji Fauzan Hidayat | Petrochina International Jabung Ltd. | Menara Kuningan, 25th Floor. Jl. H.R Rasuna Said, Block X7 Kav. 5 Jakarta Indonesia |
308 | I0714015 | Ferdiansyah Ashil Farisi | PT. GMF AeroAsia | Soekarno Hatta International Airport, Cengkareng - Indonesia PO. BOX 1303 |
309 | I0714017 | Igor M. Farhan | PT Dirgantara Indonesia | Jl. Padjajaran no.154 Bandung |
310 | I0715003 | Ahmad Syah Aljabar | PT Premier Oil | Jl. Jendral Sudirman kav. 52-53 Central Jakarta - 12190 |
311 | I0714011 | Edi Nugroho | PT. Indonesia Power UBP Mrica | Jl. Raya Banyumas KM. 8. Kota, Banjarnegara, Jawa Tengah 53471 |
312 | I0714019 | Luthfy Makhmudy | PT PLN TJBB | Jalan Ehave, Gandul, Cinere, Gandul, Cinere, Kota Depok, Jawa Barat 16514 |
313 | I0714006 | Aulia Ardan Sultani | PT. Pertamina Hulu Energi | Jalan TB. Simatupang Kav. 99, Jakarta Selatan 12520 |
314 | I0714032 | Stephanus Hanurjaya | PT. PLN TJBB | Jalan Ehave, Gandul, Cinere, Gandul, Cinere, Kota Depok, Jawa Barat 16514 |
315 | I0714001 | Abid Alim Mustaqim | PT Dirgantara Indonesia | Jalan Padjajaran No.154, Bandung 40174 |
316 | I0714002 | Aditya Meita Nugraha | PT. ABC | Jl.Sudirman no 1 Jakarta |
317 | I0716006 | Annisa Hanifa | STO Solo BAru | - |
Seminar Kerja Praktek
No | Nim | Nama | Judul Seminar | Tanggal Seminar | Ruang | Jam |
---|---|---|---|---|---|---|
1 | I0719059 | Pramesta Tigris | PEMELIHARAAN VACUUM CAST COIL TRANSFORMATOR ECODRY PT. PAKUWON JATI TBK | 28-11-2023 | Ruang Sidang 3204 |
10:00 - 11:00 |
2 | I0720075 | Zahra Fadilla Ekasuci | PERBANDINGAN KECEPATAN KOMUNIKASI SERIAL PADA BMS BATERAI: CAN, UART, SPI, DAN I2C | 21-11-2023 | Ruang Kuliah 3201 |
10:00 - 12:00 |
3 | I0720005 | ARYA ZIFA MUHARMAN | Perancangan Sistem UI/UX Pada Website Battery Management System (BMS) Di RISPRO INKA-UNS PUI-PT. Teknologi Penyimpanan Energi Listrik | 21-11-2023 | Ruang Kuliah 3201 |
10:00 - 10:30 |
4 | I0720031 | ISNANDARU PRASETYO | PROTOTYPE DIGITAL DIAL INDICATOR UNTUK PENGUKURAN SELANG DENGAN MONITORING LOCAL WEB SERVER | 07-11-2023 | Ruang Sidang 3204 |
14:00 - 15:00 |
5 | I0720040 | MUHAMAD SANDYA RAFIYATNA | PENGEMBANGAN SISTEM OTOMATISASI LOADING ORE TAMBANG PADA CHUTE GALLERY 44 MELALUI PENGOLAHAN CITRA PADA TAMBANG BAWAH TANAH GRASBERG BLOCK CAVE PT FREEPORT INDONESIA | 25-10-2023 | Ruang Sidang 3204 |
09:00 - 10:00 |
6 | I0720048 | Muhammad Iksan Bima Aria Pratama | Perancangan Printed Circuit Board (PCB) pada Sistem Proteksi Battery Management System (BMS) Baterai LiFePO4 PUI-PT. Teknologi Penyimpanan Energi Listrik | 12-10-2023 | Ruang Kuliah 3202 |
15:00 - 16:00 |
7 | I0720046 | MUHAMMAD HAMMAM AL-CHOIRI SHOFIYULLOH | Perancangan Sistem Propulsi pada Kereta TMC PPI PT INDUSTRI KERETA API (PERSERO) | 13-09-2023 | Ruang Sidang 3204 |
08:00 - 09:00 |
8 | I0719040 | Mark Reindhard Joyakin Silalahi | Sistem Proteksi Elektrik Pada Unit Auxiliary Transformer di PT Indonesia Power PLTU Pangkalan Susu OMU | 07-07-2023 | Ruang Kuliah 3201 |
13:00 - 13:30 |
9 | I0720061 | RAKHLI DIAN PRAMUDYO | PENGGUNAAN SOFT STARTER PADA PANEL MCC MOTOR INDUKSI 3 FASA 330 KW DI WELLPAD 28 PT. GEO DIPA ENERGI UNIT DIENG | 29-05-2023 | Ruang Kuliah 3201 |
15:30 - 16:30 |
10 | I0720056 | Omar Bismantaka | PEMBUATAN DAN PERANCANGAN SISTEM PENGAJUAN CUTI ONLINE PADA PT BAKOEL NUSANTARA BERBASIS WEBSITE | 23-05-2023 | Ruang Kuliah 3202 |
13:00 - 14:00 |
11 | I0719068 | Serafim Lemuel Riwibowo | PEMBUATAN PROGRAM PRINT-OUT INVOICE PADA APLIKASI QR CODE PT DUNIATEX BERBASIS JAVA | 17-05-2023 | Ruang Kuliah 3201 |
13:00 - 14:00 |
12 | I0720068 | SETYA ACHMAD YANUAR PAMUNGKAS | HAMMER MILL PROCESS ON FEEDMILL UNIT BASED ON HMI SCADA PT CHAROEN POKPHAND INDONESIA | 16-05-2023 | Ruang Kuliah 3202 |
13:00 - 14:00 |
13 | I0720078 | ALKA ADI NUGROHO | ANALISIS PENGUJIAN KAPASITAS BATERAI 110 VOLT DC UNIT 2 PADA PEMELIHARAAN RUTIN 2 TAHUNAN GARDU INDUK 150kV WONOGIRI | 16-05-2023 | Ruang Kuliah 3202 |
13:00 - 14:00 |
14 | I0720070 | Theodore Aditya Putranto | PEMBUATAN SISTEM INFORMASI PENCATATAN BEBAN TRAFO BERBASIS WEB DI PT PLN (PERSERO) ULP KLATEN KOTA | 15-05-2023 | Ruang Kuliah 3202 |
11:00 - 12:00 |
15 | I0720012 | Bagus Putra Nugraha | SISTEM INFORMASI DAN PENYIARAN RADIO DI LEMBAGA PENYIARAN PUBLIK LOKAL (LPPL) RADIO GIRI SWARA KABUPATEN WONOGIRI | 10-05-2023 | Ruang Kuliah 3202 |
10:00 - 11:00 |
16 | I0720076 | Ahmad Syahrul Hasan | PERANCANGAN SISTEM HIDROLIK UNTUK PRODUKSI KERTAS PADA MESIN INDUSTRI DI PABRIK KERTAS PT. SETIA KAWAN | 10-05-2023 | Ruang Kuliah 3202 |
07:30 - 08:30 |
17 | I0720072 | UMAR AHZAMY ASHHABUL KAHFI | PENGGUNAAN SWITCHING DALAM PEMULIHAN DAN PERBAIKAN GANGGUAN JARINGAN DISTRIBUSI PENYULANG MOJO-5 | 10-05-2023 | Ruang Kuliah 3202 |
10:30 - 11:30 |
18 | I0720058 | RAFAEL BADRAYOGA PINARINGAN | Analisis Pengaruh Faktor Daya Pelanggan terhadap Jaringan Listrik PLN | 09-05-2023 | Ruang Kuliah 3201 |
13:00 - 14:00 |
19 | I0720018 | DHEANERA FAIRUZ HASNA | PERBAIKAN ANOMALI DAN UJI KELAYAKAN PEMUTUS TENAGA (PMT) ABB LTB 170 DI GARDU INDUK 15kV PURWOREJO | 09-05-2023 | Ruang Kuliah 3201 |
13:00 - 14:00 |
20 | I0720028 | ILYAS ABDUL JALIL | Analisis Pengaruh Arus Eksitasi Terhadap Daya Reaktif dan Output Tegangan Generator Sinkron di PLTU Cilacap Unit 3 (1 x 660 MW) | 09-05-2023 | Ruang Kuliah 3201 |
13:00 - 14:00 |
21 | I0720037 | Mario Alfandi Wirawan | PERANCANGAN PROGRAM UNTUK MENDETEKSI GARIS JALAN (LANE DETECTOR) MENGGUNAKAN PEMROSESAN GAMBAR DENGAN OPENCV DI PT. INDONESIA SATU TUJUH | 09-05-2023 | Ruang Kuliah 3202 |
13:00 - 14:00 |
22 | I0720065 | RIDHO PRIAMBODO | OPTIMALISASI WEBSITE LNK.ID UNTUK MENINGKATKAN KECEPATAN RESPONSE TIME MENGGUNAKAN DATABASE MONGODB DI PT. INDONESIA SATU TUJUH | 09-05-2023 | Ruang Kuliah 3202 |
09:00 - 10:00 |
23 | I0720055 | NOFA ARSYADANA SYAUQUS SYAHID | PEMBUATAN SISTEM INFORMASI PENYEDIA LAYANAN JASA TUKANG BERBASIS WEBSITE DENGAN PAYMENT GATEWAY MIDTRANS PADA PT. BAKOEL NUSANTARA | 09-05-2023 | Ruang Kuliah 3202 |
10:00 - 11:00 |
24 | I0720035 | Mahendra Adi Nugroho | PENGARUH PEMBEBANAN TERHADAP EFISIENSI MAIN TRANSFORMATOR PADA PLTU CILACAP UNIT 3A 1x1000 MW PT SUMBER SEGARA PRIMADAYA | 09-05-2023 | Ruang Kuliah 3202 |
11:00 - 11:30 |
25 | I0720015 | BINTANG RAMADHAN | ANALISIS TEKNIK PENYEIMBANGAN SEL BATERAI KENDARAAN LISTRIK E-INOBUS | 09-05-2023 | Ruang Kuliah 3202 |
11:00 - 11:30 |
26 | I0720063 | Raymond Subianto | IMPLEMENTASI SISTEM PENCATATAN SWITCHING JARINGAN TEGANGAN MENENGAH DAN PELAYANAN PELANGGAN BERBASIS WEB | 09-05-2023 | Ruang Kuliah 3202 |
11:00 - 12:00 |
27 | I0720003 | Anna Mayyah Soraya | Implementasi Aplikasi KCT Mobile sebagai Salah Satu Media Pelaksanaan Key Change Token pada Meter Prabayar di PLN UP3 Gresik Rayon Giri | 09-05-2023 | Ruang Kuliah 3202 |
11:00 - 12:00 |
28 | I0720077 | Ahmad Yudistira | WORKING MECHANISM OF FEEDMILL PRODUCTION MENGGUNAKAN HMI SCADA PADA PELLET MILL MACHINE DI PT CHAROEN POKPHAND INDONESIA | 09-05-2023 | Ruang Kuliah 3202 |
13:00 - 13:30 |
29 | I0720057 | PRIASTOMO INDRA BULAN | PERANCANGAN SISTEM MONITORING TEMPRATURE, PRESSURE DAN LEVEL MENGGUNAKAN DISTRIBUTED CONTROL SYSTEM PADA SEPARATOR DI KILANG PPSDM MIGAS CEPU | 09-05-2023 | Ruang Kuliah 3202 |
13:00 - 14:00 |
30 | I0720047 | Muhammad Hernawan Choiri | MIXING PROCESS PADA PEMBUATAN PELLET BERBASIS HMI SCADA DI PT CHAROEN POKPHAND INDONESIA | 09-05-2023 | Ruang Kuliah 3202 |
13:00 - 15:00 |
31 | I0720039 | Muhamad Isya Rizky Fauzan | ANALISIS ARUS BOCOR PADA LIGHTING ARRESTER BAY PURBALINGGA I GARDU INDUK 150KV RAWALO | 05-05-2023 | Ruang Kuliah 3202 |
10:00 - 11:00 |
32 | I0720002 | ANAS HIBATULLAH DJOKO SUSILO | PEMODELAN SISTEM KERETA API DAN PENGAPLIKASIAN PADA FRAMEWORK WINDOWS FORM UNTUK PERANCANGAN DAN PEMBUATAN RUNNING SIMULATION KERETA API | 02-05-2023 | Ruang Kuliah 3202 |
09:00 - 10:00 |
33 | I0720052 | NAFA ZUYYINALIA | PERANCANGAN SISTEM INFORMASI PEMESANAN JASA TUKANG BANGUNAN (TOEKANG) DENGAN FRAMEWORK LARAVEL BERBASIS WEBSITE DI PT.BAKOEL NUSANTARA | 02-05-2023 | Ruang Kuliah 3202 |
09:00 - 10:00 |
34 | I0720032 | IVAN DERRY | PEMELIHARAAN BATERAI SEBAGAI SUMBER ARUS DC PADA GARDU INDUK 150KV RAWALO | 02-05-2023 | Ruang Kuliah 3202 |
09:00 - 09:30 |
35 | I0720053 | Najya Anastasya | PENERAPAN REAL-TIME STREAMING PROTOCOL (RTSP) DAN VISUALISASI DATA PADA SISTEM MONITORING CCTV DI PT. SOLUSI BANGUN INDONESIA | 13-04-2023 | Ruang Kuliah 3201 |
15:00 - 16:00 |
36 | I0720013 | BAHARUDDIN DIAS SAPUTRA | PENGGUNAAN DAN KONFIGURASI CENTOS 7 SEBAGAI STAGING ENVIRONMENT APLIKASI WEB LNK-ID | 13-04-2023 | Ruang Kuliah 3201 |
15:00 - 15:30 |
37 | I0720033 | Jesslyn Zaneta | ANALISIS PEMELIHARAAN KUBIKEL 20kV DI PT PLN (PERSERO) ULP RAYON GIRI GRESIK UID JAWA TIMUR | 13-04-2023 | Ruang Kuliah 3201 |
15:00 - 16:00 |
38 | I0720020 | Enggar Nurcahyo | IMPLEMENTASI VISUALISASI DATA BERBASIS WEBSITE UNTUK MEMONITOR BRICK CONDITION PADA PT SOLUSI BANGUN INDONESIA | 13-04-2023 | Ruang Kuliah 6407 |
10:00 - 12:00 |
39 | I0720060 | RAGATA IZZAN SHAFA | IMPLEMENTASI PENGGUNAAN PLC PADA MESIN INDUSTRIAL DI PABRIK KERTAS SETIA KAWAN | 13-04-2023 | Ruang Kuliah 6407 |
11:30 - 12:00 |
40 | I0720080 | HASYIM IZZAN GHAUS | STUDI PERBANDINGAN KARAKTERISTIK MOTOR INDUKSI 3 FASA PADA BOILER FEED PUMP KAPASITAS 950 kW DENGAN MENGGUNAKAN DYNAMIC MOTOR ANALYZER | 13-04-2023 | Ruang Kuliah 6407 |
10:30 - 12:00 |
41 | I0720010 | Azalia Ananta Firdaus | PERBANDINGAN NILAI KAPASITANSI DAN INDUKTANSI FILTER PADA THREE LEVEL INVERTER (SIV) SISTEM PROPULSI KERETA API PT INKA | 13-04-2023 | Ruang Kuliah 6407 |
10:00 - 12:00 |
42 | I0720030 | IRFAN MAHARDIKA | ANALISIS HOT POINT DENGAN UJI THERMOVISI PADA BAY PLTU I GARDU INDUK 150KV RAWALO | 13-04-2023 | Ruang Kuliah 6407 |
12:00 - 12:30 |
43 | I0720062 | Raoul Kennan | STUDI KASUS BATERAI UNBALANCE PADA KENDARAAN LISTRIK RODA 2 DI PT. EKOLEKTRIK KONVERSI MANDIRI | 12-04-2023 | Ruang Kuliah 3201 |
11:00 - 12:00 |
44 | I0720022 | FELIA DINA ANGGRAINI | RANCANG BANGUN DEFOAMER CONTROL WITH SOLENOID VALVE UNTUK PABRIK KENTANG BERBASIS PLC DI PT GALANUSA TEKNIK KREASITAMA | 12-04-2023 | Ruang Kuliah 3201 |
11:00 - 12:00 |
45 | I0720027 | ILHAM ARISWANTO | ANALISIS HASIL TAHANAN PENTANAHAN MENARA TRANSMISI 150KV JALUR RAWALO – PURBALINGGA DI GI RAWALO | 12-04-2023 | Ruang Kuliah 3202 |
10:00 - 12:00 |
46 | I0720007 | AULIA RAHMAT TSANI WIBISONO | PERANCANGAN SISTEM PERINGATAN DAN SISTEM MONITORING KWH METER SUHU DAN KELEMBAPAN DI LABORATORIUM DEVICE PT TELKOM INDONESIA | 12-04-2023 | Ruang Kuliah 3202 |
10:00 - 12:00 |
47 | I0720001 | Adhitya Fajar Rachmadi | PERANCANGAN SISTEM KONTROL DAN MONITORING SUHU, TEKANAN, LEVEL AIR DENGAN KENDALI DISTRIBUTED CONTROL SYSTEM CENTUM VP YOKOGAWA PADA UNIT BOILER PPSDM MIGAS CEPU | 12-04-2023 | Ruang Kuliah 3202 |
09:00 - 10:00 |
48 | I0720051 | Muhammad Yusuf Za`imal Khunafai | PEMASANGAN ABSW (AIR BREAK SWITCH) PADA JARINGAN TEGANGAN MENENGAH PT. PLN (PERSERO) UP3 SURAKARTA | 12-04-2023 | Ruang Kuliah 3202 |
09:00 - 10:00 |
49 | I0720017 | DEWANGGA SURYA HERAWAN | Alih Fungsi Radio Onboard Collins VHF 20B Transceiver Pesawat Soko Galeb Sebagai Radio Onground Flight Test | 12-04-2023 | Ruang Kuliah 3202 |
10:00 - 12:00 |
50 | I0720009 | AYATULLAH SHIDDIQ | Studi Sistem Kerja Pada Proses Monitoring Sumur Minyak Bumi Dengan Menggunakan Rod Pump Optimization Controller (RPOC) Pada PT. Wira Insani (Weatherford) | 11-04-2023 | Ruang Kuliah 3202 |
10:00 - 12:00 |
51 | I0720019 | Dian Eka Febriyanti Adz Zahra | IMPLEMENTASI SISTEM APLIKASI CATAT METER TERPUSAT (ACMT) DI PT PLN (PERSERO) UP3 GRESIK ULP GIRI | 11-04-2023 | Ruang Kuliah 3202 |
10:00 - 13:00 |
52 | I0720014 | Bima Ekanto Putra | STUDI PENGGUNAAN UNIT INDICON HYDROSULPHITE CONTROL UNTUK PEWARNA BENANG JEANS DI PT GALANUSA TEKNIK KREASITAMA | 11-04-2023 | Ruang Kuliah 3202 |
15:00 - 16:00 |
53 | I0720036 | MAHESWARA KUMARAFAZA | STUDI PERBANDINGAN KARAKTERISTIK MOTOR INDUKSI 3 FASA CONDENSATE PUMP 235 kW MENGGUNAKAN DYNAMIC MOTOR ANALYZER PADA PT PLN NUSANTARA POWER UP GRESIK | 11-04-2023 | Ruang Kuliah 3202 |
12:30 - 14:30 |
54 | I0720024 | FIKRI SAEFUDIN | ANALISIS PERMASALAHAN MOTOR PENGGERAK PADA PEMELIHARAAN 2 TAHUNAN PMS BUS 1 BAY TRAFO 3 GARDU INDUK 150 KV PALUR | 11-04-2023 | Ruang Kuliah 3202 |
15:00 - 16:00 |
55 | I0720066 | RYAN RAMADHANA | CASCADE CONTROL PRESSURE-TEMPERATURE MENGGUNAKAN DISTRIBUTED CONTROL SYSTEM BERBASIS DCS YOKOGAWA CENTUM VP PADA FURNACE KILANG MINYAK DI PPSDM MIGAS CEPU | 11-04-2023 | Ruang Kuliah 3202 |
12:30 - 14:30 |
56 | I0720079 | AMMAR 'ALIM MUSTOFA | ANALISA DATA UJI COBA GROUND TEST SENSOR PENDETEKSI SIKAP DAN POSISI PESAWAT YANG DITAMPILKAN PADA PRIMARY FLIGHT DISPLAY PESAWAT CN-235 | 11-04-2023 | Ruang Kuliah 3202 |
10:00 - 12:00 |
57 | I0720049 | Muhammad Nur Hidayat | ANALISA TAHANAN ISOLASI MINYAK TRANSFORMATOR DENGAN UJI BREAKDOWN VOLTAGE DI PT SUMBER SEGARA PRIMADAYA - PLTU CILACAP UNIT 3A (1x1000MW) | 11-04-2023 | Ruang Kuliah 3202 |
10:00 - 12:00 |
58 | I0720045 | MUHAMMAD GUNTUR ALAMSYAH | ANALISIS PENGARUH CUACA TERHADAP KINERJA PLTS ATAP ON GRID 20 KWP DI GEDUNG LABORATORIUM DASAR PPSDM MIGAS CEPU | 06-04-2023 | Ruang Kuliah 3201 |
12:00 - 13:30 |
59 | I0720026 | Hendrawan Purnomoaji | Perancangan Alat Monitoring Kondisi Ruangan sebagai Proteksi Alat-alat Pengujian di Laboratorium PT. Telkom Indonesia | 06-04-2023 | Ruang Kuliah 3201 |
12:00 - 13:30 |
60 | I0720023 | Ferry Indrawan | SISTEM OTOMASI UNIT INDICON FEEDING CONTROL BERBASIS PROGRAMMABLE LOGIC CONTROL PT. GALANUSA TEKNIK KREASITAMA | 31-03-2023 | Ruang Kuliah 3201 |
13:00 - 14:00 |
61 | I0720073 | Yesreel Andre Barasa | STANDAR SISTEM PARKING DAN PENGATURAN CONTROLLER PADA KENDARAAN LISTRIK KONVERSI RODA DUA DI PT. EKOLEKTRIK KONVERSI MANDIRI | 31-03-2023 | Ruang Kuliah 3201 |
13:00 - 14:00 |
62 | I0720038 | MUHAMAD FAIZ ADZKIA | STUDI PERBANDINGAN NILAI TAHANAN ISOLASI HIGH VOLTAGE CIRCUIT BREAKER (HVCB) PLTU/G DI PT PLN NUSANTARA POWER UP GRESIK | 31-03-2023 | Ruang Kuliah 3202 |
09:00 - 10:00 |
63 | I0720041 | Muhammad Affan Hibatullah Harsito | ANALISIS HASIL UJI PEMELIHARAAN RUTIN 2 TAHUNAN (SHUTDOWN MEASUREMENT) PADA PEMISAH (PMS) BUS 2 BAY BANYUDONO 2 GARDU INDUK 150KV JAJAR | 29-03-2023 | Ruang Kuliah 3202 |
09:00 - 10:30 |
64 | I0720011 | Bagas Setiawan | Studi Sistem Pendinginan Pack Baterai 15 Kwh Dengan Aktif Cooling PUI – PT Teknologi Penyimpanan Energi Listrik | 29-03-2023 | Ruang Kuliah 3202 |
09:00 - 10:30 |
65 | I0720029 | Immanuel Satrio Putro Sulistyoaji | Analisis Pengujian Tahanan Isolasi dan Arus Bocor SVL (Surge Voltage Lightning) pada Pemeliharaan 2 Tahunan SKTT Jajar – Mangkunegaran 1 | 28-03-2023 | Ruang Kuliah 3202 |
12:30 - 13:30 |
66 | I0720044 | Muhammad Fiqih Al Faishal | EFISIENSI PENGGUNAAN VARIABLE SPEED DRIVE (VSD) PADA POMPA DISTRIBUSI DI WATER TREATMENT PLANT PPSDM MIGAS CEPU | 21-03-2023 | Ruang Kuliah 3202 |
13:15 - 14:00 |
67 | I0720034 | Kaleb Nathan Zebua | PERANCANGAN DAN PENGOPERASIAN PANEL KONTROL CAPSTAN PADA KAPAL LAUT DI DEPARTEMEN PPDB DIVISI INFRASTRUKTUR PERHUBUNGAN PT PINDAD (PERSERO) | 21-03-2023 | Ruang Kuliah 3202 |
12:30 - 13:15 |
68 | I0720006 | Asri Aziziyah | ANALISIS REDAMAN, DAYA, DAN PERBAIKAN GANGGUAN JARINGAN KABEL SERAT OPTIK BATIK NET DI JALUR KELURAHAN KLEGO KOTA PEKALONGAN | 17-03-2023 | Ruang 6408_ Laboratorium Komputer |
13:00 - 14:00 |
69 | I0720064 | REVA SETIABUDI | EKSPANSI RANGE FREKUENSI TRANSMIT DAN RECEIVE PADA RADIO ICOM IC-9100 | 10-03-2023 | Ruang 6408_ Laboratorium Komputer |
10:00 - 10:30 |
70 | I0719065 | Ricky Aston Susetyo | Pembuatan dan Penerapan Fitur Pencarian Informasi Farmasi dan Implementasi Front-End Aplikasi Farmasi Medminutes | 08-03-2023 | Ruang Kuliah 3202 |
08:00 - 09:00 |
71 | I0718033 | Roni Tamado | ANALISA GANGGUAN PADA KABEL FIBER OPTIK DALAM SISTEM JARINGAN TELEKOMUNIKASI FIBER OPTIK | 31-01-2023 | Ruang Kuliah 3202 |
10:00 - 12:00 |
72 | I0719032 | Hayyan Yusuf | PENGEMBANGAN APLIKASI DIGITAL PENGUKURAN KONSENTRASI AUTISM CHILD | 27-01-2023 | Ruang Kuliah 3201 |
10:00 - 11:00 |
73 | I0719019 | Daffa Aminuddin | Rancang Bangun Sistem Monitoring Layanan Internet dengan IOT dan Mini Server | 15-12-2022 | Ruang Kuliah 3201 |
11:00 - 12:00 |
74 | I0719071 | Talib Sahdha Wibowo | PERANCANGAN SISTEM VOIP (VOICE OVER IP) DENGAN OPENSOURCE ASTERISK MENGGUNAKAN SERVER PBX VIA JARINGAN LAN (LOCAL AREA NETWORK) UNTUK KOMUNIKASI | 09-12-2022 | Ruang Kuliah 3201 |
09:00 - 11:00 |
75 | I0719015 | As'ad Syahrul Munir | Perancangan Jaringan VPN mikrotik untuk remote access dengan metode Layer 2 Tunnel Protocol di PT Texcoms WORLDWIDE | 09-12-2022 | Ruang Kuliah 3201 |
09:00 - 11:00 |
76 | I0719051 | Muhammad Rifqi Bachtiar | ANALISIS GAS TERLARUT PADA MINYAK ISOLASI AUXIALLIARY TRANSFORMATOR DI PT PERTAMINA GEOTHERMAL ENERGY AREA KARAHA | 01-12-2022 | Lab. Elektro |
10:00 - 11:30 |
77 | I0719006 | Aji Ghanang Amurwabhumi | PERANCANGAN, INSTALASI, MONITORING, DAN ANALISIS SISTEM PLTS PADA PT. HIJAU MAKMUR ENERGI | 30-11-2022 | Lab. Elektro |
13:00 - 14:00 |
78 | I0716029 | Royani Aulia Ihsanti | Rancang Bangun Lampu Lalu Lintas Dengan Sensor Inframerah | 14-11-2022 | Lab. Elektro |
13:00 - 15:00 |
79 | I0719076 | Zulfikar Juan Pramasta | Analisis Pengaruh Variasi Material Permanent Magnet terhadap Back EMF dan Cogging pada PMSG 12 Slot 4 Pole dengan Metode Finite Element Method | 28-10-2022 | Ruang Kuliah 3202 |
16:00 - 16:50 |
80 | I0719058 | Oemar Dhani Er | SISTEM OTOMASI DAN PLC PADA PROSES BAGGING (BAG AUTOMATION BVG600) UNIT PCR2 PT POLYTAMA PROPINDO | 19-10-2022 | Lab. Elektro |
13:00 - 15:00 |
81 | I0719034 | Ibnu Qoyim Al-Hafidzh | PEMODELAN PERMANENT MAGNET SYNCHRONOUS GENERATOR 12 SLOT 8 POLE MENGGUNAKAN METODE SCRIPTING UNTUK MELIHAT EFISIENSI YANG DIHASILKAN | 19-10-2022 | Lab. Elektro |
15:00 - 16:00 |
82 | I0719017 | Azis Surya Ananda | ANALISIS GAS TERLARUT DAN TEGANGAN BREAKDOWN PADA MINYAK TRANSFORMATORDI PT PERTAMINA GEOTHERMAL ENERGY AREA KARAHA | 18-10-2022 | Lab. Elektro |
13:00 - 14:30 |
83 | I0719037 | Kresna Pandu Pratama | DESAIN DAN PROYEKSI FINANSIAL PEMBANGKIT LISTRIK TENAGA SURYA ON GRID 119.5 KWP DI HOTEL SENDANG SARI | 14-10-2022 | Ruang 6408_ Laboratorium Komputer |
10:00 - 12:00 |
84 | I0719038 | Luqman Hadi Dwi Satryo | ANALISIS GENSET 250 KVA DAN PENGUJIAN SENSOR FLOW METER GUNA RANCANG BANGUN MONITORING BAHAN BAKAR GENSET DI PT PELABUHAN INDONESIA (PERSERO) REGIONAL 2 PANJANG | 04-10-2022 | Lab. Elektro |
09:00 - 10:00 |
85 | I0717031 | Muhammad Rifyal Abubakar | PERANCANGAN SISTEM MONITORING DAYA BATERAI SEPEDA LISTRIK BERBASIS IOT | 30-09-2022 | Ruang Kuliah 3202 |
08:30 - 10:00 |
86 | 12345678 | palerian | asdff | 15-09-2022 | Ruang 6408_ Laboratorium Komputer |
12:00 - 14:00 |
87 | I0719033 | Hilwan Hafidzsyah | PERANCANGAN CONTROLLER ELECTRIC VEHICLE (EV) CHARGER DALAM REKAYASA DAN PEMBUATAN BIS LISTRIK MERAH PUTIH (BLMP) | 07-09-2022 | Ruang 6408_ Laboratorium Komputer |
08:00 - 10:00 |
88 | I0717027 | Muhammad Al Hamid | PERANCANGAN DAN SIMULASI SISTEM KENDALI MOTOR DC ENCODER BERBASIS PID DENGAN METODE HARDWARE IN THE LOOP | 07-09-2022 | Lab. Elektro |
14:00 - 15:00 |
89 | I0718027 | Nur Udin Galang Ga | ANALISA SETTING RELE DIFFERENSIAL UNTUK PROTEKSI PADA GENERATOR PLTU SURALAYA PGU UNIT I - IV | 06-09-2022 | Lab. Elektro |
07:30 - 09:30 |
90 | I0718024 | Muhammad Ibnu Sina Abbas Parlin | ANALISA EFISIENSI DI PLTU UNIT 2 SURALAYA DENGAN DISTRIBUSI DAYA THERMAL BERDAYA 400 MW | 02-08-2022 | Ruang Webinar 1 (s.id/teuns01) |
07:30 - 08:30 |
91 | I0719053 | Muhammad Wildan Alfatih | PCBA MANUFACTURING PROCESS PT FORMULATRIX INDONESIA | 01-08-2022 | Ruang Kuliah 3201 |
10:00 - 12:00 |
92 | I0718029 | Raihan Rafif Kautsar Priyanto | SISTEM OPERASI DAN KEHANDALAN LISTRIK PADA INTERKONEKSI PABRIK DI PT.PETROKIMIA GRESIK | 29-07-2022 | Ruang Webinar 1 (s.id/teuns01) |
10:00 - 11:00 |
93 | I0718022 | Muhammad Didin Kamaludin | Pengaruh Variasi Cekungan Magnet pada Permanent Magnet Synchronous Generator (Pmsg) Terhadap Nilai Back Emf Dan KE Yang Dihasilkan Berbasis Finite Element Method (Fem) di Lentera Bumi Nusantara | 26-07-2022 | Ruang Webinar 1 (s.id/teuns01) |
13:00 - 14:00 |
94 | I0718037 | Taufik Widyastama | ANALISIS SISTEM KENDALI PADA PROSES OPERASI KOLOM EVAPORATOR V-1 DI KILANG PPSDM MIGAS CEPU | 26-07-2022 | Ruang Webinar 1 (s.id/teuns01) |
14:00 - 15:00 |
95 | I0718017 | Khilalul Hanif | PENGARUH VARIASI LEBAR UMBRELLA TERHADAP NILAI BACK-EMF DAN KE PADA PEMODELAN PMSG 12S10P MENGGUNAKAN SOFTWARE DESIGN ELECROMAGNETIC BERBASIS FINITE ELEMENT METHOD (FEM) DI LENTERA BUMI NUSANTARA | 21-07-2022 | Ruang Webinar 1 (s.id/teuns01) |
19:00 - 20:30 |
96 | I0718006 | Catya Afif Kasudya | ANALISIS GANGGUAN PADA KABEL DROP CORE G-657 SEBAGAI TRANSPORT INTERNET DALAM SISTEM JARINGAN TELEKOMUNIKASI FIBER OPTIK DI PT. TELEKOMUNIKASI INDONESIA WITEL PURWOKERTO | 21-07-2022 | Ruang Webinar 6 (s.id/teuns06) |
13:00 - 14:30 |
97 | I0719001 | 'Izzuddin 'Ulwan | SISTEM KENDALI OTOMASI PADA UNIT GAS CONDITIONING TOWER (GCT) DI PT. SOLUSI BANGUN INDONESIA, TBK-CILACAP PLANT | 20-07-2022 | Ruang Webinar 1 (s.id/teuns01) |
19:00 - 20:00 |
98 | I0718030 | Ramadhan Prihantono | analisa perbandingan provider pada system koneksi GSM menggunakan modul GSM SIM800L berbasis MQTT | 19-07-2022 | Ruang Webinar 6 (s.id/teuns06) |
13:00 - 14:15 |
99 | I0718035 | Syaifullah Filard L | PERANCANGAN SISTEM KOMUNIKASI DAN KONTROL PADA ROBOT ASISTEN KESEHATAN COVID-19 | 18-07-2022 | Ruang Webinar 3 (s.id/teuns03) |
14:00 - 15:20 |
100 | I0718003 | Alvian Aji Pangestu | PENGARUH KONFIGURASI WINDING TERHADAP DAYA KELUARAN DAN EFISIENSI PADA PMSG (PERMANENT MAGNET SYNCHRONOUS GENERATOR) 18 SLOT 8 POLE DI LENTERA BUMI NUSANTARA | 14-07-2022 | Ruang Webinar 1 (s.id/teuns01) |
19:00 - 20:00 |
101 | I0718031 | Rizal Mujaddid Irsyad | ANALISA PENGARUH VARIASI UMBRELLA DAN LEBAR TEETH PADA PMSG (PERMANENT MAGNET SYNCHRONOUS GENERATOR) 12 SLOT 8 POLE TERHADAP DAYA KELUARAN DENGAN PEMBEBANAN 100 OHM | 14-07-2022 | Ruang Webinar 6 (s.id/teuns06) |
19:00 - 20:30 |
102 | I0719072 | Wahono Aji Warjono | RANCANGAN PROTOKOL KOMUNIKASI CAN PADA BMS (BATTERY MANAGEMENT SYSTEM) RISPRO INKA PUI-PT. Teknologi Penyimpanan Energi Listrik UNS | 13-07-2022 | Ruang Webinar 6 (s.id/teuns06) |
16:00 - 17:00 |
103 | I0719043 | Muchsin Ismail | Pengembangan Pembangkit Listrik Tenaga Surya Off-Grid Kapasitas 60 Wp Sebagai Penunjang Daya Hidroponik Berbasis IoT | 12-07-2022 | Ruang Kuliah 3201 |
13:00 - 14:00 |
104 | I0719007 | Akbar Dharmawan | INDICON HYDROSULPHITE CONTROL UNTUK PEWARNA BAHAN JEANS DI PT. GALANUSA TEKNIK KREASITAMA | 08-07-2022 | Ruang Webinar 1 (s.id/teuns01) |
10:00 - 11:00 |
105 | I0719062 | Rafi Panhardyansyah Dananjaya | STEAM SISTEM PADA UNIT STEAM TURBINE GENERATOR DI DEPARTEMEN PEMELIHARAAN III PT. PETROKIMIA GRESIK | 07-07-2022 | Ruang Webinar 5 (s.id/teuns05) |
10:00 - 11:00 |
106 | I0719014 | Arif | WASTE WATER TREATMENT PROCESS DI DEPARTEMEN PEMELIHARAAN III PT. PETROKIMIA GRESIK | 07-07-2022 | Ruang Webinar 5 (s.id/teuns05) |
09:00 - 10:00 |
107 | I0719016 | Attala Surya Prima Amanda | IMPLEMENTASI SISTEM INFORMASI KP-TA PADA PRODI PERENCANAAN WILAYAH DAN KOTA FAKULTAS TEKNIK UNIVERSITAS SEBELAS MARET | 05-07-2022 | Ruang Kuliah 3201 |
10:00 - 11:00 |
108 | I0719048 | Muhammad Haris Humaidi | IMPLEMENTASI SISTEM INFORMASI REKOGNISI PEMBELAJARAN LAMPAU (RPL) DI PRODI PENDIDIKAN PROFESI INSINYUR FAKULTAS TEKNIK UNS | 05-07-2022 | Ruang Kuliah 3201 |
11:00 - 12:00 |
109 | I0719055 | Mukhlis Dwi Nugroho | Aplikasi MyoWare Sensor dan Pengembangan Ssistem Website Monitoring pda Proyek Robot Effleurage | 04-07-2022 | Daring |
14:30 - 15:30 |
110 | I0719047 | Muhammad Fikri Arifudin | SISTEM KONTROL DAN OTOMASI PADA MESIN FEEDING CONTROL PT. GALANUSA TEKNIK KREASITAMA | 04-07-2022 | Daring |
13:30 - 14:30 |
111 | I0719026 | Fiqi Haiqal | LUBE OIL SYSTEM DI UNIT STEAM TURBINE GENERATOR 17,5 MW DENGAN PLC DI PT PETROKIMIA GRESIK | 04-07-2022 | Daring |
18:15 - 19:30 |
112 | I0719008 | Aldin Wildan Razaqa | Perancangan Effleurage Robot : Inovasi Pengurang Nyeri Kontraksi Persalinan Berbasis Iot Di Laboraturium Komputer Dan Jaringan Universitas Negeri Sebelas Maret | 15-06-2022 | Ruang Kuliah 3201 |
12:30 - 13:30 |
113 | I0719045 | Muhammad Ariz Fakhruddin | Sistem Komunikasi PLC Berbasis TCP/IP Menggunakan Virtual Private Network (VPN) | 14-06-2022 | Daring |
06:30 - 07:00 |
114 | I0719031 | Hanif Wisti Julitama | ANALISA SISTEM KONTROL DEADMAN SEBAGAI EMERGENCY BRAKE PADA LRT JABODEBEK | 10-06-2022 | Ruang Webinar 3 (s.id/teuns03) |
15:00 - 16:30 |
115 | I0719052 | Muhammad Shafiy Widi Kresno Wibisono | PERENCANAAN SISTEM TELEKOMUNIKASI PADA GARDU INDUK 150 KV MALOY DI PT PLN (PERSERO) UNIT INDUK PEMBANGUNAN KALBAGTIM | 09-06-2022 | Daring |
11:00 - 12:00 |
116 | I0719044 | Muhammad Ardhana Gusti Syahputra | Pengembangan website sebagai media Internet of Things Untuk Monitoring Hasil Produksi Barang Berbasis PLC (Programmable Logic Controller) di PT. Kayaba Indonesia | 09-06-2022 | Daring |
10:00 - 11:00 |
117 | I0719075 | Zaidan Alvin Al Hanif | PERANCANGAN SISTEM MONITORING DATA LOGGER TEGANGAN DAN ARUS PADA WIND TURBINE DI LENTERA BUMI NUSANTARA | 07-06-2022 | Ruang Webinar 2 (s.id/teuns02) |
15:30 - 17:00 |
118 | I0719027 | Fitroh Romadhon | RANCANG BANGUN SISTEM PENGAMAN PENUMPUKAN BOTOL PADA KONVEYOR DAN MONITORING VOLUME PELUMAS DI DALAM TANGKI FILLING PADA AREA PRODUKSI LITHOS PT. PERTAMINA LUBRICANTS PUC | 07-06-2022 | Ruang Webinar 2 (s.id/teuns02) |
15:30 - 17:00 |
119 | I0719002 | Abdul Latif Priyadi | ANALISIS PENGUKURAN SUHU PADA BAY TRAFO III 60 MVA DI GARDU INDUK 150 KV KALIBAKAL PT PLN (PERSERO) UPT PURWOKERTO | 01-06-2022 | Ruang Kuliah 3202 |
13:00 - 14:30 |
120 | I0719067 | Salsabila Ananda Putri | PENGUKURAN THERMOVISI PADA TITIK SAMBUNGAN, TERMINAL, DAN KONTAK MENGGUNAKAN THERMAL IMAGER FLIR E60 SERIES DI BAY PENGHANTAR BUMIAYU GARDU INDUK 150 KV KALIBAKAL PT. PLN (PERSERO) UPT PURWOKERTO | 31-05-2022 | Daring |
13:00 - 14:00 |
121 | I0719030 | Gustav Lukman Adhi Pradhityo | Pemeliharaan Preventif dan Korektif Motor Induksi 3 Fasa 75 HP Cooling Tower di PT. Geo Dipa Energi Unit Dieng | 30-05-2022 | Ruang Webinar 5 (s.id/teuns05) |
11:00 - 12:00 |
122 | I0719064 | Refansyah Basu Dewa | Rancang bangun sistem monitoring suhu pada ruang server fire detectiopn and alarm system secara realtime berbasis web di Kantor Cabang Utama Bandara Internasional Soekarno-Hatta PT Angkasa Pura II | 28-05-2022 | Ruang Virtual 5 |
08:00 - 09:00 |
123 | I0719073 | Wahyu Kusumojati Sapardi | ANALISA PERANCANGAN PROJECT SOLAR PV POWER PLANT GREENHOUSE 240 kWp PT SYNTEK OTOMASI INDONESIA | 27-05-2022 | Ruang Webinar 6 (s.id/teuns06) |
08:00 - 09:00 |
124 | I0719009 | Alexander Fajar Listianto Satrio Utomo | DESAIN DAN SIMULASI PWM RECTIFIER 3 FASA UNTUK MODE PENGISI BATERAI DARI GENSET DALAM KERETA HYBRID | 25-05-2022 | Ruang Webinar 5 (s.id/teuns05) |
08:00 - 09:00 |
125 | I0719046 | Muhammad Dhafier Mu'afa | FIRE DETECTION AND ALARM SYSTEM DENGAN RANCANG BANGUN SISTEM OTOMASI PINTU DARURAT DAN OCCUPANCY COUNTER DI KANTOR CABANG UTAMA BANDARA INTERNASIONAL SOEKARNO-HATTA PT ANGKASA PURA II | 20-05-2022 | Ruang Virtual 6 |
10:00 - 11:00 |
126 | I0719022 | Dina Mifika Sari | Peranan AVR Dalam Pengaturan Tegangan Generator Sinkron Pembangkit Listrik Tenaga Uap di PT Indonesia Power Jateng 2 Adipala OMU | 20-05-2022 | Ruang Virtual 6 |
09:00 - 10:00 |
127 | I0719005 | Ahmad Hanif Shalahuddin | ANALISIS DESAIN ELEKTRIKAL PANEL SURYA PADA PLTS ATAP 300 KWP PT. GLOBALINDO INTIMATES | 16-05-2022 | Ruang Webinar 6 (s.id/teuns06) |
07:00 - 08:00 |
128 | I0719049 | Muhammad Hasya Nurfaizi | ANALISIS ARUS 3I0 TINGGI DAN PENGARUHNYA TERHADAP RELAY GFR BAY TRAFO 1 GARDU INDUK 150 KV MASARAN | 11-05-2022 | Ruang Webinar 5 (s.id/teuns05) |
08:00 - 08:30 |
129 | I0719070 | Stefanus Marcellindo | PENGGUNAAN PARTIAL DISCHARGE ONLINE PADA GENERATOR PEMBANGKIT LISTRIK TENAGA UAP DI PT INDONESIA POWER OMU JATENG 2 ADIPALA | 11-05-2022 | Ruang Webinar 6 (s.id/teuns06) |
20:00 - 21:00 |
130 | I0719013 | Andika Sukma Pradana | Project Management Information System di PT XL Axiata Tbk | 10-05-2022 | Daring |
14:00 - 15:00 |
131 | I0719061 | Putra Maulana Yusuf | RANCANGAN SEMI AUTOMATIC ANNOUCEMENT SYSTEM PADA BAGIAN PUBLIC ADDRESS SYSTEM KANTOR CABANG UTAMA BANDARA INTERNASIONAL SOEKARNO-HATTA PT ANGKASA PURA II | 10-05-2022 | Ruang Webinar 6 (s.id/teuns06) |
15:00 - 16:00 |
132 | I0719066 | Royyan Nurbiksa Jaka Pratama | ANALISA PENGARUH GEOMETRI UMBRELLA TERHADAP PERFORMA PERMANENT MAGNET SYNCHRONOUS GENERATOR (PMSG) 12S4P DI PT. LENTERA BUMI NUSANTARA | 09-05-2022 | Ruang Webinar 6 (s.id/teuns06) |
20:00 - 21:00 |
133 | I0719074 | Wisanggeni Titovandaru | LOAD BALANCING JARINGAN PT PELINDO (PERSERO) REGIONAL 2 CABANG PANJANG | 29-04-2022 | Ruang Webinar 6 (s.id/teuns06) |
20:30 - 21:30 |
134 | I0719003 | Abdul Qodir Jaelani | Pengujian Partial Discharge secara Online Pada Generator G-101 di PLTP Geodipa Unit Dieng | 28-04-2022 | Ruang Webinar 5 (s.id/teuns05) |
16:30 - 17:30 |
135 | I0719011 | Alloyus Bayu Hans Abram | PENGEMBANGAN SISTEM INFORMASI TIMELINE IT SUPPORT PT PELINDO (PERSERO) REGIONAL 2 CABANG PANJANG | 28-04-2022 | Ruang Webinar 5 (s.id/teuns05) |
15:30 - 16:30 |
136 | I0719041 | Maulana Afif | ANALISIS FISIBILITAS PEMBANGKIT LISTRIK TENAGA SURYA ATAP 1,7 MWp SISTEM ON-GRID DI PT PRIMA SEJATI SEJAHTERA, BOYOLALI, JAWA TENGAH | 27-04-2022 | Ruang Webinar 3 (s.id/teuns03) |
13:00 - 15:00 |
137 | I0719020 | Damaris Adi Waskitho | “Analisa Sistem Proteksi Dan Starting Panel Mcc Motor Induksi 3 Fasa 200 Hp Pada Well Pad 30 Di Pt. Geo Dipa Energi Unit Dieng” | 26-04-2022 | Ruang Webinar 6 (s.id/teuns06) |
20:30 - 21:00 |
138 | I0719036 | Jihan Salsabila | REPETITIVE FAILURE ANALYSIS OF ELECTRIC HEATER 33-F-101 A/B/C IN PT. PERTAMINA REFINERY UNIT VI BALONGAN | 26-04-2022 | Ruang Webinar 6 (s.id/teuns06) |
21:30 - 22:00 |
139 | I0719004 | Adriel Satrio Nugroho | Pemeliharaan Dua Tahunan Pemutus Tenaga (PMT) Bay Trafo 2 di Gardu Induk 150 KV Bringin | 26-04-2022 | Ruang Webinar 6 (s.id/teuns06) |
21:00 - 21:30 |
140 | I0719039 | Mahaputra Nur Muhammad | ANALISA OPTIMALISASI DAYA TEMPERATURE CONTROL PADA MESIN EXTRUDER MENGGUNAKAN SOLID STATE RELAY DI PT. HAGIHARA WEST JAVA INDSUSTRIES | 25-04-2022 | Ruang Webinar 6 (s.id/teuns06) |
15:30 - 16:15 |
141 | I0719063 | Rebekka Siswandina Sari | Analisis Tahanan Pentanahan Tower SUTT 150 kV di Kalibakal-Bumiayu | 25-04-2022 | Ruang Webinar 6 (s.id/teuns06) |
16:15 - 17:00 |
142 | I0719050 | Muhammad Raflie Pangestu | Implementasi Aplikasi Sistem Informasi Inventaris PT Pelabuhan Indonesia (Persero) Regional 2 Cabang Panjang | 23-04-2022 | Ruang Webinar 6 (s.id/teuns06) |
20:30 - 21:30 |
143 | I0719025 | Fazlur Rahman Javier | Analisis Pengujian Pemisah dan Pemutus Tenaga Pada Pemeliharaan Rutin 2 Tahunan (Shutdown Measurement) Bay Pedan 1 Gardu Induk 150kV Jajar | 22-04-2022 | Ruang Webinar 6 (s.id/teuns06) |
07:30 - 08:30 |
144 | I0719010 | Ali Ekatma Rendra | ANALISIS UJI HOTSPOT MENGGUNAKAN METODE THERMOVISI PADA SISTEM JARINGAN SUTT 150 KV DI WILAYAH KERJA PT PLN (PERSERO) ULTG SURAKARTA | 20-04-2022 | Ruang Webinar 6 (s.id/teuns06) |
20:30 - 21:30 |
145 | I0718020 | Mohammad Ravi Rachman | FACTORY ACCEPTANCE TEST PT. SIEMENS INDONESIA PULOMAS FACTORY | 07-04-2022 | Ruang Webinar 6 (s.id/teuns06) |
10:00 - 11:30 |
146 | I0719069 | Stefani Widyaningrum | Meter Reading 3 Fasa berbasis Web Server di Kubikel Outgoing to Terminal Lama PT. Angkasa Pura I (Persero) Kantor Cabang Bandar Udara Internasional Adi Soemarmo Surakarta | 05-04-2022 | Ruang Kuliah 3201 |
07:00 - 08:00 |
147 | I0719021 | Dika Kartika Oktaviani | Pengujian Breakdown Voltage pada Oli OLTC LSTr di PT. PLN (Persero) ULPL TA Musi | 04-04-2022 | Ruang Webinar 5 (s.id/teuns05) |
10:00 - 11:00 |
148 | I0719056 | Nadya Puteri Nur Utomo | PERANCANGAN SISTEM MONITORING BATERAI UPS AIRFIELD LIGHTING SYSTEM DI BANDAR UDARA ADI SOEMARMO SURAKARTA | 02-04-2022 | Ruang Webinar 5 (s.id/teuns05) |
09:00 - 12:00 |
149 | I0719029 | Geovani Rahmad Illahi | Estimasi Produksi Energi dan Sistem Monitoring Data Pada Perancangan PLTS Atap 300 kWp PT. Globalindo Intimates | 16-03-2022 | Daring |
14:00 - 14:30 |
150 | I0719023 | Faiq Izzul Islami | PENGADAAN DAN PENAMBAHAN 2 TRANSMISI LINE BAY PADA GARDU INDUK 150KV NEW SIDOARJO : LINE BAY WARU 1 DAN PORONG 2 | 11-03-2022 | Ruang Webinar 3 (s.id/teuns03) |
13:00 - 13:55 |
151 | I0715021 | Mohammad Izzul Mukhtar | NOS (Nangsri Online System) sebagai Pengembangan Layanan Administrasi Desa serta Optimalisasi Sektor Sosial, Ekonomi, dan Pendidikan Desa Nangsri, Kabupaten Karanganyar | 24-02-2022 | Daring |
19:30 - 20:30 |
152 | I0718016 | Imam Arif | PENYEBAB DAN IMPLEMENTASI PENANGANAN GANGGUAN JARINGAN DISTRIBUSI PT PLN (PERSERO) UNIT PELAKSANAAN PELAYANAN PELANGGAN (UP3) YOGYAKARTA | 02-02-2022 | Ruang Webinar 5 (s.id/teuns05) |
13:00 - 14:00 |
153 | I0718001 | Abraham Babtistio | ANALISIS SISTEM KONTROL HYBRID PADA DESALINATION PLANT PLTGU TAMBAK LOROK PT INDONESIA POWER SEMARANG PGU | 25-01-2022 | Ruang Webinar 2 (s.id/teuns02) |
13:00 - 13:30 |
154 | I0718012 | Gibran Dzulfikar Ghaffara | Analisis Sistem Kendali Governor Pembangkit Listrik Tenaga Diesel Sebagai Fungsi Pengoptimalan Bahan Bakar Di PPSDM Migas | 13-01-2022 | Ruang Virtual 5 |
15:30 - 17:30 |
155 | I0718023 | Muhammad Ghozy Al Hakim | Smart Lighting dan Smart Surveilance Berbasis Panel Surya | 13-01-2022 | Ruang Webinar 1 (s.id/teuns01) |
13:00 - 14:00 |
156 | I0718007 | Desi Sunyahni | OTOMASI SISTEM PENGISIAN DAN PENGOSONGAN CRUDE OIL PADA TANGKI 101 DAN 102 BERBASIS PLC di PPSDM MIGAS CEPU | 13-01-2022 | Ruang Webinar 1 (s.id/teuns01) |
14:00 - 15:00 |
157 | I0718034 | Slash Arthur Edi Sumawang | PENGARUH PENAMBAHAN SLOT PADA PERMANENT MAGNET SYNCHRONOUS GENERATOR (PMSG) TERHADAP NILAI BACK EMF DAN KE YANG DIHASILKAN BERBASIS FINITE ELEMENT METHOD (FEM) DI LENTERA BUMI NUSANTARA | 30-12-2021 | Ruang Webinar 1 (s.id/teuns01) |
13:00 - 14:15 |
158 | I0718032 | Rois Hasan Muhammad | ANALISA GANGGUAN PADA KABEL FIBER OPTIK G-655 SEBAGAI TRANSPORT DALAM SISTEM JARINGAN TELEKOMUNIKASI FIBER OPTIK DI PT. TELEKOMUNIKASI INDONESIA WITEL SURAKARTA | 06-12-2021 | Ruang Webinar 5 (s.id/teuns05) |
19:00 - 20:00 |
159 | I0718018 | M. Fatkhi Futukhal Arifin | ANALISIS PERBANDINGAN PANJANG DAN LEBAR MAGNET UNTUK LUASAN SAMA PADA IPMSG 12S8P TERHADAP NILAI DAYA DAN COGGING MENGGUNAKAN FINITE ELEMENT METHOD DI LENTERA BUMI NUSANTARA | 02-12-2021 | Ruang Webinar 1 (s.id/teuns01) |
19:00 - 20:00 |
160 | I0717038 | Riski Rama Kusuma | Analisis Rentang Jendela Operasi Optimum Baterai LiFePO4 | 01-12-2021 | Ruang Webinar 5 (s.id/teuns05) |
15:30 - 16:30 |
161 | I0718009 | Fandi Surya Adinata | Perancangan Sistem Pemantauan Kualitas Air Baku dan Debit Air di PT. Solusi Teknologi Air Nusantara | 01-10-2021 | Ruang Webinar 6 (s.id/teuns06) |
07:30 - 08:30 |
162 | I0718025 | Nada Syadza Azizah | ANALISA SISTEM DCS PADA UNIT SEA WATER DESALINATION 054WS101 MAINTENANCE AREA V PERTAMINA RU IV CILACAP | 22-09-2021 | Ruang Kuliah 3202 |
15:30 - 17:30 |
163 | I0717009 | Bakasrian Fericoari | IMPLEMENTASI SISTEM KONTROL MOTOR DC DENGAN SENSOR ROTARY ENCODER PADA PORTABLE VENTILATOR COVID-19 | 12-08-2021 | Ruang Webinar 5 (s.id/teuns05) |
10:00 - 12:00 |
164 | I0718004 | Andhika Rizkita Putera | Individual Test Current Transformator Gardu Induk 150 KV di PLTP Small Scale 10 MW Dieng | 06-08-2021 | Ruang Virtual 4 |
13:00 - 14:00 |
165 | I0718010 | Firmansyah Abada | Pengujian Individual Test Pre Commissioning LA CT dan PMT Gardu Induk Pembangkit PLTP Dieng Jawa Tengah | 06-08-2021 | Ruang Virtual 5 |
15:30 - 17:00 |
166 | I0717032 | Muhammad Rizqi Subeno | Pengembangan Resusitator Portable | 24-06-2021 | Ruang Virtual 2 |
10:00 - 10:40 |
167 | I0718013 | Hanandya Maya Shafira | ANALISA GANGGUAN TRANSFORMATOR DISTRIBUSI 1 FASA PADA FEEDER BANTUL-12 | 28-05-2021 | Ruang Virtual 5 |
10:00 - 11:00 |
168 | 10011001 | Akun Contoh | contoh saja | 26-05-2021 | Ruang Kuliah 6407 |
12:00 - 13:00 |
169 | I0718005 | Annisa Larasati Febrianingrum | EVALUASI KEANDALAN DAN PENYEBAB GANGGUAN JTM 20 KV UNTUK MENEKAN SAIFI PADA FEEDER GJN03 PT. PLN (PERSERO) UNIT PELAKSANA PELAYANAN PELANGGAN (UP3) YOGYAKARTA | 21-05-2021 | Ruang Virtual 5 |
15:30 - 16:30 |
170 | I0717024 | M. Iqbal Zidny | PERANCANGAN INVERTER SATU FASA DENGAN METODE SPWM BERBASIS ARDUINO NANO | 19-01-2021 | Ruang Virtual 4 |
09:00 - 10:30 |
171 | I0717002 | Agung Budi Utomo | Perancangan Sistem Kendali Berbasis Arduino untuk Robot Humanoid 17-DOF | 14-01-2021 | Ruang Virtual 4 |
13:00 - 13:30 |
172 | I0717005 | Arif Wibowo | PERANCANGAN DC-DC BIDIRECTIONAL CONVERTER PADA SOLAR PANEL | 14-01-2021 | Ruang Virtual 4 |
13:30 - 14:00 |
173 | I0717029 | Muhammad Renaldy Darmawan | Perancangan Sistem Monitoring Berbasis Hmi Untuk Perangkat Pengendalian Kecepatan Motor Induksi | 13-01-2021 | Ruang Virtual 4 |
13:00 - 14:00 |
174 | I0717022 | Ivan Robi Septian | RANCANG BANGUN SISTEM MONITORING PLASMA PENGHASIL OZON BERBASIS HMI SEBAGAI DISINFEKTAN | 13-01-2021 | Ruang Virtual 4 |
14:30 - 15:00 |
175 | I0717025 | M. Maulana Yusuf | MONITORING PLASMA HV OZONISASI UNTUK APLIKASI PEMBERSIHAN AIR | 13-01-2021 | Ruang Virtual 4 |
14:00 - 14:30 |
176 | I0717021 | Hisbullah Ahmad Fathoni | RANCANG BANGUN LoRA BUILDING ENERGY MANAGEMENT SYSTEM | 11-01-2021 | Ruang Virtual 2 |
09:00 - 09:30 |
177 | I0717013 | Bima Damar Jati | PENGEMBANGAN SISTEM INFORMASI ADMIN PANEL PADA SISTEM INFORMASI LoBEMS | 11-01-2021 | Ruang Webinar 2 (s.id/teuns02) |
09:30 - 10:00 |
178 | I0717016 | Faishal Hanifan Ma`Ruf | DESAIN MODUL PRAKTIKUM TELEKOMUNIKASI | 08-01-2021 | Ruang Virtual 4 |
15:30 - 16:00 |
179 | I0717035 | Nanda Hafidz Rivanda | Pengembangan People Counter Menggunakan Image Processing Di Gedung 3 Fakultas Teknik Universitas Sebelas Maret | 08-01-2021 | Ruang Virtual 4 |
16:00 - 16:30 |
180 | I0717015 | Fahmi Ismail | MONITORING DAN KONTROL PANEL LISTRIK 3 PHASA | 08-01-2021 | Ruang Virtual 4 |
16:30 - 17:00 |
181 | I0717033 | Muhammad Wakhid Wardani | IMPLEMENTASI SISTEM INFORMASI MANAJEMEN KULIAH PRAKTIK (KP) DAN TUGAS AKHIR (TA) DI FAKULTAS TEKNIK UNS | 08-01-2021 | Ruang Virtual 4 |
13:30 - 14:00 |
182 | I0717030 | Muhammad Rifai | IMPLEMENTASI SISTEM INFORMASI OUTCOME BASED EDUCATION (OBE) DI FAKULTAS TEKNIK UNS | 08-01-2021 | Ruang Virtual 4 |
14:00 - 14:30 |
183 | I0717011 | Bayhaqi Irfani | PERBANDINGAN KARAKTERISTIK PMSG (PERMANENT MAGNET SYNCHRONOUS GENERATOR ) 12S8P DENGAN PMSG 18S16P BERBASIS FEM (FINITE ELEMENT METHOD | 07-12-2020 | Ruang Kuliah 3201 |
13:00 - 13:50 |
184 | I0717001 | Aditya Pratama | PENGARUH VARIASI TEBAL DAN DIAMETER PMSG 12S8P TERHADAP DAYA OUPUT DAN EFISIENSI GENERATOR MENGGUNAKAN SOFTWARE DESAIN ELEKTROMAGNETIK BERBASIS FINITE ELEMENT METHOD | 09-09-2020 | Daring |
08:00 - 09:00 |
185 | I0717014 | Bintar Yudo Sadewo | PEMELIHARAAN PERIODIK DAN PENGAMATAN KARAKTERISTIK SISTEM EKSITASI GENERATOR SINKRON PADA PLTU JATENG 2 ADIPALA PT. INDONESIA POWER-MSU SEMARANG | 27-08-2020 | Daring |
09:00 - 10:00 |
186 | I0717026 | Mohammad Raihan H. | Sistem Komunikasi Pada Peluru Kendali | 24-08-2020 | Daring |
08:30 - 09:30 |
187 | I0715027 | Muhammad Wahid Hasyim | SISTEM MANAJEMEN TES TOEFL GLOLINGO AND VRIDOM EDUCATION DIGITAL STARTUP | 04-08-2020 | Daring |
14:00 - 15:00 |
188 | I0717023 | Kevin Dwiyanto Saputra | ANALISA PERFORMA PV ROOFTOP 10 kWp BERBASIS SMART GRID DI GEDUNG ENERGI B2TKE-BPPT | 03-08-2020 | Daring |
10:00 - 11:00 |
189 | I0717004 | Alvin Ichwannur Ridho | PEMELIHARAAN PREVENTIF LOAD BREAK SWITCH MOTORIZED PADA SISTEM DISTRIBUSI 20 KV DI PT. PLN (Persero) UNIT PELAKSANA PENGATUR DISTRIBUSI (UP2D) KALIMANTAN BARAT | 03-08-2020 | Daring |
13:00 - 14:00 |
190 | I0717010 | Banu Maheswara | PERANCANGAN SISTEM KENDALI OTOMATIK ALTITUDE HOLDER UNMANNED AERIAL VEHICLE (UAV) MEDIUM ALTITUDE LONG ENDURANCE (MALE) DENGAN CONTROLLER PID | 03-08-2020 | Daring |
11:00 - 12:00 |
191 | I0717012 | Berlianne Shanaza Andriany | ANALISIS SISTEM KONTROL TIRE TIGHTEN MACHINE PADA PROSES PEMASANGAN RODA TRUK MEDIUM DI PT HINO MOTORS MANUFACTURING INDONESIA | 30-07-2020 | Daring |
19:00 - 20:00 |
192 | I0717018 | Hanifah Yulia | SISTEM INFORMASI PEMELIHARAAN PREVENTIF DIES PT TRIMITRA CHITRAHASTA | 23-07-2020 | Daring |
10:00 - 12:00 |
193 | I0717037 | Rifqi Paradisa | IMPROVISASI AKSES TERHADAP MAIN SERVER PLC MENGGUNAKAN MEDIA WIRELESS NETWORK PT SARIHUSADA GENERASI MAHARDIKA PLANT YOGYAKARTA | 17-07-2020 | Daring |
09:00 - 11:00 |
194 | I0717028 | Muhammad Ikyu Arqie Ramadhan | ANALISIS KARAKTERISTIK AERODINAMIKA DAN KESTABILAN PESAWAT PADA TAILAP PLERIMENARY DESIGN DENGAN MENGGUNAKAN SOFTWARE OPENVSP, 2020 | 13-03-2020 | Ruang Kuliah 3201 |
13:00 - 00:00 |
195 | I0717041 | Weldino Panji Kurniadi | ANALISIS SISTEM KERJA DAN PERFORMA PV ROOFTOP 10 KWP BERBASIS SMART GRID PADA GEDUNG B2TKE BPPT PUSPIPTEK SERPON | 13-03-2020 | Ruang Kuliah 3201 |
13:00 - 00:00 |
196 | I0717008 | Aulia Vici Yunitasari | SISTEM PROTEKSI OVER CURRENT RELAY (CO-5) PADA MOTOR FDFAN 3A PLTU UNIT 3 PT INDONESIA POWER SEMARANG | 10-03-2020 | Ruang Kuliah 3201 |
13:00 - 00:00 |
197 | I0717007 | Attar Al Mufashal Rasyid | ANALISA SISTEM PROTEKSI PENYULANG GAMBUS 20kV DENGAN SEPAM SERI 40 PADA PLTU BATURAJA PT. BAKTI NUGRAHA YUDA ENERGY | 10-03-2020 | Ruang Kuliah 3201 |
14:00 - 00:00 |
198 | I0717006 | Athaya Cantia Putri | Sistem Pernapasan Pada Generator Transformer (GT) Menggunakan Dehydrating Breather PLTU UNIT 3 PT Indonesia Power Semarang PGU | 06-03-2020 | Ruang Sidang 3204 |
08:00 - 00:00 |
199 | I0717017 | Gilang Satria Ajie | PENGUJIAN KUALITAS ISOLASI BELITAN DARI KUMPARAN STATOR GENERATOR SINKRON BERDASARKAN NILAI TAHANAN ISOLASI, TAN DELTA, DAN PARTIAL DISCHARGE PADA PLTU JATENG 2 ADIPALA | 06-03-2020 | Ruang Sidang 3204 |
09:20 - 00:00 |
200 | I0717039 | Sony Adyatama | ANALISA SISTEM PROTEKSI TURBO GENERATOR 12MW DENGAN WANLIDA MGPR 620Hb (BACKUP PROTECTION) PLTU BATURAJA PT. BAKTI NUGRAHA YUDA ENERGY | 28-02-2020 | Ruang Rapat Prodi |
09:00 - 00:00 |
201 | I0714002 | Aditya Meita Nugraha | 02-10-2017 | Ruang Kuliah 6407 |
09:00 - 00:00 |
|
202 | I0714006 | Aulia Ardan Sultani | 30-11--0001 | Ruang Kuliah 3201 |
00:00 - 00:00 |
|
203 | I0714003 | Aji Fauzan Hidayat | 30-11--0001 | Ruang Kuliah 3201 |
00:00 - 00:00 |
|
204 | I0714019 | Luthfy Makhmudy | 30-11--0001 | Ruang Kuliah 3201 |
00:00 - 00:00 |
|
205 | I0714017 | Igor M. Farhan | 30-11--0001 | Ruang Kuliah 3201 |
00:00 - 00:00 |
|
206 | I0714015 | Ferdiansyah Ashil Farisi | 30-11--0001 | Ruang Kuliah 3201 |
00:00 - 00:00 |
|
207 | I0714001 | Abid Alim Mustaqim | 30-11--0001 | Ruang Kuliah 3201 |
00:00 - 00:00 |
|
208 | I0715003 | Ahmad Syah Aljabar | 30-11--0001 | Ruang Kuliah 3201 |
00:00 - 00:00 |
|
209 | I0714020 | M Hakim Adhiguna | 30-11--0001 | Ruang Kuliah 3201 |
00:00 - 00:00 |
|
210 | I0714032 | Stephanus Hanurjaya | 30-11--0001 | Ruang Kuliah 3201 |
00:00 - 00:00 |
|
211 | I0714011 | Edi Nugroho | 30-11--0001 | Ruang Kuliah 3201 |
00:00 - 00:00 |
|
212 | I0714021 | Muhamad Dzaky Ashidqi | 30-11--0001 | Ruang Kuliah 3201 |
00:00 - 00:00 |
|
213 | I0714031 | Rizal Nurhidayat | 30-11--0001 | Ruang Kuliah 3201 |
00:00 - 00:00 |
|
214 | I0715038 | Yasmine Afifah | 30-11--0001 | Ruang Kuliah 3201 |
00:00 - 00:00 |
|
215 | I0715029 | Oktavian Listiyanto | 30-11--0001 | Ruang Kuliah 3201 |
00:00 - 00:00 |
|
216 | I0715034 | Tony Febrianto | 30-11--0001 | Ruang Kuliah 3201 |
00:00 - 00:00 |
|
217 | I0715022 | Muhammad Akmal | 30-11--0001 | Ruang Kuliah 3201 |
00:00 - 00:00 |
|
218 | I0715031 | Ratih Rachmatika | 30-11--0001 | Ruang Kuliah 3201 |
00:00 - 00:00 |
|
219 | I0715012 | Ghea Faradiba | 30-11--0001 | Ruang Kuliah 3201 |
00:00 - 00:00 |
|
220 | I0715033 | Sifa`Us Wulaning Arsri | 30-11--0001 | Ruang Kuliah 3201 |
00:00 - 00:00 |
|
221 | I0714007 | Bima Tri Prasetya | 30-11--0001 | Ruang Kuliah 3201 |
00:00 - 00:00 |
|
222 | I0715004 | Arif Nuruddin | 30-11--0001 | Ruang Kuliah 3201 |
00:00 - 00:00 |
|
223 | I0715001 | Abyan Habibie | 30-11--0001 | Ruang Kuliah 3201 |
00:00 - 00:00 |
|
224 | I0715028 | Mustofa Danang Ariyanto | 30-11--0001 | Ruang Kuliah 3201 |
00:00 - 00:00 |
|
225 | I0715002 | Aditya Nur Fauzi G | 30-11--0001 | Ruang Kuliah 3201 |
00:00 - 00:00 |
|
226 | I0715018 | Latif Nur Fauzi | 30-11--0001 | Ruang Kuliah 3201 |
00:00 - 00:00 |
|
227 | I0714016 | Fransiskus Xaverius Rian Wicaksono | 30-11--0001 | Ruang Kuliah 3201 |
00:00 - 00:00 |
|
228 | I0715017 | Kirana Dyah Utari Kusumaputri | 30-11--0001 | Ruang Kuliah 3201 |
00:00 - 00:00 |
|
229 | I0715001 | Abyan Habibie | Pengujian Tan Delta Sebagai Ukuran Kualitas Isolasi Trafo GI Gandaria di WIlayah Kerja PY. PLN (Persero) Area Pelaksana Pemeliharaan Cawang | 30-11--0001 | Ruang Kuliah 3201 |
00:00 - 00:00 |
230 | I0714004 | Andryawan Jaya Purnama | 30-11--0001 | Ruang Kuliah 3201 |
00:00 - 00:00 |
|
231 | I0714005 | Anrico Gideon Alfano | 30-11--0001 | Ruang Kuliah 3201 |
00:00 - 00:00 |
|
232 | I0714033 | Zulhendra Hanif | 30-11--0001 | Ruang Kuliah 3201 |
00:00 - 00:00 |
|
233 | I0714008 | Bina Pangestu Nugroho | 30-11--0001 | Ruang Kuliah 3201 |
00:00 - 00:00 |
|
234 | I0715015 | Jusuf Abimas Pratama | File Library Development Into Web-Based di PT GMF Aeroasia | 30-11--0001 | Ruang Kuliah 3201 |
00:00 - 00:00 |
235 | I0715014 | Johan Try Affandy | 30-11--0001 | Ruang Kuliah 3201 |
00:00 - 00:00 |
|
236 | I0715005 | Arifian Trilaksita | 30-11--0001 | Ruang Kuliah 3201 |
00:00 - 00:00 |
|
237 | I0715020 | Lia Anjarwati | 30-11--0001 | Ruang Kuliah 3201 |
00:00 - 00:00 |
|
238 | I0715026 | Muhammad Ramadhan Bagas Purnomo | 30-11--0001 | Ruang Kuliah 3201 |
00:00 - 00:00 |
|
239 | I0715032 | Ryoki Martfuadi | 30-11--0001 | Ruang Kuliah 3201 |
00:00 - 00:00 |
|
240 | I0715024 | Muhammad Fajar Prakasa | 30-11--0001 | Ruang Kuliah 3201 |
00:00 - 00:00 |
|
241 | I0715016 | Kharis Akbar Baharizky | 30-11--0001 | Ruang Kuliah 3201 |
00:00 - 00:00 |
|
242 | I0715025 | Muhammad Gunawan | 30-11--0001 | Ruang Kuliah 3201 |
00:00 - 00:00 |
|
243 | I0715040 | Yuana Ayub Sunarya | 30-11--0001 | Ruang Kuliah 3201 |
00:00 - 00:00 |
|
244 | I0715009 | Dwiki Dimas Shidiq | 30-11--0001 | Ruang Kuliah 3201 |
00:00 - 00:00 |
|
245 | I0715035 | Wahyu Kurniawan | 30-11--0001 | Ruang Kuliah 3201 |
00:00 - 00:00 |
|
246 | I0715030 | Ramanda Fadhillah | 30-11--0001 | Ruang Kuliah 3201 |
00:00 - 00:00 |
|
247 | I0715013 | Hillga Richman Radhita | 30-11--0001 | Ruang Kuliah 3201 |
00:00 - 00:00 |
|
248 | I0715037 | Yan Mahardhika Putra Perdana | 30-11--0001 | Ruang Kuliah 3201 |
00:00 - 00:00 |
|
249 | I0715008 | Cesarius Adi A K | 30-11--0001 | Ruang Kuliah 3201 |
00:00 - 00:00 |
|
250 | I0715007 | Arthur Joshua Titus | 30-11--0001 | Ruang Kuliah 3201 |
00:00 - 00:00 |
|
251 | I0716032 | Vernanda Sitorini Zul Hizmi | Perancangan Kendali Otomatik Penjaga Ketinggian N245 dengan PID Controller di PT Dirgantara Indonesia | 30-11--0001 | Ruang Kuliah 3201 |
00:00 - 00:00 |
252 | I0716006 | Annisa Hanifa | Analisis Bit Error Rate (BER) dan Q-Factor pada Saluran Transmisi FTTH di STO Solo BAru, WITEL Solo Menggunakan Optisystem | 30-11--0001 | Ruang Kuliah 3201 |
00:00 - 00:00 |
253 | I0716020 | Miftahuddin Irfani | 30-11--0001 | Ruang Kuliah 3201 |
00:00 - 00:00 |
|
254 | I0716014 | Fuad Nur Kuncoro | 30-11--0001 | Ruang Kuliah 3201 |
00:00 - 00:00 |
|
255 | I0716034 | Yudhi Prabowo Kusuma | 30-11--0001 | Ruang Kuliah 3201 |
00:00 - 00:00 |
|
256 | I0716033 | Wiwik Nur Winda | 30-11--0001 | Ruang Kuliah 3201 |
00:00 - 00:00 |
|
257 | I0716011 | Bintang Sujatmiko | 30-11--0001 | Ruang Kuliah 3201 |
00:00 - 00:00 |
|
258 | I0716023 | Muhammad Fakhri Erri | 30-11--0001 | Ruang Kuliah 3201 |
00:00 - 00:00 |
|
259 | I0716001 | Adip Safiudin | 30-11--0001 | Ruang Kuliah 3201 |
00:00 - 00:00 |
|
260 | I0716018 | Kevin Sebastian | 30-11--0001 | Ruang Kuliah 3201 |
00:00 - 00:00 |
|
261 | I0716021 | Mohamad Nisman Falic | 30-11--0001 | Ruang Kuliah 3201 |
00:00 - 00:00 |
|
262 | I0716028 | Rilo Pambudi Aditya Wardani | 30-11--0001 | Ruang Kuliah 3201 |
00:00 - 00:00 |
|
263 | I0716019 | Krisna Hakim | 30-11--0001 | Ruang Kuliah 3201 |
00:00 - 00:00 |
|
264 | I0716012 | Daniel Aquino Purba | 30-11--0001 | Ruang Kuliah 3201 |
00:00 - 00:00 |
|
265 | I0716026 | Musyaffa' Ahmad | 30-11--0001 | Ruang Kuliah 3201 |
00:00 - 00:00 |
|
266 | I0716016 | Henry Probo Santoso | 30-11--0001 | Ruang Kuliah 3201 |
00:00 - 00:00 |
|
267 | I0716009 | Azis Ubaidilah | 30-11--0001 | Ruang Kuliah 3201 |
00:00 - 00:00 |
|
268 | I0716015 | Ghufron Husnan | 30-11--0001 | Ruang Kuliah 3201 |
00:00 - 00:00 |
|
269 | I0716002 | Adrian Seta Ekananda | 30-11--0001 | Ruang Kuliah 3201 |
00:00 - 00:00 |
|
270 | I0716017 | I Wayan Yoga K | 30-11--0001 | Ruang Kuliah 3201 |
00:00 - 00:00 |
|
271 | I0716030 | Salman Al Farisi | 30-11--0001 | Ruang Kuliah 3201 |
00:00 - 00:00 |
|
272 | I0716004 | Ahmad Imam Rauyani | 30-11--0001 | Ruang Kuliah 3201 |
00:00 - 00:00 |
|
273 | I0716027 | Oki Setiawan | 30-11--0001 | Ruang Kuliah 3201 |
00:00 - 00:00 |
|
274 | I0716003 | Afif Yuhendrasmiko | Perawatan Traksi Motor Type GE-761 | 30-11--0001 | Ruang Kuliah 3201 |
00:00 - 00:00 |
275 | I0715011 | Febri Abdul Rohman | 30-11--0001 | Ruang Kuliah 3201 |
00:00 - 00:00 |
|
276 | I0715006 | Aris Maulana Fauzan | 30-11--0001 | Ruang Kuliah 3201 |
00:00 - 00:00 |
|
277 | I0715010 | Faris Izzaturrahman | 30-11--0001 | Ruang Kuliah 3201 |
00:00 - 00:00 |
|
278 | I0714013 | Fasda Ilhaq Robbani | 01-01-1970 | Ruang Kuliah 3201 |
07:00 - 07:00 |
Tugas Akhir
Tawaran Topik TA
No | Pemberi Topik | Jenis Topik | Nama Proyek | Judul Topik | Penjelasan | Hardware | Software | Status |
---|---|---|---|---|---|---|---|---|
1 | Agus Ramelan, S.Pd., M.T. | Topik Tugas Akhir | Wind Turbine Generator Simulator | Energy Data Logger dan HMI dg Nextion | Energy Data Logger dan HMI dg Nextion | Arduino, HMI Nextion | - | Belum Diambil |
2 | Agus Ramelan, S.Pd., M.T. | Topik Tugas Akhir | Wind Turbine Generator Simulator | High Effeciency Inverter pada WTG | High Effeciency Inverter pada WTG | Power Electronics | Mikro | Belum Diambil |
3 | Agus Ramelan, S.Pd., M.T. | Topik Tugas Akhir | Wind Turbine Generator Simulator | MPTT dg Algoritma Optimal | MPTT dg Algoritma Optimal | Power Electronics | Mikro | Belum Diambil |
4 | Agus Ramelan, S.Pd., M.T. | Topik Tugas Akhir | Smart Building Management System | Monitoring dan Kontrol LVMDP Tiga Fasa Gedung 4 Fakultas Teknik UNS berabasis IoT | Monitoring dan Kontrol LVMDP Tiga Fasa Gedung 4 Fakultas Teknik UNS berabasis IoT | Mikro | Web/Mobile | Belum Diambil |
5 | Agus Ramelan, S.Pd., M.T. | Topik Tugas Akhir | Smart Building Management System | Monitoring dan Kontrol LVMDP Tiga Fasa Gedung 3 Fakultas Teknik UNS berabasis IoT | Monitoring dan Kontrol LVMDP Tiga Fasa Gedung 3 Fakultas Teknik UNS berabasis IoT | Mikro | - | Belum Diambil |
6 | Agus Ramelan, S.Pd., M.T. | Topik Tugas Akhir | Smart Building Management System | Implementasi IoT Based Smart Air Conditioning berbasis Algoritma Kendali Optimal | Implementasi IoT Based Smart Air Conditioning berbasis Algoritma Kendali Optimal | Mikro | - | Belum Diambil |
7 | Agus Ramelan, S.Pd., M.T. | Topik Tugas Akhir | Smart Building Management System | Implementasi IoT Based Smart Lighting berbasis Algoritma Kendali Optimal | Implementasi IoT Based Smart Lighting berbasis Algoritma Kendali Optimal Ref : https://ieeexplore.ieee.org/document/9034202 | Mikro | - | Belum Diambil |
8 | Agus Ramelan, S.Pd., M.T. | Topik Tugas Akhir | Smart Building Management System | Implementasi dan Evaluasi Penerapan Protokol Serial, Modbus dan CAN-Bus pada Energy Meter | Implementasi dan Evaluasi Penerapan Protokol Serial, Modbus dan CAN-Bus pada Energy Meter | Mikro | - | Belum Diambil |
9 | Agus Ramelan, S.Pd., M.T. | Topik Tugas Akhir | Smart Building Management System | Implementasi dan Evaluasi Penerapan Protokol MQTT dan HTTP pada IoT Based Energy Meter Ref : https://ieeexplore.ieee.org/document/7814989 | Implementasi dan Evaluasi Penerapan Protokol MQTT dan HTTP pada IoT Based Energy Meter Ref : https://ieeexplore.ieee.org/document/7814989 | Mikro | Web/Mobile | Belum Diambil |
10 | Agus Ramelan, S.Pd., M.T. | Topik Tugas Akhir | Smart Building Management System | Monitoring dan Kontrol Energi Listrik dengan Kombinasi ZigBee dan IEEE 802.11 Wireless LAN/WiFi | Monitoring dan Kontrol Energi Listrik dengan Kombinasi ZigBee dan IEEE 802.11 Wireless LAN/WiFi Ref : https://ieeexplore.ieee.org/document/5606276 | Mikro | Web/Mobile | Belum Diambil |
11 | Agus Ramelan, S.Pd., M.T. | Topik Tugas Akhir | Smart Building Management System | Monitoring dan Kontrol Energi Listrik dengan Kombinasi LoRaWAN dan IEEE 802.11 Wireless LAN/WiFi | Monitoring dan Kontrol Energi Listrik dengan Kombinasi LoRaWAN dan IEEE 802.11 Wireless LAN/WiFi Ref : https://ieeexplore.ieee.org/document/9716177 | Mikro | Web/Mobile | Sudah Diambil |
12 | Agus Ramelan, S.Pd., M.T. | Topik Tugas Akhir | Smart Building Management System | Monitoring dan Kontrol Energi Listrik dengan Kombinasi Power Line Communication (PLC) dan IEEE 802.11 Wireless LAN/WiFi | Monitoring dan Kontrol Energi Listrik dengan Kombinasi Power Line Communication (PLC) dan IEEE 802.11 Wireless LAN/WiFi Ref : https://ieeexplore.ieee.org/document/9475618 | Mikro | Web/Mobile | Belum Diambil |
13 | Muhammad Hamka I, S.T., M.Eng. | Topik Tugas Akhir | Pengolahan Citra Satelit | Monitoring Penggunaan Lahan di Sekitar Solo menggunakan Citra Satelit Sentinel-1 | Citra Sentinel-1 memiliki data yang terupdate sekitar 6-7 hari sekali. Pemanfaatan citra ini dapat digunakan untuk monitoring penggunaan lahan (misal luas area penggunaan untuk pertanian, pemukiman dll) di area sekitar Solo. Algoritma yang digunakan dapat memakai pengolahan citra secara konvensional (spasial, filtering , segmentasi dll) maupun menggunakan teknik deep learning. Pengujian dapat dilakukan dengan membandingkan secara langsung di ground. data RTRW terkait. | PC | Python, MATLAB | Belum Diambil |
14 | Agus Ramelan, S.Pd., M.T. | Topik Tugas Akhir | Pengembangan Sistem Informasi Manajemen Energi | Sistem Insformasi Manajemen Energi pada sebuah gedung dengan konsep fleksibelitas | Pada TA sebelumnya, sudah dikerjakan Sistem Informasi Manajemen Energi. Namun belum bersifat fleksibel, pada TA ini dikembangkan menjadi lebih fleksibel sesuai kebutuhan user. Jika berminat, hubungi saya segera. | Tidak Ada | XAMPP Laravel MySQL PHP | Belum Diambil |
15 | Muhammad Hamka I, S.T., M.Eng. | Topik Tugas Akhir | Visible Light Communication | Desain Modulasi dan Pengukuran Performa VLC | TA ini merupakan lanjutan dari 2 TA sebelumnya yaitu, - Analog Front end - BER Tester sebagai alat ukur Banyak variabel yang dapat diukur antara lain jenis modulasi, jarak, jenis lampu, jenis op amp | FPGA, Rangkaian Analog Signal Conditioning | Modelsim LabVIEW | Sudah Diambil |
16 | Muhammad Hamka I, S.T., M.Eng. | Topik Tugas Akhir | Virtual Lab | Framework Virtual Lab berbasis Remote Desktop dan Instrument Control | Mengembangkan virtual lab, dengan metode remote komputer yang tersentral, terhubung dengan instrumen (dapat diimplementasikan di satu study case modul praktikum elektro, misal pengamatan bentuk sinyal AC) | Komputer (mungkin client-server), Webcam, Instrument (Osiloskop, Frequency Generator), Arduino, Relay | Windows, Remote Desktop Management Software, LabVIEW/Visual Basic | Belum Diambil |
17 | Subuh Pramono S.T., M.T. | Topik Tugas Akhir | IoT untuk kebencanaan | Desain dan Realisasi Deteksi Tanah Longsor dan Ketinggian Air Sungai untuk Sistem Peringatan DIni daerah Rawan Bencana | Desain dan Realisasi Deteksi Tanah Longsor dan Ketinggian Air Sungai untuk Sistem Peringatan DIni daerah Rawan Bencana | Desain dan Realisasi Deteksi Tanah Longsor dan Ketinggian Air Sungai untuk Sistem Peringatan DIni daerah Rawan Bencana | Desain dan Realisasi Deteksi Tanah Longsor dan Ketinggian Air Sungai untuk Sistem Peringatan DIni daerah Rawan Bencana | Belum Diambil |
18 | Subuh Pramono S.T., M.T. | Topik Tugas Akhir | Peningkatan kinerja antena mikrostrip untuk 5G dengan frekuensi kerja 3.5 GHz (3 mahasiswa) | peningkatan kinerja antena (pelebarab BW,peningkatan Gain,perkecil mutual coupling,dll) dengan teknik: 1.Electromagnetics band gaps (EBG)-1 mahasiswa 2.Surface integrated waveguide (SIW)-1 mahasiswa 3.Frequency selective surface (FSS)-1 mahasiswa | mendesain, merealisasikan/mencetak,mengukur antena microstrip dengan alat ukur. Membandingkan hasil simulasi dan hasil pengukuran dari parameter2 utama antena | Pocket VNA (tersedia) | CST atau HFSS (tersedia) | Belum Diambil |
19 | Joko Slamet Saputro, S.Pd., M.T. | Topik Tugas Akhir | Autonomous Car | HILS (hardware in the loops Simulations) pada ADAS untuk mengatur kecepatan laju kendaraan | simulasi hardware aplikasi ADAS pada pengaturan kecepatan laju kendaraan pada kondisi jalanan Indonesia. | motor, arduino/raspi, sensor-sensor | Webots/V-Rep, Phyton | Belum Diambil |
20 | Joko Slamet Saputro, S.Pd., M.T. | Topik Tugas Akhir | Autonomous Mobile Robot (AMR) | Human/object Following Robot | membuat robot asisten pribadi yang dapat mengikuti manusia. | robot beroda, sensor kamera, arduino / raspberry | Arduino IDE, Matlab | Belum Diambil |
21 | Joko Slamet Saputro, S.Pd., M.T. | Topik Tugas Akhir | Autonomous Mobile Robot (AMR) | Autonomous Indoor-Mapping Robot | pemanfaatan robot sederhana untuk pemetaan dalam ruangan secara otonom. | mobile robot, sensor ultrasonic atau yang sejenis, Arduino | Matlab, proteus | Belum Diambil |
22 | Hari Maghfiroh M.Eng. | Topik Tugas Akhir | Kontrol Sistem Energi | Aplikasi sistem kandali pada converter | Sistem kendali converter pada aplikasi panel surya | converter, PV | MATLAB, Proteus | Belum Diambil |
23 | Hari Maghfiroh M.Eng. | Topik Tugas Akhir | Smart Mobile Robot | Energi management sistem | Merancang energi management sistem pada mobil robot | baterai, arduino | proteus | Belum Diambil |
24 | Hari Maghfiroh M.Eng. | Topik Tugas Akhir | Smart Mobile Robot | ADAS(Advanced Driver Assisted System) | Merancang sistem ADAS untuk diaplikasikan pada mobil robot | mobil robot, ardunio | MATLAB | Belum Diambil |
25 | Sutrisno S.T., M.Sc, Ph.D. | Topik Tugas Akhir | Intelligent Surveillance System (Iss) | Foreground-background segmentation on surveillance camera | TA ini fokus dalam pengolahan gambar/video CCTV | CCTV, webcam, dll | MATLAB, Python | Belum Diambil |
26 | Dr. Miftahul Anwar S.Si., M.Eng. | Topik Tugas Akhir | Transistor berbasis Elektron Tunggal | Simulasi 4 Dot SET (Single Elektron Transistor) untuk aplikasi efek memory | Simulasi Transistor elektron Tunggal menggunakan simulator SIMON 2.0 untuk mengamati efek memori untuk Quntum Computer. | SIMON 2.0 | Belum Diambil | |
27 | Dr. Miftahul Anwar S.Si., M.Eng. | Topik Tugas Akhir | Scanning Mokroskop | Sistem Tungsten Innert Gas untuk aplikasi Scanning Microscopy | Pembuatan Sistem Scanning Microscopy berbasis TIG dengan monitoring Arus yang menghasilkan gambar 3D | Arduino dan INTRUSTAR | Software analisis ORIGIN | Belum Diambil |
28 | Dr. Miftahul Anwar S.Si., M.Eng. | Topik Tugas Akhir | Plasma Teknologi | Doping Semikonduktor Menggunakan Plasma bertegangan Tinggi | Pembuatan sistem doping semikonduktor dan monitoringnya | Arduino dan portable DAQ INTRUSTAR | Software analisis Origin | Belum Diambil |
29 | Dr. Miftahul Anwar S.Si., M.Eng. | Topik Tugas Akhir | Plasma Teknologi | Sistem Plasma Arc Discharge untuk pembuatan Nanopartikel | Pembuatan sistem monitoring Aurs dan Tegangan Plasma | Arduino dan portable DAQ sistem INTRUSTAR | Software analisis Origin | Belum Diambil |
30 | Muhammad Hamka I, S.T., M.Eng. | Topik Tugas Akhir | Visible Light Communication | Pengembangan BER Tester untuk komunikasi VLC | Membuat hardware untuk pengujian BER pada komunikasi VLC | FPGA, LED, PC | Modelsim, Quartus | Sudah Diambil |
31 | Muhammad Hamka I, S.T., M.Eng. | Topik Tugas Akhir | Visible Light Communication | Desain Signal Conditioning untuk VLC Receiver | Membuat hardware untuk signal conditioning receiver VLC | FPGA, LED, opamp | Modelsim, Circuit design (Multisim) | Sudah Diambil |
Tugas Akhir
No | Nim | Nama | Judul | KBK TA | Lama Bimbingan |
---|---|---|---|---|---|
1 | I0719051 | Muhammad Rifqi Bachtiar | RANCANG BANGUN SISTEM MONITORING DUA PANEL SURYA BERBASIS BLYNK | Teknik Tenaga Listrik | LULUS |
2 | I0717027 | Muhammad Al Hamid | PERANCANGAN BATTERY MANAGEMENT SYSTEM PADA PROTOTYPE MOBIL LISTRIK OTONOM | Kontrol dan Mekatronika | 116 Hari |
3 | I0718029 | Raihan Rafif Kautsar Priyanto | RANCANG BANGUN PROTOTYPE MONITORING TEGANGAN DAN ARUS PADA PEMBANGKIT LISTRIK TENAGA SURYA BERBASIS INTERNET OF THINGS (IOT) | Teknik Tenaga Listrik | LULUS |
4 | I0718002 | Ahmad Azzam Hafidz | KOMPARASI PENERAPAN PID DAN FUZZY LOGIC CONTROLLER PADA VARIABEL SPEED DRIVE (VSD) MOTOR INDUKSI 3 FASA DENGAN DILENGKAPI SISTEM IOT | Teknik Tenaga Listrik | LULUS |
5 | I0719073 | Wahyu Kusumojati Sapardi | PERANCANGAN BIDIRECTIONAL CONVERTER DENGAN METODE AUTO CUT OFF BATTERY CHARGER DAN METODE SINUSOIDAL PULSE WIDTH MODULATION PADA UNINTERRUPTIBLE POWER SUPPLY | Teknik Tenaga Listrik | LULUS |
6 | I0719040 | Mark Reindhard Joyakin Silalahi | Charge and Discharge Monitoring System for Li-Ion Battery | Teknik Tenaga Listrik | 142 Hari |
7 | I0718033 | Roni Tamado | ANALISA RESITANSI DAN TEGANGAN PADA CARBON NANO PARTIKEL | Teknik Tenaga Listrik | 142 Hari |
8 | I0718035 | Syaifullah Filard L | Peningkatan Performa Operasi dan Perancangan Sistem Teleoperasi pada Prototipe AEV (Autonomous Electric Vehicle) / Kendaraan Listrik Otonom | Kontrol dan Mekatronika | LULUS |
9 | I0718015 | Ilham Gilang Pradana | Rancang Bangun Aplikasi Dashboard Digital untuk Motor Hybrid | Kontrol dan Mekatronika | 142 Hari |
10 | I0718021 | Muhamad Miftahus Surur | Perancangan dan Evaluasi Sistem Throttle Motor Listrik untuk Optimalisasi Responsivitas Kendaraan Listrik | Teknik Tenaga Listrik | 142 Hari |
11 | I0716003 | Afif Yuhendrasmiko | PERANCANGAN INSTALASI ULANG KABEL POWER PADA GEDUNG PERKANTORAN PT. ANGKASA PURA I (PERSERO) BANDARA INTERNASIONAL ADI SOEMARMO | Teknik Tenaga Listrik | LULUS |
12 | I0719066 | Royyan Nurbiksa Jaka Pratama | AUDIT ENERGI LISTRIK DAN ANALISIS POTENSI PENGHEMATAN KONSUMSI ENERGI LISTRIK DI PERUSAHAAN MANUFAKTUR | Teknik Tenaga Listrik | LULUS |
13 | I0718024 | Muhammad Ibnu Sina Abbas Parlin | APLIKASI NANO PARTIKEL KARBON DENGAN SINTESIS ARC-DISCHARGE SEBAGAI BAHAN ANODA PADA BATERAI LITHIUM | Teknik Tenaga Listrik | 253 Hari |
14 | I0719064 | Refansyah Basu Dewa | RANCANG BANGUN PURWARUPA SISTEM MONITORING MOBIL BERBASIS OBD II SECARA REAL TIME | Kontrol dan Mekatronika | LULUS |
15 | I0719016 | Attala Surya Prima Amanda | PENGEMBANGAN DATA ANALITIK PADA SISTEM INFORMASI MANAJEMEN KERJA PRAKTEK DAN TUGAS AKHIR DI FAKULTAS TEKNIK UNIVERSITAS SEBELAS MARET | Teknik Komputer dan Telekomunikasi | LULUS |
16 | I0719048 | Muhammad Haris Humaidi | PENGEMBANGAN LANJUT SISTEM INFORMASI REKOGNISI PEMBELAJARAN LAMPAU PROGRAM STUDI PROGRAM PROFESI INSINYUR UNS | Teknik Komputer dan Telekomunikasi | LULUS |
17 | I0719009 | Alexander Fajar Listianto Satrio Utomo | RANCANG BANGUN PROTOTIPE PWM RECTIFIER 3 FASA PADA KERETA HYBRID | Kontrol dan Mekatronika | LULUS |
18 | I0719030 | Gustav Lukman Adhi Pradhityo | Analisis Arus, Tegangan, dan Konsumsi Energi pada Plasma Arc Discharge dengan Perbedaan Media | Teknik Tenaga Listrik | LULUS |
19 | I0719059 | Pramesta Tigris | PERANCANGAN DESAIN DAN INSTALASI LISTRIK PADA PERUMAHAN PERSADA KUDUS | Teknik Tenaga Listrik | 313 Hari |
20 | I0719068 | Serafim Lemuel Riwibowo | IMPLEMENTASI ALGORITMA TREE TRAVERSAL PADA PENJADWALAN PENDIDIKAN PROFESI DOKTER UNIVERSITAS SEBELAS MARET | Teknik Komputer dan Telekomunikasi | LULUS |
21 | I0719076 | Zulfikar Juan Pramasta | SISTEM PERAMALAN DATA AKADEMIK DENGAN METODE TIME SERIES FORECASTING | Teknik Tenaga Listrik | LULUS |
22 | I0719062 | Rafi Panhardyansyah Dananjaya | ANALISIS KONSUMSI DAN POTENSI PENGHEMATAN ENERGI PENERANGAN, CHILLER, DAN ESKALATOR DENGAN METODE ANALYTIC HIERARCHY PROCESS DI TUNJUNGAN PLAZA 1 SURABAYA | Kontrol dan Mekatronika | LULUS |
23 | I0719047 | Muhammad Fikri Arifudin | Rancang Bangun Sistem Monitoring Arus, Tegangan, dan Suhu Pada Proses Charging dan Discharging Baterai Lithium Ion | Kontrol dan Mekatronika | LULUS |
24 | I0719008 | Aldin Wildan Razaqa | PERANCANGAN SMART CCTV DENGAN FACE RECOGNITION: PERBANDINGAN PENGGUNAAN MODEL KERAS DARI TEACHABLE MACHINE DAN MODEL SVM PADA PENGUJIAN JARAK DAN RESOLUSI KAMERA | Teknik Komputer dan Telekomunikasi | LULUS |
25 | I0719045 | Muhammad Ariz Fakhruddin | RANCANG BANGUN DAN ANALISIS SISTEM MONITORING PLASMA CORONA DISCHARGE PENGHASIL OZON SEBAGAI PEMBERSIH AIR | Teknik Komputer dan Telekomunikasi | LULUS |
26 | I0719070 | Stefanus Marcellindo | IMPLEMENTASI ADAPTIVE LIGHTING BERBASIS FUZZY LOGIC CONTROLLER DI LABORATORIUM INTERNET OF THINGS FAKULTAS TEKNIK UNIVERSITAS SEBELAS MARET | Teknik Tenaga Listrik | LULUS |
27 | I0719022 | Dina Mifika Sari | RANCANG BANGUN SISTEM PEMANTAUAN DAN PENGENDALIAN TAHANAN TANAH BERBASIS INTERNET OF THINGS | Teknik Tenaga Listrik | LULUS |
28 | I0719003 | Abdul Qodir Jaelani | Sistem Kendali Pada Electric Hydraulic Power Steering Untuk Microbus Listrik | Teknik Tenaga Listrik | 328 Hari |
29 | I0719046 | Muhammad Dhafier Mu'afa | EKSPERIMEN FREQUENCY RESPONSE DAN PENGEMBANGAN KONTROLER ELECTRIC POWER STEERING (EPS) PADA KENDARAAN LISTRIK OTONOM | Kontrol dan Mekatronika | LULUS |
30 | I0719027 | Fitroh Romadhon | SISTEM DETEKSI CITRA MAKANAN DAN ESTIMASI KANDUNGAN KALORI MENGGUNAKAN DEEP LEARNING UNTUK MENGATUR ASUPAN KALORI PADA TUBUH | Kontrol dan Mekatronika | LULUS |
31 | I0719036 | Jihan Salsabila | Audit Sistem Penerangan dan Tata Udara di Gedung 4 Fakultas Teknik Universitas Sebelas Maret | Teknik Tenaga Listrik | LULUS |
32 | I0719025 | Fazlur Rahman Javier | Analisis Dan Rancang Bangun Sistem Pendinginan Aktif dengan Aliran Fluida Cair Terhadap Peningkatan Daya dan Efisiensi Panel Surya 50WP Berbasis Blynk Cloud | Teknik Tenaga Listrik | LULUS |
33 | I0719033 | Hilwan Hafidzsyah | PERANCANGAN SISTEM MONITORING BERBASIS WEBSITE UNTUK IMPLEMENTASI INTERNET OF THINGS PADA MODULAR BATTERY MANAGEMENT SYSTEM 2 KILOWATT | Kontrol dan Mekatronika | LULUS |
34 | I0719029 | Geovani Rahmad Illahi | RANCANG BANGUN INTEGRASI SISTEM MASTER-SLAVE BATTERY MANAGEMENT SYSTEM (BMS) BATERAI LIFEPO4 BERBASIS PROTOKOL KOMUNIKASI CONTROLLER AREA NETWORK (CAN) | Teknik Tenaga Listrik | LULUS |
35 | 1234567891011 | 1234567891011 | asdsad | Teknik Tenaga Listrik | 341 Hari |
36 | I0719021 | Dika Kartika Oktaviani | RANCANG BANGUN SISTEM PENDINGINAN BERBASIS TERMOELEKTRIK PADA PENGOSONGAN PACK BATERAI | Teknik Tenaga Listrik | LULUS |
37 | I0719007 | Akbar Dharmawan | PERANCANGAN SISTEM PENGUKURAN KEKUATAN STRUKTUR BETON BERBASIS PROGRAMMABLE LOGIC CONTROL (PLC) | Kontrol dan Mekatronika | 342 Hari |
38 | I0719026 | Fiqi Haiqal | DETEKSI DAN REKOGNISI PLAT NOMOR KENDARAAN MENGGUNAKAN YOLOV3 DAN CNN | Kontrol dan Mekatronika | LULUS |
39 | I0719049 | Muhammad Hasya Nurfaizi | Rancang Bangun Sistem Unmanned Surfaces Vehicle Berbasis Koordinat dan Internet of Things untuk Pemberi Pakan Lele Semi Otomatis | Teknik Tenaga Listrik | LULUS |
40 | I0719072 | Wahono Aji Warjono | RANCANG BANGUN INTELLIGENT SPEED ASSISTANCE (ISA) BERBASIS SENSOR KAMERA PADA PURWARUPA KENDARAAN LISTRIK OTONOM | Kontrol dan Mekatronika | LULUS |
41 | I0719037 | Kresna Pandu Pratama | IDENTIFIKASI KECUKUPAN MAKRONUTRISI PADA TANAMAN MENGGUNAKAN ALGORITMA TRANSFER LEARNING BERBASIS WEBSITE | Kontrol dan Mekatronika | LULUS |
42 | I0719017 | Azis Surya Ananda | Rancang Bangun Sistem Minimum Universal IoT-Based PV Data Logger yang Terintegrasi dengan Mobile App | Teknik Tenaga Listrik | LULUS |
43 | I0719014 | Arif | ANALISIS PLASMA CORONA DISCHARGE PADA OZON GENERATOR UNTUK PEMURNIAN AIR | Kontrol dan Mekatronika | LULUS |
44 | I0719055 | Mukhlis Dwi Nugroho | PERANCANGAN ANTENA P-BAND POLARISASI SIRKULER PADA FREKUENSI 425 MHZ UNTUK DRONE ONBOARD CP-SAR | Teknik Komputer dan Telekomunikasi | LULUS |
45 | I0719011 | Alloyus Bayu Hans Abram | PENGEMBANGAN ANTENA L-BAND UNTUK MULTIBAND CIRCULARY POLARIZED SYNTHETIC APERTURE RADAR ONBOARD UNMANNED AERIAL VEHICLE (UAV) | Teknik Komputer dan Telekomunikasi | LULUS |
46 | I0719075 | Zaidan Alvin Al Hanif | SISTEM INFORMASI PENJADWALAN PENDIDIKAN PROFESI DOKTER FAKULTAS KEDOKTERAN UNIVERSITAS SEBELAS MARET | Teknik Komputer dan Telekomunikasi | LULUS |
47 | I0719004 | Adriel Satrio Nugroho | Instalasi Sistem PLTS dan Analisis Kualitas Daya pada Pesantren Hubbul Khoir | Teknik Tenaga Listrik | LULUS |
48 | I0719041 | Maulana Afif | STUDI KELAYAKAN SISTEM HIBRID PEMBANGKIT LISTRIK TENAGA SURYA DENGAN PEMBANGKIT LISTRIK TENAGA DIESEL DI KILANG MINYAK PPSDM MIGAS CEPU | Teknik Tenaga Listrik | LULUS |
49 | I0719019 | Daffa Aminuddin | SISTEM IDENTIFIKASI PELANGGARAN PENGENDARA MOTOR PADA TROTOAR BERBASIS COMPUTER VISION MENGGUNAKAN RASPBERRY PI | Teknik Komputer dan Telekomunikasi | LULUS |
50 | I0719050 | Muhammad Raflie Pangestu | RANCANG BANGUN SISTEM INFORMASI LABORATORIUM PADA PRODI TEKNIK ELEKTRO UNS BERBASIS WEB MENGGUNAKAN METODE RAPID APPLICATION DEVELOPMENT (RAD) | Teknik Komputer dan Telekomunikasi | LULUS |
51 | I0719010 | Ali Ekatma Rendra | ANALISIS PENGARUH PENDINGIN PADA SWAP CHARGING STATION DENGAN TERMOELEKTRIK UNTUK PENGISIAN BATERAI KENDARAAN LISTRIK | Teknik Tenaga Listrik | LULUS |
52 | I0719020 | Damaris Adi Waskitho | METODE BARU PADA ACTIVE GATE DRIVER UNTUK PENYEIMBANGAN ARUS PADA RANGKAIAN MOSFET YANG DIPARALEL | Teknik Tenaga Listrik | LULUS |
53 | I0719038 | Luqman Hadi Dwi Satryo | Analisis Pengaruh Sistem Pendingin Aktif Termoelektrik Peltier Terhadap Efisiensi Daya Photovoltaic Monocrystalline 50 Wp | Teknik Tenaga Listrik | LULUS |
54 | I0719058 | Oemar Dhani Er | IMPLEMENTASI TEKNOLOGI BARCODE UNTUK SISTEM SORTIR BARANG OTOMATIS BERDASARKAN DAERAH TUJUAN BERBASIS PLC | Kontrol dan Mekatronika | LULUS |
55 | I0719061 | Putra Maulana Yusuf | PERANCANGAN SISTEM INTELLIGENT CRUISE CONTROL MENGGUNAKAN METODE KENDALI FUZZY-PID PADA PROTOTIPE KENDARAAN LISTRIK | Kontrol dan Mekatronika | LULUS |
56 | I0719031 | Hanif Wisti Julitama | RANCANG BANGUN SISTEM PENGHINDAR TABRAKAN MENGGUNAKAN MEDAN POTENSIAL PADA PROTOTIPE KENDARAAN OTONOM | Kontrol dan Mekatronika | LULUS |
57 | I0719044 | Muhammad Ardhana Gusti Syahputra | Pengembangan Lanjut Sistem Informasi Outcome Based Education pada Fakultas Teknik UNS | Teknik Komputer dan Telekomunikasi | LULUS |
58 | I0719006 | Aji Ghanang Amurwabhumi | PENINGKATAN KEANDALAN SISTEM MONITORING DAN PENGATURAN KEBUN HIDROPONIK BERBASIS IOT GUNA MENDUKUNG SMART FARMING 4.0 | Teknik Komputer dan Telekomunikasi | LULUS |
59 | I0719023 | Faiq Izzul Islami | Audit dan Monitoring dalam Rangka Analisis Potensi Penghematan Konsumsi Energi Listrik di RSUD Soedarsono Kota Pasuruan | Teknik Tenaga Listrik | LULUS |
60 | I0719074 | Wisanggeni Titovandaru | ANALISIS PERBANDINGAN MONITORING LADANG CABAI MENGGUNAKAN CITRA SATELIT SAR DAN OPTIK | Teknik Komputer dan Telekomunikasi | LULUS |
61 | I0719032 | Hayyan Yusuf | RANCANG BANGUN HELICAL ANTENA UNTUK MENINGKATKAN KUALITAS MONITORING ANTENNA TRACKER FIXED WING UAV | Teknik Komputer dan Telekomunikasi | LULUS |
62 | I0719071 | Talib Sahdha Wibowo | KLASIFIKASI JENIS DAN PENGHITUNGAN JUMLAH KENDARAAN BERBASIS PENGOLAHAN CITRA | Teknik Komputer dan Telekomunikasi | LULUS |
63 | I0719052 | Muhammad Shafiy Widi Kresno Wibisono | PERANCANGAN SISTEM ADAPTIVE CRUISE CONTROL MENGGUNAKAN METODE KENDALI PID PADA PROTOTIPE KENDARAAN LISTRIK | Kontrol dan Mekatronika | LULUS |
64 | I0719039 | Mahaputra Nur Muhammad | ANALISA PENGARUH JARAK DAN DIMENSI KUMPARAN FLAT SPIRAL TERHADAP EFISIENSI DAYA PADA TRANSMISI DAYA NIRKABEL BERBASIS ROYER OSCILLATOR | Kontrol dan Mekatronika | LULUS |
65 | I0719013 | Andika Sukma Pradana | PENGEMBANGAN ANTENA C-BAND UNTUK DRONE ONBOARD MULTIBAND CIRCULARLY POLARIZED SAR | Teknik Komputer dan Telekomunikasi | LULUS |
66 | I0719005 | Ahmad Hanif Shalahuddin | Rancang Bangun Sistem Monitoring Arus dan Tegangan untuk Plasma Arc Discharge dalam Air untuk Fabrikasi Partikel Nano | Teknik Tenaga Listrik | LULUS |
67 | I0719067 | Salsabila Ananda Putri | RANCANG BANGUN SISTEM MONITORING PEMBANGKIT LISTRIK TENAGA SURYA (PLTS) PADA KEBUN HIDROPONIK UNTUK MENDUKUNG SMART FARMING 4.0 | Teknik Tenaga Listrik | LULUS |
68 | I0719034 | Ibnu Qoyim Al-Hafidzh | PERANCANGAN GAME EDUKASI SEBAGAI MEDIA PEMBELAJARAN SEJARAH MANUSIA PURBA DI INDONESIA | Teknik Komputer dan Telekomunikasi | LULUS |
69 | I0719043 | Muchsin Ismail | PERANCANGAN GAME EDUKASI SEBAGAI SARANA PEMBELAJARAN DALAM BERLALU LINTAS YANG BENAR | Teknik Komputer dan Telekomunikasi | 351 Hari |
70 | I0719065 | Ricky Aston Susetyo | TELAAH PEMANFAATAN SISTEM PENDUKUNG KEPUTUSAN PADA ADMINISTRASI AKADEMIK UNS | Teknik Komputer dan Telekomunikasi | LULUS |
71 | I0719001 | 'Izzuddin 'Ulwan | Rancang Bangun Kontrol Kecepatan dan Fitur Switching Wheel Drive 4WD to 2WD pada Kendaraan Listrik | Kontrol dan Mekatronika | 351 Hari |
72 | I0719069 | Stefani Widyaningrum | PENGEMBANGAN SISTEM INFORMASI MANAJEMEN LAYANAN KESEHATAN PADA KLINIK BERBASIS WEB DENGAN METODE LINEAR SEQUENTIAL MODEL | Teknik Komputer dan Telekomunikasi | LULUS |
73 | I0718017 | Khilalul Hanif | PENGARUH PENAMBAHAN NANOPARTIKEL HASIL SINTESIS ARC DISCHARGE TERHADAP PERFORMA BATERAI LITHIUM ION | Teknik Tenaga Listrik | LULUS |
74 | I0719002 | Abdul Latif Priyadi | E-GOWES: RANCANG BANGUN GAME BERSEPEDA BERBASIS 3D MAP TERSINKRONISASI DENGAN SISTEM KENDALI SENSOR GYROSCOPE DAN INFRARED | Teknik Tenaga Listrik | LULUS |
75 | I0719053 | Muhammad Wildan Alfatih | SISTEM INFORMASI SMART BUILDING MANAGEMENT SYSTEM BERBASIS INTERNET OF THINGS DENGAN MENGGUNAKAN FRAMEWORK LARAVEL | Teknik Komputer dan Telekomunikasi | LULUS |
76 | I0718030 | Ramadhan Prihantono | SISTEM MONITORING DAN OPERASI ENERGI LISTRIK BERBASIS INTERNET OF THINGS PADA MAIN DISTRIBUTION PANEL GEDUNG 4 FAKULTAS TEKNIK UNIVERSITAS SEBELAS MARET | Kontrol dan Mekatronika | LULUS |
77 | I0719063 | Rebekka Siswandina Sari | RANCANG BANGUN SISTEM VEHICLE TO GRID (V2G) DAN GRID TO VEHICLE (G2V) BERBASIS MIKROKONTROLER SEBAGAI INTEGRASI SUMBER ENERGI PADA MICROGRID | Teknik Tenaga Listrik | LULUS |
78 | I0719056 | Nadya Puteri Nur Utomo | RANCANG BANGUN ALAT UKUR BERAT BADAN IBU DAN ANAK BERBASIS BLUETOOTH DAN APLIKASI ANDROID MENURUT STANDAR ANTROPOMETRI KEMENTERIAN KESEHATAN 2022 | Kontrol dan Mekatronika | LULUS |
79 | I0718012 | Gibran Dzulfikar Ghaffara | RANCANG BANGUN SISTEM PEMILAH BARANG OTOMATIS MENGGUNAKAN OUTSEAL PLC | Kontrol dan Mekatronika | LULUS |
80 | I0718022 | Muhammad Didin Kamaludin | PEMODELAN SINTESIS CARBON NANOPARTIKEL MENGGUNAKAN METODE PLASMA ARC DISCHARGE MELALUI SIMULASI DENGAN VARIASI INITIAL ELECTRON DENSITY DAN TEGANGAN | Teknik Tenaga Listrik | LULUS |
81 | I0718034 | Slash Arthur Edi Sumawang | Analisis Pengaruh Modifikasi Luasan Magnet terhadap Kinerja Permanent Magnet Synchronous Generator pada Pembangkit Listrik Tenaga Pikohidro | Teknik Tenaga Listrik | LULUS |
82 | I0718010 | Firmansyah Abada | Rancang Bangun Multistage Constant Current Charging Berbasis Boost Converter dengan Passive Balance BMS Untuk Baterai Lithium Ion | Teknik Tenaga Listrik | LULUS |
83 | I0718001 | Abraham Babtistio | Rancang Bangun Inverter Satu Fasa Berbasis Logika Fuzzy dengan Monitoring IoT | Kontrol dan Mekatronika | LULUS |
84 | I0718027 | Nur Udin Galang Ga | RANCANG BANGUN SISTEM DATA LOGGER UNTUK MONITORING PEMBANGKIT LISTRIK TENAGA MIKROHIDRO 5000 WATT DI DUSUN TANEN DESA KEMUNING BERBASIS IOT | Teknik Tenaga Listrik | LULUS |
85 | I0718013 | Hanandya Maya Shafira | PEMODELAN SINTESIS CARBON NANOPARTIKEL MELALUI METODE ARC DISCHARGE DENGAN VARIASI BENTUK DAN JARAK | Teknik Tenaga Listrik | LULUS |
86 | I0718003 | Alvian Aji Pangestu | RANCANG BANGUN SISTEM V2G DAN G2V SEBAGAI ALTERNATIF DAYA PADA MICROGRID DENGAN METODE SMART SWITCHING BERBASIS MIKROKONTROLER | Teknik Tenaga Listrik | LULUS |
87 | I0718031 | Rizal Mujaddid Irsyad | RANCANG BANGUN KOMPENSATOR UNTUK MITIGASI VOLTAGE DIP DAN PERBAIKAN FAKTOR DAYA PADA MICROGRID DENGAN MONITORING BERBASIS INTERNET OF THINGS (IOT) | Teknik Tenaga Listrik | LULUS |
88 | I0718018 | M. Fatkhi Futukhal Arifin | ANALISIS PENGARUH PENAMBAHAN BUCK-BOOST INVERTER TERMODIFIKASI TERHADAP TEGANGAN COMMON-MODE DAN RESPON MOTOR INDUKSI TIGA FASA DENGAN KONTROL VEKTOR | Teknik Tenaga Listrik | LULUS |
89 | I0718025 | Nada Syadza Azizah | RANCANG BANGUN KENDALI DAN MONITORING KECEPATAN MOTOR BLDC NIRSENSOR DENGAN DETEKSI BACK EMF | Kontrol dan Mekatronika | LULUS |
90 | I0717038 | Riski Rama Kusuma | PENGARUH MEDIA DAN ARUS PEMBENTUKAN TERHADAP RESISTANSI DAN KONDUKTIVITAS KARBON NANO PARTIKEL | Teknik Tenaga Listrik | LULUS |
91 | I0718009 | Fandi Surya Adinata | Perancangan Wireless Mesh Terenkripsi AES-128 untuk LoRa | Teknik Komputer dan Telekomunikasi | LULUS |
92 | I0718037 | Taufik Widyastama | RANCANG BANGUN MAXIMUM POWER POINT TRACKING (MPPT) PADA PANEL SURYA DENGAN METODE KONTROL HYBRID FUZZY-PID | Kontrol dan Mekatronika | LULUS |
93 | I0718020 | Mohammad Ravi Rachman | PENDARATAN PRESISI OTONOM BERBASIS PENGELIHATAN PADA QUADCOPTER | Kontrol dan Mekatronika | LULUS |
94 | I0718004 | Andhika Rizkita Putera | Rancang Bangun Automatic Transfer Switch (ATS) dengan Monitoring Berbasis Internet of Things Pada Sistem Microgrid | Teknik Tenaga Listrik | LULUS |
95 | I0718005 | Annisa Larasati Febrianingrum | PENGARUH PENGGUNAAN PASSIVE COOLING, SOLAR TRACKER, DAN REFLECTOR UNTUK EFISIENSI PHOTOVOLTAIC MONOCRYSTALLINE 60 WP BERBASIS IOT CLOUD | Teknik Tenaga Listrik | LULUS |
96 | I0714015 | Ferdiansyah Ashil Farisi | ANALISIS KARAKTERISTIK DAYA MOTOR DAN EFISIENSI DAYA PADA PENGOPERASIAN PROTOTIPE MOBIL LISTRIK | Kontrol dan Mekatronika | LULUS |
97 | I0714019 | Luthfy Makhmudy | PERANCANGAN KOMPENSATOR DAYA REAKTIF VARIABEL SEBAGAI ALAT PENGHEMAT ENERGI PADA BEBAN MOTOR INDUKSI SATU FASA ¼ HP DENGAN MONITORING BERBASIS INTERNET OF THINGS (IOT) | Teknik Tenaga Listrik | LULUS |
98 | I0714016 | Fransiskus Xaverius Rian Wicaksono | DESAIN DAN ANALISIS TEKNO EKONOMI PEMBANGKIT HIBRIDA UNTUK PEMBANGKIT ALTERNATIF DI INDONESIA | Teknik Tenaga Listrik | LULUS |
99 | I0715010 | Faris Izzaturrahman | Sistem Informasi Smartfarming Berbasis Web dengan Metode Rapid Application Development | Teknik Komputer dan Telekomunikasi | LULUS |
100 | I0718032 | Rois Hasan Muhammad | Perancangan Antena Mikrostrip Susun 2x2 Polarisasi Sirkuler Pada Frekuensi 1.275 Ghz Dalam Implementasi Sensor Satelit CP-SAR | Teknik Komputer dan Telekomunikasi | LULUS |
101 | I0718007 | Desi Sunyahni | Sistem Monitoring dan Pengaturan Suhu dan Kelembapan Kebun Hidroponik Berbasis IoT untuk Mendukung Smart Farming 4.0 | Kontrol dan Mekatronika | LULUS |
102 | I0715021 | Mohammad Izzul Mukhtar | Sistem Monitoring dan Pengaturan Nutrisi Hidroponik Berbasis IoT untuk Mendukung Smart Farming 4.0 | Kontrol dan Mekatronika | LULUS |
103 | I0718016 | Imam Arif | “Desain dan Perancangan Sistem Tracking Panel Surya Dual Axis dengan Maximum Power Point Trakcer (MPPT)” | Teknik Tenaga Listrik | LULUS |
104 | I0718006 | Catya Afif Kasudya | Pembangkit Listrik Tenaga Surya (PLTS) 60 WP untuk Kebun Hidroponik dalam Mendukung Smart Farming 4.0 | Teknik Komputer dan Telekomunikasi | LULUS |
105 | I0718023 | Muhammad Ghozy Al Hakim | SISTEM INFORMASI LAYANAN KESEHATAN PADA KLINIK BERBASIS WEB DENGAN MENGGUNAKAN FRAMEWORK LARAVEL 8 | Teknik Komputer dan Telekomunikasi | LULUS |
106 | I0789021 | testa1 | tes | Teknik Komputer dan Telekomunikasi | 679 Hari |
107 | I0717030 | Muhammad Rifai | PENGEMBANGAN LANJUT SISTEM INFORMASI OUTCOME BASED EDUCATION (OBE) DI UNIVERSITAS SEBELAS MARET | Teknik Komputer dan Telekomunikasi | LULUS |
108 | I0717024 | M. Iqbal Zidny | RANCANG BANGUN INVERTER SATU FASA DENGAN METODE SPWM BERBASIS IOT (INTERNET OF THINGS) | Kontrol dan Mekatronika | LULUS |
109 | I0717028 | Muhammad Ikyu Arqie Ramadhan | ROBOT LINE FOLLOWER DENGAN KAMERA PENGOLAH CITRA MENGGUNAKAN METODE DETEKSI KONTUR DAN PERBANDINGAN INTENSITAS GAMBAR | Kontrol dan Mekatronika | 1018 Hari |
110 | I0717029 | Muhammad Renaldy Darmawan | Rancang Bangun Sistem Monitoring dan Kendali Energi pada Automatic Transfer Switch dengan Sumber Grid-Panel Surya Berbasis Internet of Things | Kontrol dan Mekatronika | LULUS |
111 | I0717013 | Bima Damar Jati | Pengembangan Sistem Informasi Monitoring dan Manajemen Energi pada Sistem Smart Powerwall Berbasis Internet of Things (IoT) | Teknik Komputer dan Telekomunikasi | LULUS |
112 | I0717018 | Hanifah Yulia | SISTEM DETEKSI DINI BENCANA TANAH LONGSOR DAN BANJIR BERBASIS IOT (INTERNET OF THINGS) | Kontrol dan Mekatronika | LULUS |
113 | I0717032 | Muhammad Rizqi Subeno | Rancang Bangun Sistem Kemudi Otonom dengan Metode Virtual Lane-Keeping pada Kendaraan Listrik | Kontrol dan Mekatronika | LULUS |
114 | I0717014 | Bintar Yudo Sadewo | Rancang Bangun Alat Ukur Tahanan Tanah Digital Dengan Metode Fall Of Potential Dan Tegangan DC Sebagai Voltage Reference | Teknik Tenaga Listrik | LULUS |
115 | I0717007 | Attar Al Mufashal Rasyid | PERANCANGAN BIDIRECTIONAL INVERTER DENGAN IMPLEMENTASI METODE SPWM DALAM MEREDUKSI TOTAL HARMONIC DISTORTION (THD) | Teknik Tenaga Listrik | 1018 Hari |
116 | I0717039 | Sony Adyatama | BMS Ekualisasi Hibrid dengan OCV-CC untuk Estimasi State of Charge Pack Baterai | Teknik Tenaga Listrik | LULUS |
117 | I0717016 | Faishal Hanifan Ma`Ruf | PENINGKATAN KUALITAS AKURASI BER TESTER PADA SISTEM VISIBLE LIGHT COMMUNICATION BERBASIS FPGA (FIELD-PROGRAMMABLE GATE ARRAY) DENGAN KOMUNIKASI PC | Teknik Komputer dan Telekomunikasi | LULUS |
118 | I0717037 | Rifqi Paradisa | PENGEMBANGAN ITERATIF FASE KEDUA SISTEM INFORMASI PORTAL ELEKTRO UNIVERSITAS SEBELAS MARET | Teknik Komputer dan Telekomunikasi | LULUS |
119 | I0717031 | Muhammad Rifyal Abubakar | Rancang Bangun Sistem Pemantauan Sepeda Listrik Secara Realtime Berbasis Internet Of Things | Kontrol dan Mekatronika | LULUS |
120 | I0717010 | Banu Maheswara | SISTEM KENDALI KETINGGIAN UAV QUADCOPTER MENGGUNAKAN METODE KENDALI PID | Kontrol dan Mekatronika | LULUS |
121 | I0717041 | Weldino Panji Kurniadi | Rancang Bangun Panel Instalasi Listrik Rumah Susun Type 36 4 lantai | Teknik Tenaga Listrik | LULUS |
122 | I0717021 | Hisbullah Ahmad Fathoni | Analisis Metode Pengukuran Dimensi Menggunakan Pengolahan Citra Pada Sistem Prediksi Durasi Sterilisasi ULTRAVIOLET | Kontrol dan Mekatronika | LULUS |
123 | I0717033 | Muhammad Wakhid Wardani | RANCANG BANGUN ANTENA MIKROSTRIP CIRCULARLY POLARIZED PADA FREKUENSI 1.275GHz UNTUK SENSOR APLIKASI L-BAND CP-SAR | Teknik Komputer dan Telekomunikasi | 1018 Hari |
124 | I0717026 | Mohammad Raihan H. | RANCANG BANGUN ANTENA MIKROSTRIP S- BAND PADA FREKUENSI 2.35 GHz UNTUK KOMUNIKASI CIRCULAR POLARIZATION SYNTHETIC APERTURE RADAR (CP-SAR) | Teknik Komputer dan Telekomunikasi | 1018 Hari |
125 | I0717006 | Athaya Cantia Putri | Sistem Plasma Arc Discharge di Dalam Air Untuk Pembuatan Transistor Berbasis Nanopartikel | Teknik Tenaga Listrik | LULUS |
126 | I0717015 | Fahmi Ismail | RANCANG BANGUN PURWARUPA ALAT MONITORING DAN KONTROL AKUAPONIK SECARA REAL TIME DAN PORTABLE | Teknik Komputer dan Telekomunikasi | LULUS |
127 | I0717008 | Aulia Vici Yunitasari | DESAIN DAN ANALISIS TEKNO EKONOMI PEMBANGKIT LISTRIK TENAGA MIKROHIDRO ON-GRID DAN OFF-GRID DI KABUPATEN MAGETAN | Teknik Tenaga Listrik | LULUS |
128 | I0717012 | Berlianne Shanaza Andriany | Sistem Rumah Pintar dengan Baterai Back-Up serta Monitoring dan Kendali Berbasis IoT | Kontrol dan Mekatronika | LULUS |
129 | I0717017 | Gilang Satria Ajie | PERANCANGAN DAN ANALISIS MAXIMUM POWER POINT TRACKING (MPPT) PADA PANEL SURYA DENGAN METODE FUZZY LOGIC | Teknik Tenaga Listrik | LULUS |
130 | I0717035 | Nanda Hafidz Rivanda | Estimasi Remaining Useful Life (RUL) Baterai Lithium-Ion Berbasis Machine Learning | Teknik Tenaga Listrik | 1018 Hari |
131 | I0717023 | Kevin Dwiyanto Saputra | Analisis Kualitas Daya Generator Sinkron Magnet Permanen 2 kW Untuk Pembangkit Listrik Tenaga Pikohidro | Teknik Tenaga Listrik | 1018 Hari |
132 | I0717009 | Bakasrian Fericoari | RANCANG BANGUN SISTEM MANAJEMEN ENERGI PADA PANEL SURYA DENGAN METODE MPPT INCREMENTAL CONDUCTANCE | Teknik Tenaga Listrik | LULUS |
133 | I0717005 | Arif Wibowo | PERANCANGAN ELECTRONIC LOAD CONTROLLER (ELC) PADA PEMBANGKIT LISTRIK PIKOHIDRO | Kontrol dan Mekatronika | 1018 Hari |
134 | I0717004 | Alvin Ichwannur Ridho | RANCANG BANGUN WATER MANAGEMENT SYSTEM BERBASIS TEKNOLOGI LONG RANGE | Teknik Tenaga Listrik | 1018 Hari |
135 | I0717022 | Ivan Robi Septian | RANCANG BANGUN DAN ANALISIS SISTEM MONITORING PLASMA CORONA DISCHARGE PENGHASIL OZON SEBAGAI DISINFEKTAN | Teknik Tenaga Listrik | 1018 Hari |
136 | I0717002 | Agung Budi Utomo | PERANCANGAN DAN ANALISIS SISTEM PESAWAT UAV DENGAN VARIASI BATERAI | Kontrol dan Mekatronika | LULUS |
137 | I0716029 | Royani Aulia Ihsanti | Implementasi Sistem Pakar Berbasis Aturan pada Lampu Lalu Lintas Adaptif Menggunakan Peramalan Data | Kontrol dan Mekatronika | LULUS |
138 | I0717025 | M. Maulana Yusuf | ANALISA PLASMA CORONA DISCHARGE PADA OZON GENERATOR | Teknik Tenaga Listrik | 1050 Hari |
139 | I0717011 | Bayhaqi Irfani | DESAIN FAST CHARGING DENGAN MENGGUNAKAN OPEN LOOP VOLTAGE CONSTANT CURRENT- FUZZY CONTROL UNTUK BATERAI LITHIUM ION | Teknik Tenaga Listrik | 1050 Hari |
140 | I0717001 | Aditya Pratama | PERANCANGAN INSTALASI DAN ILUMINASI PENERANGAN JALAN UMUM (PJU) DENGAN SUMBER ENERGI LISTRIK DARI PEMBANGKIT PIKOHIDRO | Teknik Tenaga Listrik | LULUS |
141 | I0716002 | Adrian Seta Ekananda | Perancangan dan Analisis Sistem Kendali Motor Tanpa Sikat Arus Searah atau Brushless Direct Current (BLDC) Motor Tiga Fasa Dengan Isolated Gate Driver | Kontrol dan Mekatronika | LULUS |
142 | I0716028 | Rilo Pambudi Aditya Wardani | Sistem Kendali Posisi dengan Metode Linear Quadratic Gaussian pada VTOL (Vertical Take-Off Landing) | Kontrol dan Mekatronika | LULUS |
143 | I0716016 | Henry Probo Santoso | Navigasi Robot Keseimbangan dengan Virtual Map dan Virtual Sensor | Kontrol dan Mekatronika | LULUS |
144 | I0716027 | Oki Setiawan | Sistem Manajemen Energi Berbasis Internet of Things Menggunakan Modulasi LoRa (Long Range) | Teknik Tenaga Listrik | LULUS |
145 | I0716009 | Azis Ubaidilah | Rancang Bangun Sistem Pengisian Baterai dengan Metode Constant Current-Fuzzy Control untuk Baterai Lithium Ion | Teknik Tenaga Listrik | LULUS |
146 | I0716019 | Krisna Hakim | Desain Dan Analisa Unjuk Kerja Pembangkit Listrik Tenaga Surya 15 kW Dengan Memaksimalkan Final Yield Dan Performance Ratio Pada Perkantoran Skala Kecil-sedang | Teknik Tenaga Listrik | LULUS |
147 | I0716017 | I Wayan Yoga K | PEMODELAN DAN SIMULASI KONTROL KECEPATAN MOTOR INDUKSI TIGA FASA DENGAN ALGORITMA PID DAN FUZZY-PID | Kontrol dan Mekatronika | LULUS |
148 | I0716023 | Muhammad Fakhri Erri | Unit Commitment-Security Constraints Dengan Menggunakan Metode Priority list-Algoritma Genetika Pada Sistem IEEE 6 Bus Dan IEEE 14 Bus | Teknik Tenaga Listrik | LULUS |
149 | I0716018 | Kevin Sebastian | Sistem Informasi Manajemen Energi Berbasis Internet of Things (IoT) dengan Metode Rapid Application Development (RAD). | Teknik Komputer dan Telekomunikasi | LULUS |
150 | I0716001 | Adip Safiudin | Pengembangan Sistem Informasi Outcome Based Education (OBE) Berbasis Website dengan Metode Rapid Application Development (RAD). | Teknik Komputer dan Telekomunikasi | LULUS |
151 | I0716004 | Ahmad Imam Rauyani | PERANCANGAN PROTOTIPE LAMPU LALU LINTAS DENGAN SISTEM DATA LOGGER MENGGUNAKAN MIKROKONTROLLER ARDUINO ATMEGA 2560 | Kontrol dan Mekatronika | LULUS |
152 | I0716014 | Fuad Nur Kuncoro | Sistem Kontrol Dual Baterai Valve Regulated Lead Acid dan Lithium Ferro Phosphate (LiFePO4) Menggunakan Teknik Switching | Teknik Tenaga Listrik | LULUS |
153 | I0716026 | Musyaffa' Ahmad | Rancang Bangun Kendali dan Monitoring pada Kecepatan Motor BLDC dengan Sensor Hall | Teknik Tenaga Listrik | LULUS |
154 | I0716021 | Mohamad Nisman Falic | Optimalisasi Desain dan Analisis Ekonomi Sistem Pembangkit Hibrida sebagai Charging Station Kendaraan Listrik di Indonesia. | Teknik Tenaga Listrik | LULUS |
155 | I0716030 | Salman Al Farisi | Rancang Bangun Sistem Proteksi Cell Baterai pada Baterai Pack dengan Teknik Active Bypass Balancer. | Teknik Tenaga Listrik | LULUS |
156 | I0716033 | Wiwik Nur Winda | Optimasi Efisiensi Panel Photovoltaic (PV) Menggunakan Solar Tracker dan Heatsink Cooling. | Teknik Tenaga Listrik | LULUS |
157 | I0716012 | Daniel Aquino Purba | Perancangan dan Analisis Sistem Adaptive Cruise Control Pada Sepeda Motor Listrik | Kontrol dan Mekatronika | LULUS |
158 | I0716015 | Ghufron Husnan | Analisa Efisiensi Penggunaan Water Cooling pada Photovoltaic Cell di Solar Tracker. | Teknik Tenaga Listrik | LULUS |
159 | I0716011 | Bintang Sujatmiko | Sistem Manajemen Baterai (BMS) dengan Active Balancing Menggunakan Topologi Flyback Converter untuk Baterai Lithium Ion | Teknik Tenaga Listrik | LULUS |
160 | I0716020 | Miftahuddin Irfani | Desain Front-end Analog Signal Conditioning VLC Receiver untuk Mereduksi Gangguan Noise dari Cahaya Ambient | Teknik Komputer dan Telekomunikasi | LULUS |
161 | I0715011 | Febri Abdul Rohman | Kendali Posisi Bola Pingpong Berbasis Arduino dan LabVIEW dengan Metode PID | Kontrol dan Mekatronika | LULUS |
162 | I0715027 | Muhammad Wahid Hasyim | Telegram Chatbot Management System Berbasis Web | Teknik Komputer dan Telekomunikasi | LULUS |
163 | I0715006 | Aris Maulana Fauzan | Implementasi Metode Object Detection untuk Sistem Pengawasan Cerdas di Fakultas Teknik Universitas Sebelas Maret (UNS) Surakarta | Kontrol dan Mekatronika | LULUS |
164 | I0716034 | Yudhi Prabowo Kusuma | Sistem Informasi Portal Elektro dengan Metode Rapid Application Development (RAD) Menggunakan Framework Laravel | Teknik Komputer dan Telekomunikasi | LULUS |
165 | I0716006 | Annisa Hanifa | Pengembangan BER Tester pada Sistem Visible Light Communication Berbasis FPGA | Teknik Komputer dan Telekomunikasi | LULUS |
166 | I0716032 | Vernanda Sitorini Zul Hizmi | Sistem Kendali Posisi VTOL (Vertical Take Off Landing) dengan Metode ANFIS Menggunakan Interface Simulink | Kontrol dan Mekatronika | LULUS |
167 | I0715008 | Cesarius Adi A K | Rancang Bangun Purwarupa Sensor Aktivitas Tubuh Portabel untuk Pemantauan Kesehatan yang Kontinyu | Kontrol dan Mekatronika | LULUS |
168 | I0715002 | Aditya Nur Fauzi G | Rancang Bangun Penguat Audio Kelas D yang Dipadukan dengan Equalizer Sallen-Key | Kontrol dan Mekatronika | LULUS |
169 | I0715007 | Arthur Joshua Titus | KENDALI KECEPATAN MOTOR INDUKSI BERBASIS MIKROKONTROLER ARDUINO DAN PENGUJIAN TORSI DENGAN METODE PRONY BRAKE DYNAMOMETER | Kontrol dan Mekatronika | LULUS |
170 | I0715030 | Ramanda Fadhillah | Analisis Arus-Tegangan pada Plasma Tegangan Tinggi terhadap Muatan Listrik pada Inverter Boost Kit 15 kV | Teknik Tenaga Listrik | LULUS |
171 | I0715020 | Lia Anjarwati | Sistem Monitoring Metode Submerge Arc Discharge Berbasis Arduino | Teknik Tenaga Listrik | LULUS |
172 | I0715018 | Latif Nur Fauzi | Rancang Bangun Instrumen Power Quality Analyzer Tiga Fasa Menggunakan Low Cost USB DAQ Berbasis PC | Teknik Tenaga Listrik | LULUS |
173 | I0715037 | Yan Mahardhika Putra Perdana | Anilisis Arus-Tegangan Terhadap Daya Dan Energi Listrik Pada Pembangkit Sumber Plasma Tegangan Tinggi Dengan Media Inverter Boost 15kv | Teknik Tenaga Listrik | LULUS |
Total Bimbingan Dosen
No | NIP | Nama | Total Bimbingan | Total Bimbingan Aktif |
---|---|---|---|---|
1 | 1951100120161001 | Dr.Ir. Augustinus Sujono M.T. | 6 | 2 |
2 | 198804162015041002 | Chico Hermanu BA, S.T., M.Eng. | 22 | 6 |
3 | 1983032420130201 | Dr. Miftahul Anwar S.Si., M.Eng. | 30 | 8 |
4 | 196801161999031001 | Feri Adriyanto, Ph.D. | 37 | 5 |
5 | 199104132018031001 | Hari Maghfiroh M.Eng. | 16 | 2 |
6 | 197004041996031002 | Irwan Iftadi S.T., M.Eng. | 7 | 0 |
7 | 197705132009121004 | Meiyanto Eko Sulistyo S.T., M.Eng. | 26 | 6 |
8 | 197007201999031001 | Prof. Muhammad Nizam S.T,M.T,Ph.D. | 28 | 5 |
9 | 198812292019031011 | Muhammad Hamka I, S.T., M.Eng. | 9 | 4 |
10 | 198106092003121002 | Subuh Pramono S.T., M.T. | 7 | 2 |
11 | 198705062019031009 | Sutrisno S.T., M.Sc, Ph.D. | 39 | 5 |
12 | 199203152019031017 | Agus Ramelan, S.Pd., M.T. | 37 | 3 |
13 | 198904242019031013 | Joko Slamet Saputro, S.Pd., M.T. | 31 | 5 |
14 | 197605302002121002 | Nanang Wiyono, dr., M.Kes | 1 | 0 |
15 | 100000000000001 | Dosen1 | 2 | 2 |
16 | 197711162005011008 | Dr. Eng. Faisal Rahutomo, S.T., M.Kom. | 22 | 0 |
17 | 1111 | adminutama | 2 | 2 |
18 | 1970062520200801 | Prof. Joshapat Tetuko Sri Sumantyo Ph.D. | 9 | 3 |
19 | 197710142008011006 | Dr.Anwar Muqorobin M.T | 1 | 0 |
20 | 197609232006041004 | Joko Hariyono, S.T., M.Eng., Ph.D. | 16 | 1 |
21 | 198111252006041006 | Sunarto Kaleg, S.T., M.T. | 1 | 0 |
22 | 197911032005011003 | Dr.Eng. Pringgo Widyo Laksono S.T., M.Eng. | 3 | 0 |
23 | 196712311987121002 | Prof. Dr. Estiko Rijanto | 1 | 0 |
24 | 198304062005021001 | Ferry Purwo Saputro SST MBA | 1 | 0 |
25 | 197508282006042003 | Dr. Rina Ristiana, M.T. | 1 | 1 |
26 | 990900009 | Febry Pandu Wijaya Ph. D. | 1 | 0 |
Log Book Tugas Akhir
No | Nama | Kegiatan | Hubungan Bab | Kendala | Rencana |
---|---|---|---|---|---|
1 | Hanif Wisti Julitama | Menambahkan dasar teori mengenai topik collision avoidance, ADAS (Advanced driver-assistance system), dan topik-topik lain yang berkaitan dengan Tugas akhir. Menambahkan penelitian-penelitian sebelumnya yang berkaitan dengan mobile robot, dan metode Potential Fields yang banyak diterapkan pada mobile robot. | BAB 2 TINJAUAN PUSTAKA | tidak ada | Menerapkan dasar teori yang telah dicari ke sistem yang dibuat. |
2 | Hanif Wisti Julitama | Merumuskan rumusan masalah yang sedang dikerjakan menjadi lebih rinci dan terkait dengan judul Tugas Akhir yang dikerjakan. Memberikan latar belakang yang berkaitan dengan topik collision avoidance, dengan menambahkan data-data kasus kejadian kecelakaan pada tahun-tahun sebelumnya. | BAB 1 PENDAHULUAN | Tidak ada | Memperbaiki dan menambahkan lebih banyak data yang diperlukan. |
3 | Nadya Puteri Nur Utomo | Membuat kesimpulan berdasarkan hasil penelitian bab 4 sebagai bentuk jawaban dari rumusan masalah dan tujuan dari penelitian. Selain itu juga memberikan saran agar dapat dijadikan referensi penelitian selanjutnya. | BAB 5 KESIMPULAN | Tidak Ada | Seminar Hasil |
4 | Nadya Puteri Nur Utomo | Mengulangi kalibrasi sensor sebelum menguji alat. Kemudian, pengujian dilakukan dengan menguji hasil kalibrasi dengan beban yang sudah diketahui. Hasil pengujian ini menentukan apakah nilai kalibrasi yang didapat harus diulang atau tidak. Setelah pengujian nilai kalibrasi, juga dilakukan pengujian secara acak dengan beban yang sudah diketahui bebannya secara bergantian untuk mengetahui akurasi dan ketelitiannya. Selain itu, juga dilakukan pengujian pengukuran kepada relawan secara acak untuk mengetahui ketelitian dan keakuratan alat. Pengujian pada fungsi fitur lain pada alat juga dilakukan, seperti uji LCD, tombol on/off, reset dan tare. Pengujian tombol tare dilakukan pada relawan dan beban yang diketahui. Terakhir juga dilakukan pengujian mengenai transfer data dengan bluetooth pada alat ke aplikasi. Pengujian dilakukan beradarkan jarak dan versi bleutooth. | BAB 4 HASIL DAN PEMBAHASAN | Tidak Ada | Melanjutkan Bab 5 |
5 | Nadya Puteri Nur Utomo | Selanjutnya membuat aplikasi bawaan alat untuk menguji transfer data bluetooth dari alat ke aplikasi. Pada pembuatan aplikasi ini dimulai dengan pembuatan user flow dan flowchart aplikasi. Selanjutnya aplikasi dibuat menggunakan Kodular. | BAB 3 METODOLOGI (JALANNYA PENELITIAN) | Tidak Ada | Melakukan pengujian dan pengambilan data |
6 | Nadya Puteri Nur Utomo | Melakukan perancangan alat baik hardware atau software. Perancangan dilakukan dengan membuat diagram blok, membuat skematik, membuat layout PCB dan flowchart alat dan aplikasi pendamping. Selanjutnya dilakukan perancangan hardware dengan tahapan mencetak PCB, penyolderan, dan perakitan komponen pada body alat. Kendala pada tahapan ini adalah seringnya berganti tipe tampilan LCD, sehingga memerlukan waktu untuk membuat layout PCB yang baru, mengulangi riset mengenai LCD tersebut, dsb. Perubahan LCD ini berdampak pada jenis mikrokontroler yang akan digunakan juga. Sejauh ini, mikrokontroler yang cocok untuk LCD jenis Oled adalah ESP32. Sehingga ESP32 sudah ditetapkan sebagai jenis mikrokontroler yang digunakan. Kendala lain adalah belum bisa melakukan kalibrasi pada sensor berat model strain gauge, | BAB 3 METODOLOGI (JALANNYA PENELITIAN) | Seringnya berganti LCD tampilan Belum bisa melakukan kalibrasi pada sensor berat model strain gauge | Melakukan kalibrasi pada load cell Mulai membuat aplikasi. |
7 | Nadya Puteri Nur Utomo | Melakukan riset mengenai penelitian sebelumnya, komponen, dan software yang akan digunakan pada penelitian ini baik dari media cetak maupun media digital. Selain itu juga dilakukan diskusi mengenai spesifikasi komponen yang akan digunakan. Mengingat adanya kekurangan dan kelebihan dari masing-masing komponen. | BAB 2 TINJAUAN PUSTAKA | Belum menentukan jenis komponen yang akan digunakan. | Menentukan komponen yang akan digunakan, memperbaiki bab 2 dan melanjutkan bab 3. |
8 | Nadya Puteri Nur Utomo | Bulan November 2022, saya mengangkat projek dari tempat magang yaitu PT Solo Abadi Indonesia untuk dijadikan topik skripsi. Pada bulan tersebut saya mencoba untuk membreakdown terlebih dahulu apa yang menjadi latar belakang permasalahan tersebut. Latar belakang diambil berdasarkan keadaan lapangan langsung, pengalaman user, Peraturan Kementerian Kesehatan dan referensi cetak. Selain mencari latar belakang permsalahan ini, juga dilakukan brainstorming untuk memprediksi spesifikasi yang mungkin akan ada di Peraturan Kementerian Kesehatan 2022. | BAB 1 PENDAHULUAN | Peraturan Kementerian Kesehatan 2022 belum terbit. | Memperbaiki Bab 1 dan melanjutkan Bab 2 |
9 | Fandi Surya Adinata | Pencarian tinjauan pustaka mulai dari referensi penelitian-penelitian sebelumnya. Tinjuan pustaka kemudian dilanjutkan dengan mencari data dari tiap-tiap komponen seperti LoRa, Topologi Mesh, Enkripsi AES, hingga mikrokontroler Arduino dan sensor DHT11 yang dipakai. Penyusunan tinjauan pustaka kemudian dilakukan dan ditambahkan ke bagian BAB II. Hasil penyusunan kemudian dikonsultasikan ke pembimbing. | BAB 2 TINJAUAN PUSTAKA | Tidak ada | Penyusunan BAB III dan perancangan metode pengujian hardware |
10 | Fandi Surya Adinata | Mencari permasalahan dan menuliskan point-point latar belakang masalah, rumusan masalah, hingga batasan masalah. Pengembangan penulisan latar belakang serta penyusunan BAB I. Dilanjutkan konsultasi BAB I ke pembimbing 1 dan pembimbing 2. | BAB 1 PENDAHULUAN | Tidak Ada | Lanjut mengerjakan tinjauan pustaka di BAB II |
11 | Salsabila Ananda Putri | Mencari studi pustaka yang sesuai dengan judul yang diangkat menjadi judul tugas akhir. Mencari komponen dan spesifikasi komponen yang dibutuhkan untuk keperluan tugas akhir. Menyusun kata-kata yang sesuai dengan masing-masing komponen yang dimasukkan pada tinjauan pustaka. Mencari penelitian terdahulu yang sesuai dengan penelitian yang sedang dikerjakan saat ini sebagai referensi dan sumber ilmu penulisan. | BAB 2 TINJAUAN PUSTAKA | Tidak Ada | Melanjutkan ke bab selanjutnya untuk perencanaan dan perancangan sistem hardware maupun software yang akan dibuat |
12 | Salsabila Ananda Putri | Mencari permasalahan yang sedang terjadi dan mencari sumber penjelasan terkait dengan permasalahan tersebut. Melakukan penulisan latar belakang, rumusan masalah, tujuan, manfaat, batasan masalah, dan skema penulisan. Melakukan penyusunan bab 1 sesuai dengan format tugas akhir yang sudah diberikan pada buku panduan TA. | BAB 1 PENDAHULUAN | Mencari sumber untuk menjelaskan permasalahan yang sedang terjadi dan penyusunan kalimat yang baik | Melanjutkan ke bab selanjutnya |
13 | Abdul Latif Priyadi | Menulis tempat dan waktu pelaksanaan, lalu menentukan alat dan bahan yang digunakan dan juga membeli seluruhnya, menentukan alur metode penelitian, lalu perancangan hardware dibuat dengan menggunakan software fritzing, pembuatan kemasan dibuat dengan menggunakan corel draw, pemograman alat akan menggunakan software arduino untuk diprogram ke dalam ESP8266, perancangan software dilakukan dengan software Unity dan Microsoft Visual Studio dengan latar tempat pada game mengambil Fakultas Teknik Elektro, beberapa asset direncanakan akan dibuat sendiri ataupun mengambil asset dari Unity Asset Store, rencananya pengujian metode black box dan user accaptence testing. | BAB 3 METODOLOGI (JALANNYA PENELITIAN) | Tidak ada | Mengerjakan BAB 4 dengan membuat Game dan Alatnya langsung, lalu melakukan pengujian ke anak dengan usia sekolah dasar dan mahasiswa pada saat pameran EL-SEMAR |
14 | Abdul Latif Priyadi | Menemukan beberapa penelitian sebelumnya yaitu seperti merancang game sepeda virtual untuk rehabilitasi pasca stroke, sistem sepeda yang tersinkronisasi dengan konten 360 video derajat, game sepeda virtual dengan kontrol gerakan tangan, game sepeda VR dengan kontrol sepeda asli, dan game VR sepeda pada platform android. Mencari Tinjauan Pustaka dari seluruh komponen dan konsep yang dibutuhkan, seperti Sepeda, Video Game, Unity, C#, Blender, Low Poly 3D, ESP8266, Serial communication, MPU6050, Sensor Infrared, Pengujian Black Box, Pengujian User Acceptance Test. | BAB 2 TINJAUAN PUSTAKA | Tidak ada | Merancang Metodologi Penelitian dengan menentukan alat dan bahan yang dibutuhkan berdasarkan kuantitasnya dan langkah-langkah dalam perancangan. |
15 | Abdul Latif Priyadi | Membuat proposal : Membuat Latar belakang tentang manfaat Olahraga, Game, Penggabungan olahraga dan game. Membaca literatur terkait materi sensor-sensor yang digunakan, mencari penelitian-penelitian terkait yang berhubungan dengan permainan sepeda yang dapat dikontrol dengan sebuah alat. Membuat rumusan masalah dengan isi pertanyaan apa saja komponen penyusun, bagaimana mendesain dan mengimplementasikan software dan hardware, dan pengujian yang dilakukan. Membuat tujuan penelitian sejalan dengan rumusan masalah, manfaat penelitian, dan batasan masalah. | BAB 1 PENDAHULUAN | Tidak ada | Mencari literatur untuk Penelitian Sebelumnya terkait Game Sepeda dengan kontrol Mengerjakan BAB II |
16 | Jihan Salsabila | membuat kesimpulan berdasarkan hasil analisis yang telah dibahas pada bab 4. kesimpulan ini hasil jawaban dari rumusan masalah dan tujuan yang dituju pembuatan laporan sehingga dengan kesimpulan yang diberikan dapat memberikan penerangan pada pembaca mengenai hasil yang dibahas. | BAB 5 KESIMPULAN | tidak ada | bimbingan |
17 | Jihan Salsabila | melakukan pengolahan data dari data yang sudah diambil. data berupa penerangan dan kesesuaiannya dengan standar. juga pendingin ruangan serta nilai kesesuaiannya dengan standar dan diberikan perkiraan analisis yang akan dibahas. dalam kegiatan ini dilaksanakan berdasarkan metodologi penelitian yang telah dibahas pada bab 3. | BAB 3 METODOLOGI (JALANNYA PENELITIAN) | tidak ada | mengerjakan laporan dan pengolahan data |
18 | Jihan Salsabila | Pengambilan data tahap 3 yakni energi. data energi didapatkan menggunakan data logger dari panel MDP gedung 4. pengambilan data tersebut meliputi energi, daya, arus, tegangan dan frekuensi yang berpengaruh pada kualitas listrik yang ada di gedung. pengambilan data menghabiskan waktu beberapa minggu hingga mendapatkan nilai yang diinginkan. | BAB 3 METODOLOGI (JALANNYA PENELITIAN) | tidak ada | pengolahan data dan membuat laporan |
19 | Jihan Salsabila | pengambilan data tahap 2 (sistem pendingin). berdasarkan standar nasional indonesia, pengambilan data sistem pendingin dapat dilakukan menggunakan perhitungan metode ARI 550, sehingga penulis mengambil langkah yang sesuai dengan keputusan sni tersebut. penulis melaksanakan pengambilan data pada setiap ruangan. | BAB 3 METODOLOGI (JALANNYA PENELITIAN) | tidak ada | melaksanakan pengambilan data tahap 2 |
20 | Jihan Salsabila | mengurus perizinan untuk pengambilan data dari prodi ke fakultas. surat perizinan disahkan untuk pengambilan data yang layak dan terorganisir. waktu dan perolehan data dijelaskan pada surat yang disetujui oleh wakil dekan. dengan surat tersebut, penulis dapat mengambil data pada ruang-ruang yang ada di gedung 4 ft uns. | BAB 3 METODOLOGI (JALANNYA PENELITIAN) | tidak ada | mengambil data |
21 | Jihan Salsabila | Konsultasi mengenai pilihan audit energi bersama pembimbing 1 dan pembimbing 2. masukan yang didapatkan dari konsultasi : 1. flowchart metodologi diperjelas menggunakan paragraf 2. tinjauan pustaka harus yang sesuai dengan pembahasan. perhitungan yang tidak digunakan dan tidak bersinggungan dengan penelitian tidak perlu dimasukkan 3. daftar pustaka diperbaiki, disesuaikan dengan panduan ta teknik elektro | BAB 1 PENDAHULUAN | tidak ada | mengerjakan revisi |
22 | Jihan Salsabila | Pengambilan data (tahap 1) terkait sistem penerangan. Penulis telah membuat titik titik yang akan diukur dalam sistem penerangan dalam autocad. Berdasarkan titik-titik dalam denah tersebut penulis melakukan pengukuran data, setiap titik mendapatkan 3 data untuk kemudian di olah datanya. | BAB 3 METODOLOGI (JALANNYA PENELITIAN) | tidak ada | melakukan pengambilan data tahap 2 |
23 | Jihan Salsabila | Mempelajari terkait audit energi secara umum guna mengetahui jalannya penelitian kedepannya. Dalam literatur yang dibaca penulis, audit energi memiliki 4 tahapan agar mendapatkan rekomendasi yang tepat untuk dilaksanakannya manajemen energi. Berdasarkan literatur, audit energi merupakan 2 tahapan paling awal dalam manajemen energi sehingga adanya kegiatan audit energi ini sangat berguna dan memang seharusnya dilaksanakan pada suatu bangunan dalam kurun waktu tertentu. | BAB 2 TINJAUAN PUSTAKA | tidak ada | Mempelajari terkait sistem pendingin dan sistem tata udara. |
24 | Jihan Salsabila | Mempelajari tentang sistem pencahayaan. Sistem pencahayaan berdasarkan literatur terkait konversi sistem penerangan dapat diukur menggunakan lux meter dengan perhitungan 1x1 meter untuk ruangan <50m. 1x3 meter untuk ruangan 50-100m. dan 1x5 meter untuk ruangan >100m. Namun standar yang berlaku pada tahun 2011 memiliki banyak perubahan dan penulis belum menemukan literatur yang menggunakan literatur terbaru, sehingga titik yang digunakan penulis adalah titik yang disarankan SNI tahun terbaru. Penulis akan membuat titik pengukuran dalam autocad. | BAB 2 TINJAUAN PUSTAKA | Tidak ada | Membuat titik pengukuran dalam denah menggunakan autocad |
25 | Jihan Salsabila | Membuat proposal. Mempelajari terkait sistem pendingin/tata udara dan perhitungannya sesuai standar yang dirujuk pada standar nasional indonesia. perhitungan yang berada di dalam SNI memiliki fungsi berbeda yang diharapkan penulis sehingga diperlukannya riset lebih lanjut terkait perhitungan yang memungkinkan dapat dilaksanakan. Berdasarkan hasil literatur, ditemukan standar ARI terkait dengan refrigerator yang memungkinkan penulis untuk menggunakan standar tersebut. | BAB 1 PENDAHULUAN | tidak ada | Mempelajari standar ARI dan menelusuri terkait sistem tata udara |
26 | Khilalul Hanif | Pengolahan data hasil pengujian charge discharge baterai lithium ion dengan nanopartikel hasil sintesis arc discharge sebagai anoda baterai. Pengolahan data dilakukan menggunakan software originlab. Kegiatan dilakukan di kosan penulis | BAB 4 HASIL DAN PEMBAHASAN | Tidak ada | Analisis data |
27 | Khilalul Hanif | Proses pengujian baterai lithium dengan nanopartikel hasil sintesis arc discharge sebagai anoda baterai. Pengujian yang dilakukan adalah pengujian charge discharge pada baterai untuk melihat kapasitas baterai. | BAB 3 METODOLOGI (JALANNYA PENELITIAN) | Tidak ada | Pengolahan data |
28 | Khilalul Hanif | Proses perakitan baterai lithium ion dengan menambahkan nanopartikel hasil sintesis arc discharge. Perakitan baterai dilakukan di laboratorium PUI Baterai, Pusat Pengembangan Bisnis, Universitas Sebelas Maret | BAB 3 METODOLOGI (JALANNYA PENELITIAN) | tidak ada | Melanjutkan pengujian baterai |
29 | Khilalul Hanif | Pembuatan nanopartikel dengan metode plasma arc discharge. Kegiatan dilakukan di sub laboratorium kimia laboratorium pusat universitas sebelas maret. Pembuatan nanopartikel memakan waktu selama kurang lebih 3 minggu. | BAB 4 HASIL DAN PEMBAHASAN | tidak ada | Proses perakitan baterai |
30 | Rebekka Siswandina Sari | Setelah seluruh system terpasang maka dilakukanlah pengujian untuk pengambilan data dan pembahasan serta penarikan kesimpulan. Pertama dilakukan dengan pembacaan seri baterai di simulasikan dengan pembacaan saklar pada sistem konfigurasi baterai yang digunakan pada penelitian yaitu 12 dan 15 seri. Kondisi nyata dibuat dengan pembacaan seri melalui komunikasi CAN pada BMS. Selanjutnya keberhasilan pembacaan mode serta dengan melihat akurasi dari sensor yang digunakan. Sistem G2V dan V2G berbasis mikrokontroller mampu mengintegrasikan antara PLTS, BEV dan Grid dengan menggunakan enam mode. Berdasarkan pembacaan nilai tegangan pada PLTS dan baterai secara real time menggunakan sensor pada sistem kontrol dengan keberhasilan pembacaan logika mode 100% dengan mode V2G nya adalah mode 4 serta mode 5. Sistem ini mampu diimplementasi dengan berbagai jenis baterai karena alur logika diatur dengan pembacaan seri melalui komunikasi dengan BMS pada serial CAN.Masa pakai baterai yang sering menjadi polemic dalam pengembangan sistem G2V dan V2G, diatasi dengan memastikan baterai hanya berada pada kondisi suhu normal yaitu dibawah 40℃. menaikkan nilai batas bawah menjadi 2,7V pada satu cell baterai LFP sehingga tidak terjadi deep discharging dan penurunan batas atas menjadi 3,55 sehingga tidak terjadi overcharge. Akurasi dari sensor yang digunakan untuk penentuan sistem G2V dan V2G dengan metode MAPE adalah sebesar 99,7% dan 96,33% untuk sensor tegangan dan arus baterai, 99,05% dan 95,57% untuk sensor tegangan dan arus PLTS. Dengan nilai lebih 95% maka kondisi sistem kontrol dinyatakan layak. | BAB 5 KESIMPULAN | Tidak Ada | Mendaftar Seminar Hasil |
31 | Rebekka Siswandina Sari | Simulasi yang sudah berjalan sesuai kondisi menandakan bahwa system G2V dan V2G layak dan mampu untuk dikembangkan lebih lanjut. Untuk itu dimulailah percobaan pada tiap sensor agar dapat dikalibrasi dan dilihat bagaimana pengukurannya. Pada percobaan ini dipastikan pembali MCP dapat melakukan pembacaan dengan baik, kemudian sensor pembagi tegangan dapat membaca tegangan secara tepat dan akurat. Nilai dari pembagi tegangan yang digunakan adalah 100k dan 4,7k untuk baterai dan 100k serta 2,7 k untuk PLTS. Sensor ACS3712 untuk arus baterai dan arus PV sebesar 30A lalu nilai tersebut di kalibrasikan dengan pemberian offset sesuai dengan pembaacaanyya. Kemudian percobaan dengan sensor PZEM 004-tuntuk dapat mengukur arus pada beban AC sehingga dapat terbaca peningkatan kebutuhan beban. Percobaan relay juga dilakukan sehingga dapat menyala atau matikan stop kontak sebagai representasi dari PLN. Setelah seluruh sensor yang ingin digunakan dapat dipastikan bekerja maka dimulailah penyusunan pin Arduino yang digunkana dan dipsangkan pada PCB. Penyusunan dengan menggunakan jumper yang dihubungkan pada tiap kaki dari header arduino. Setelah berjalannya seluruh system maka dilakukan pengetesan terhadap jalur-jalur yang terpasang dengan menggunakan multimeter agar memastikan tidak ada yang memiliki koneksi ganda dan mampu untuk bekerja dengan baik. Setelah itu dilakukan pemasangan terminal blok sehingga system control dapat diintegrasikan dengan keselurhan komponen yang dsudah terpasang pada panel box. | BAB 4 HASIL DAN PEMBAHASAN | Tidak Ada | Melakukan pengujian pada sistem yang sudah terintegrasi |
32 | Rebekka Siswandina Sari | Kendala yang terjadi dikarenakan kurangnya tanda = pada kolom pendefinisan berjalannya system sehingga perulangan hanya stuck pada kondisi mode pertama yang didefinsikan saja. Setelah berhasil berjalannya system maka dilakukan diskusi dengan dosen pembimbing agar seluruh system yang berjalan sudah sesuai dengan kesepakatan. Setelah itu, dilakukan pengujian simulasi. Pengujian simulasi sistem G2V dan V2G poin utamanya adalah untuk memastikan alur kabel , komponen dan rangkaian yang dibuat telah sesuai atau masih memerlukan modifikasi. Setelah itu, program yang telah dibuat akan dijalankan sehingga dapat dipastikan Arduino melakukan tugasnya dengan baik sebagai pengontrol. Output yang diharapkan pada virtual terminal adalah hasil pembacan dari seluruh sensor , sistem tegangan baterai yang berjalan serta mode yang dibaca. Pembacaan mode menjadi hal yang sangat krusial karena harus spesifik sesuai pembacaan tegangan panel surya dan baterai juga suhu baterai seperti pada algoritma yang dibuat, serta memastikan jalur aliran daya yang aktif Hasil yang diharapkan adalah relay mampu berjalan sesuai alur serta pada virtual terminal tertampil pembacaan seperti yang diinginkan pada LCD I2C 20x4 pada hardware. serta diambil nilai akurasi dari setiap sensor kemudian pembacaan seri | BAB 4 HASIL DAN PEMBAHASAN | Pembacaan suhu pada virtual terminal yang membutuhkan delay cukup lama sehingga akan menjadi pertimbangan di hardware, serta persiapann untuk penyusunan sistem kontrol hardware | Melakukan kalibrasi sensor, percobaan seluruh sensor dengan sistem yang sama ketika diintegrasikan serta perakitan pada PCB. |
33 | Rebekka Siswandina Sari | Perancangan simulasi sistem G2V dan V2G sangat diperlukan guna melihat apakah rancangan alat yang dibuat nantinya dapat berjalan dengan baik atau membutuhkan penyesuaian kembali. Hasil dari simulasi yang dibuat haruslah menunujukan kesesuaian dengan algoritma dan sistem yang telah dirancang. Simulasi dilakukan dengan menggunakan software Proteus dengan mengatur kendali SSR dan relay AC yang telah ditetapkan untuk menyesuaikan mode yang akan diaktifkan. Komponen yang dipakai pada simulasi ini adalah VSOURCE DC sebanyak dua buah sebagai pengganti PLTS dan baterai serta VSINE sebagai masukkan grid. Kemudian untuk indikator aktif atau tidaknya jalur digunakan LED, serta karena tidak memungkinkan simulasi pembacaan komunikasi maka diganti dengan pembacaan saklar untuk menjalankan sistem 12 seri atau 15 seri. Sensor-sensor yang digunakan bersesuaian dengan realita yang dibuat yaitu, sensor tegangan dengan pembagi tegangan, sensor ACS, dan sensor suhu DS18B20 kecuali sensor PZEM yang pembacaan arusnya digantikan dengan ACS. Tampilan pada simulasi tidak dapat menggunakan LCD karena jumlah pin yang tidak memadai sehingga diganti dengan virtual terminal Rangkaian simulasi yang telah selesai dibuat membutuhkan program sehingga dapat menjalankan sistem tersebut. Selanjutnya dilakukan pembuatan program pada software Arduino IDE dengan menyesuaikan flowchart yang telah dibuat sehingga dapat menggambarkan kondisi nyata sistem G2V dan V2G. Untuk memastikan koding yang dibaca sudah sesuai makan dilakukan compile dan nantinya diujikan pada Proteus. | BAB 3 METODOLOGI (JALANNYA PENELITIAN) | Berjalannya mode tidak bisa dibaca secara keseluruhan | Dilakukan studi literatur kembali terkait penyusunan algoritma dan logika agar perulangan dapat berjalan sebagaimana yang diharapkan |
34 | Rebekka Siswandina Sari | Karena adanya kesulitan dalam system control mulai dari kalibrasi dan pemilihan yang sesuai, maka dilakukan terlebih dahulu pembuatan desain dari system hardware secara keseluruhan. hal ini dikarenakan sudah diputuskannya terminal blok yang digunakan, aliran wiring yang dipilih serta susunan yang akan dilakukan. Pendesainan dilakukan dengan menggunakan software autocad untuk melakukan penggambaran pada combier box yang akan diinstalasi. Setelah melakukan pendesainan maka dilakukan instalasi seluruh komponen pada panel box dengan melakukan pengeboran pada panel box, lalu menempelkan seluruh komponen pada box dengan menggunakan mur baut. Sebagai bentuk kerapian juga dilakukan perhitungan untuk jalr wiring dengan menggunakan cable duct sehingga kabel yang dipakai tidak terlihat berantakan. Setelah itu diinstal seluruh system dan dilakukan perhitungan pada kabel yang digunakna. dikarenakan asumsi arus maksimalnya mencapai 30A maka untuk keamanan dpilih kabel 6mm2 yang terhubung pada PLTS serta baterai sehingga Ketika arus maksimal bekerja tidak menimbulkan kebakaran dan sebagainya. Busbar juga dipilih dengan system arus yang besar sehingga dapat bekerja dengan baik dan menimbulkan masalah. Setelah terinstal dilakukan percobaan pada solid state relaynya yang telah dipasang pada terminal blok untuk melihat apakah system bekerja atau tidak, dan dapat dilanjutkan dengan penginstalan untuk seluruh system control yang ada. | BAB 3 METODOLOGI (JALANNYA PENELITIAN) | Melakukan pemasangan kabel pada seluruh sistem karena diameter yang lumayan, dan penginstalan sistem kontrol untuk berjalannya sistem G2V dan V2G | Mencoba seluruh sensor yang sudah ditetapkan, melakukan kalibrasi dan penginstalan pada PCB sehingga dapat berjalan |
35 | Rebekka Siswandina Sari | Selanjutnya diputuskan bahwa mode hybrid harus tetap terjadi sehingga adanya kelebihan energi dapat dimaksimalkan seacara tepat. mode 4 untuk mencegah fluktuaasikenaikan beban sementar mode 3 ketika hasil PLTS begitu tinggi. Variasi mode ketiga merupakan mode hybrid antara charging baterai dari PLTS melalui SCC keluaran baterai serta dari SCC keluaran beban menuju microgrid. Mode ini terjadi karena PLTS memiliki nilai tegangan yang menyanggupi SCC untuk dapat melakukan pengecasan. Perbedaan dengan variasi mode kedua adalah ketika nilai tegangan baterainya sudah melebihi tegangan nominal namun produksi PLTS lebih dari nilai tegangan minimal untuk pengecasan. Guna pemanfaatan dan memaksilkan hasil darii PLTS maka relay keluaran beban dari SCC diaktifkan sehingga energi yang dihasilkan dapat dimaksimalkan. Pada mode ini selain tegangan PLTS juga diperhatikan tegangan baterai sehingga tidak terjadi overcharging dan suhu baterai agar tidak terjadi overheat selama proses pengisian sama seperti mode sebelumnya. Pada mode ini dapat dikatakan bahwa sistem yang berjalan adalah sistem G2V. Aliran daya yang aktif adalah dari PLTS menuju SCC keluaran baterai akan melakukan charging baterai , serta dari SCC keluaran beban menuju microgrid sehingga nantinya dapat disalurkan ke beban Variasi mode keempat juga merupakan mode hybrid namun untuk mode ini adalah antara discharging baterai menuju microgrid serta dari SCC keluaran beban menuju microgrid. Mode ini terjadi karena adanya fluktuatif beban pada gedung ataupun rumah, dengan penetapan nilai lebih dari penghasilan daya rata-rata PLTS yaitu 5A.. Guna pemanfaatan dan memaksilkan hasil dari daya melalui sumber energi BEV dan PLTS dan mencegah kenaikan biaya karena beban yang fluktuatif maka ketika tegangan BEV sudah melebihi tegangan nominalnya mode ini diaktikan. Pada mode ini selain tegangan PLTS juga diperhatikan tegangan baterai sehingga tidak terjadi overdischarging, suhu baterai agar tidak terjadi overheat selama proses pelepasan dan juga keluaran arus pada beban menggunakan sensor PZEM 0004-t. Pada mode ini dapat dikatakan bahwa sistem yang berjalan adalah sistem V2G. Aliran daya yang aktif adalah baterai dan PLTS menuju SCC keluaran beban yang dialirkan menuju microgrid sehingga nantinya dapat disalurkan ke beban | BAB 3 METODOLOGI (JALANNYA PENELITIAN) | Membuat sistem kontrol agar mode dapat berjalan dengan baik | Berdiskusi terkait sensor pada sistem kontrol serta penginstalannya |
36 | Rebekka Siswandina Sari | Setelah diputuskan untuk penentuan mode yang digunakan yaitu adanya pemfokusan PLTS , kemudian kondisi dimana grid PLN ikut melakukan supply karena sumber PLTS yang fluktuatif sehingga tidak dapat melakukan charging secara terus menerus. Untuk itu diputuskan untuk berjalannya 6 mode yaitu Variasi mode yang pertama ini merupakan kondisi yang hanya memfokuskan input dari PLTS menuju microgrid. Mode ini terjadi karena PLTS tidak mampu melakukan charging sebab pada datasheet SCC dijelaskan bahwa untuk dapat melakukan charging nilai tegangan yang dihasilkan harus berada pada 3V lebih dari sistem tegangan baterai ataupun ketika tidak terdeteksinya baterai yang membutuhkan pengecasan. Sebagai contoh ketika digunakan sistem baterai 36 V maka nilai tegangan PLTS haruslah 39 V maka SCC dapat melakukan pengecasan. Aliran daya yang aktif adalah dari PLTS menuju SCC lalu melalui keluaran beban akan menuju buck converter dan disimpan pada microgrid sehingga nantinya dapat disalurkan ke beban Variasi mode kedua berfokus pada charging baterai dari PLTS melalui SCC. Mode ini terjadi karena PLTS sudah mampu melakukan charging sebab pada datasheet SCC dijelaskan bahwa untuk dapat melakukan charging nilai tegangan yang dihasilkan harus berada pada 3V lebih dari sistem tegangan baterai. Sebagai contoh ketika digunakan sistem baterai 36 V dan nilai tegangan PLTS telah mencapai 39 V atau lebih maka SCC dapat melakukan pengecasan. Pada mode ini selain tegangan PLTS juga diperhatikan tegangan baterai sehingga tidak terjadi overcharging dan suhu baterai agar tidak terjadi overheat selama proses pengisian. Pada mode ini dapat dikatakan bahwa sistem yang berjalan adalah sistem G2V dan hal ini kebalikan dari mode 5 untuk charging serta tanpa PLTS dengan mode 6. | BAB 3 METODOLOGI (JALANNYA PENELITIAN) | Mode 3 dan 4 masih diputuskan apakah akan berjalan dan fungsinya bagaimana secara tepat | Melakukan fiksasi mode dan aliran daya yang aktifnya |
37 | Rebekka Siswandina Sari | Pada minggu pertama September dapat diselesaikan pembacaan seri dengan modul MCP2515 melalui pembacaan BMS dengan komunikasi CAN. diputuskan pembacaan dengan pendefinisianjumalh sel selalu pada jumlah tertinggi dari BMS yaitu 15 seri, dengan adanya perulangan if yang mengharuskan nilai dari cell tersebut lebih dari 0 sehingga menandakan bahwa sel yang mengirim tegangan hanyalah sel yang aktif. Setelah berhasil mengirimkan dan membaca melalui komunikasi CAN tersebut maka Langkah selanjutnya adalah penyusunan system secara keseluruhan. Dilakukan bimbimngan untuk menentukan spesifikasi relay yang digunakan, hal-hal yang menjadi bagian penting dalam berjalannya system G2V dan V2G. Hla yang masih kurang dan membutuhkan tambahan dari system terdahulu sehingga adanya peningkatan pada system G2V dan V2G yang dibuat. Setelah itu dilakukan pencarian ketersediaan di pasaran terkait komponen yang dibutuhkan. Spesifikasi yang dipilih setelah berdiskusi disesuaikan dengan penelitian terdahulu agar dapat melakukan pengujian pada spot yang sama sehingga tidak memerlukan biaya tambahan untuk keseluruhan system yang akna diintegrasikan. Setelah mendapatkan seluruh data maka dilakukan perhitungan secara teknis agar memastikan seluruh sensor , wiring dam hal kllainnya yang digunakan sudah menyesuaikan prosedur dan tidak membahaykan. Penentuan letak pengujian, waktu serta mode-mode yang perlu untuk diperhatikan juga menjadi bahasan sehingga dapat diputuskan mode yang bekerja | BAB 3 METODOLOGI (JALANNYA PENELITIAN) | Penentuan mode untuk kondisi G2V dan V2G | Melakukan diskusi dan penentuan kapan dan kondisi bagaimana sistem G2V dan V2G aktif |
38 | Rebekka Siswandina Sari | Pada minggu keempat bulan agustus saya mulai fokus mempelajari mengenai komunikasi CAN. Pada awalnya komunikasi yang diharapkan adalah system yang dapat membaca komunikasi dengan seluruh jenis BMS yang ada. Namun, hal ini menjadi sulit karena harus melakukan crack terlebih dahulu agar dapat mempelajari jenis kiriman pada BMS, namun karena keterbatasan waktu maka setelah berdiskusi dengan dosen pembimbing diputuskan untuk melakukan pembacaan dengan bekerjasama dengan BMS yang dikembangkan secara mandiri. Saat ini yang sedang dikembangkan adalah BMS milik lpdp inka yang juga menggunakan komunikasi CAN. Setelah mendapat persetujuan dan akses kemudian saya mempelajari terkait IC yang menjadi pengiriman data pada BMS tersebut serta bagaimana pembuatan CAN dapat dibangun hingga akhirnya dapat diterima dan dibaca oleh mikrokontroller lainnya. Didapatkan kunci pembacaan dengan H dan L, lalu hal tersebut disesuaikan d engan message ID yang dapat diterima dan diolah oleh sensor MCP2515. Pembacaan diputuskan untuk jumlah seri 12 dan 15 setelah hasil diskusi dengan dosen pembimbing karena konfigurasi tersebyt menjadi konfigurasi yang sering digunkan pada baterai kendaarann listrik. Pada pengembangan BMS yang dipakai adalah untuk rangkaian 9-15 seri namun yang digunakan adalah 12 seri, sehingga dilakukan dahulu percobaan pembacaan untuk rangkaian 12 seri dengan struct frame yang dikirimkan, setelah berhasil dilakukan pembelajaran lebih lanjut untuk dapat mengirimkan data 15 seri tersebut. | BAB 2 TINJAUAN PUSTAKA | Pembacaan seri masih dipelajari lebih lanjut berdasarkan studi pustaka yang ada sehingga MCP cukup diprogram sekali agar dapat menerima berbagai jenis BMS, dan BMS diatur agar dapat mengirimkan sesuai jumlah seri yang digunakan | Mengimplementasikan satu logika dengan MCP agar dapat dipakai oleh tiap pak baterai beserta modul tanpa harus menyesuaikan jumlah seri, namun ia dapat menerima berbagai jenis kiriman berbeda dan mendefisinikan konfigurasinya, |
39 | Rebekka Siswandina Sari | Pada minggu pertama bulan agustus, dimulai dari tanggal 3 saya melakukan riset terkait masalah dan isu yang sedang ramai dibicarakan serta memiliki urgensi yang tinggi. Setelah melakukan riset didapatkan mengenai isu kendaraan istrik serta PLTS. Hal tersebut kemudian saya diskusikan bersama dosen pembimbing sehingga dapat diputuskan topik bahasannya berkenaan dengan PLTS dan kendaraan listrik yang diintegrasikan dalam system G2V dan V2G. Maka setelah itu dillakukan studi literatur yang berfokus pada topik V2G dan G2V yang kebetulan juga sudah dibahas oleh peneliti terdahulu dari mahasiswa Teknik elektro uns. Setelah itu, saya melakukan riset dan pembaacan saran dari draft tersebut, dan mencari tambahan jurnal referensi sehingga dapat menentukan masalah, bahasan serta studi Pustaka yang memiliki relevansi. Pembahasan selanjutnya saya lanjutkan dengan penyusunan bab 1 dan bab 2 sesuai dengan referensi yang sudah didapatkan yang kemudian saya kembali bahas dengan dosen pembimbing. Didapatkan bebrapa perubahan mulai dari pemilihan jenis relay yaitu dari kontaktoe diubah menjadi solid state relay larena lebih kedap suara sebab tidak memerlukan kontak mekanik, lalu pembuatan mode yang lebih ringkas dan mudah dipahami sehingga setiap system berjalan sesuai jalannya. Kemudian penggantian secara otomatisasi untuk dpaat melakukan pemvbacaan CAN secara tepat guna dengan menggunakan MCP2515 melalui komunikasi BMS yang telah terhubung pada baterai. | BAB 1 PENDAHULUAN | Kendala yang dihadapi adalah terkait penentuan BMS yang digunakan untuk dapat mengirimkan jumlah cell dengan komunikasi CAN | Mempelajari komunikasi CAN antara BMS dan sistem kontrol |
40 | Abraham Babtistio | Menambahkan referensi dan melengkapi data untuk melengkapi analisis data. Melihat dan mengamati data kembali untuk menambahkan analisis yang relevan dan penting terhadap hasil penelitian sehingga didapatkan kesimpulan yang tepat. Konsultasi dengan dosen pembimbing. | BAB 5 KESIMPULAN | - | - |
41 | Abraham Babtistio | Melakukan pengolahan data dan membandingkan hasil efisiensi dan THD sistem dengan dua algoritma yang berbeda (fuzzy dan non-fuzzy). Melihat apakah hasil dari penelitian sudah sesuai dengan rumusan masalah dan latar belakang dan menganalisis apakah hasil penelitian sesuai dengan harapan atau tidak. | BAB 5 KESIMPULAN | tidak ada | melakukan penyusunan naskah dan merapikan naskah. evaluasi hasil penelitian untuk mendapatkan saran yang baik |
42 | Abraham Babtistio | Pengujian sistem Internet of Things UBIDOTS dengan menggunakan rangkaian final UBIDOTS yang sudah jadi. Dilihat apakah data yang masuk ke UBIDOTS sesuai dengan data serial monitor Arduino. Melihat kelengkapan data UBIDOTS. Melihat respon UBIDOTS dengan pergantian beban apakah UBIDOTS mampu menampilkan data dengan benar | BAB 4 HASIL DAN PEMBAHASAN | tidak ada | Selanjutnya dilakukan penulisan dari bab 1, bab 2, bab 3, bab 4, dan bab 5. Konsultasi kembali dengan dosen pembimbing mengenai data. |
43 | Abraham Babtistio | Menguji rangkaian inverter dengan variasi pembebanan yaitu no load, beban 15W (kipas), beban 25W (bohlam), beban 40W (bohlam), dan beban 50W. Mengamati bentuk sinyal dan respon sistem. Melakukan pengambilan data yang berupa efisiensi (daya input dengan daya output) serta melihat THD inverter. | BAB 4 HASIL DAN PEMBAHASAN | tidak ada | Melakukan penyusunan laporan akhir dengan mengolah data. Membuat tabel dengan excel kemudian pengolahan data grafis menggunakan Origin. Konsultasi kembali dengan pembimbing |
44 | Abraham Babtistio | Menyusun rangkaian inverter final, diujikan kembali apakah bekerja dengan baik. Mengamati bentuk sinyal dan frekuensi, serta menguji inverter dengan memberi beban (belum mengambil data terlebih dahulu). Kalibrasi respon fuzzy pada koding Arduino kemudian diuji kembali dengan beban untuk melihat responnya |